2010-09
CIVIL ENGINEERING SERVICES PROPOSAL/AGREEMENT
FOR
3RD STREET IMPROVEMENTS
CITY OF CLERMONT
Engineer:
Duane K. Booth, P.E.
BOOTH, ERN, STRAUGHAN & HIOTT,
350 North Sinclair Avenue
Tavares, Florida 32778
(352) 343-8481 Phone
(352) 343-8495 Fax
Client:
Cheryl Parker, Engineer I
INC. CITY OF CLERMONT
685 West Montrose Street
Clermont, Florida 34711
(352) 241-7335 - Phone
(352) 394-2379 - Fax
cherylparker@clermontfl.org
PROJECT: 3RD Street Improvements, Clermont, Florida
CLIENT: Cheryl Parker, Engineer I, City of Clermont
DATE: February 18, 2010
PROPOSAL FOR SERVICES
SCOPE OF SERVICE:
Prepare stormwater calculations, retention pond design, details and application to St.
Johns River Water Management District (SJRWMD) based upon construction plans
prepared by the City of Clermont.
TASK I GEOTECHNICAL INVESTIGATION
Perform two (2) 15 foot deep borings to classify soil, identify depth to groundwater
and confining layer, estimate seasonal high groundwater, and make
recommendation for aquifer parameters for stormwater design. See attached
proposal prepared by Andreyev Engineering, Inc.
FEE $1,070.00
TASK II STORMWATER DESIGN & PERMITTING
Prepare stormwater calculations and application to SJRWMD. SJRWMD submittal
package shall include construction plans prepared by the City of Clermont,
stormwater calculations, required exhibits, application for 40C-42 Permit and
application fee. This task shall include coordinating with City staff for pond(s)
design and responding to any RAI's as requested by SJRWMD.
Preliminary stormwater design will be performed once 30% plans are received, final
design and calculations will be completed with 60% plans and submitted to
SJRWMD, and final details, rai's, and quality control will be performed at 90% plans.
Design shall also include design of stormwater collection and conveyance system,
roadway spread calculations, and storm pipe calculations.
Drafting and details of the storm collection system to be by the City and checked by
B.E.S.H.
FEE $10,800.00
TASK III PROJECT ADMINISTRATION
The scope of services shall include administrative services necessary to coordinate
all aspects of the project through the planning, design and permitting phase. These
services shall include project scheduling with all regulatory agencies and public
utility companies during the design and permitting phase of the project.
2
PROJECT: 3RD Street Improvements, Clermont, Florida
CLIENT: Cheryl Parker, Engineer I, City of Clermont
DATE: February 18, 2010
This task will also include three (3) design meetings with City staff and response to
two (2) rai's with SJRWMD.
FEE $3,800.00
TASK 999 REIMBURSABLES
Blueprints, copies, mylars, reproductions, postage, etc.
FEE $600.00 (BUDGET)
NOTE: Reimbursables to be billed based upon direct expense incurred by
Booth, Ern, Straughan & Hiott, Inc.
SUMMARY FEE SCHEDULE
TASK I $ 1,070.00
TASK II $ 10,800.00
TASK III $ 3,800.00
TASK 999 $ 600.00
TOTAL $ 16,270.00
3
PROJECT: 3RD Street Improvements, Clermont, Florida
CLIENT: Cheryl Parker, Engineer I, City of Clermont
DATE: February 18, 2010
THIS PROPOSAL DOES NOT INCLUDE THE FOLLOWING ITEMS:
1. Boundary Survey
2. Topography Survey
3. Soil Boring Location Stake Survey
4. Environmental Assessments
5. Army Corp. of Engineers Dredge and Fill
6 Landscape/Irrigation Plans
7. Monumentation of wetlands
8. Sketch and Descriptions for Conservation Easements
9. Fema CLOMR
10. FEMA Map Amendment
11. NPDES Permitting
12. Hardscape, Walls, Entry Features
13. Lighting Design
14. Game and Fish Permit
15. Bid Documents & Bidding
16. Tree Survey
17. Advance of permit fees, impact fees, title search fees, recording or
advertising fees
4
PROJECT: 3RD Street Improvements, Clermont, Florida
CLIENT: Cheryl Parker, Engineer I, City of Clermont
DATE: February 18, 2010
HOURLY RATE SCHEDULE
(2010)
Professional Services shall be charged at the following rate schedule:
ENGINEERING
PROFESSIONAL ENGINEER PRINCIPAL $145.00/HOUR
PROFESSIONAL ENGINEER $130.00/HOUR
PROJECT ENGINEER $110.00/HOUR
ENGINEER TECHNICIAN I $95.00/HOUR
ENGINEER TECHNICIAN II $75.00/HOUR
SENIOR PLANNER - AICP $110.00/HOUR
PLANNING TECHNICIAN $75.00/HOUR
CONSTRUCTION ENGINEER $85.00/HOUR
SURVEYING
PROFESSIONAL SURVEYOR PRINCIPAL $145.00/HOUR
PROFESSIONAL SURVEYOR $110.00/HOUR
3 MAN FIELD CREW $145.00/HOUR
2 MAN FIELD CREW $125.00/HOUR
CREW UTILIZING GLOBAL POSITIONING SYSTEM $150.00/HOUR
SURVEY TECHNICIAN I $95.00/HOUR
SURVEY TECHNICIAN II $75.00/HOUR
SURVEY TECHNICIAN III $30.00/HOUR
TITLE RESEARCHER $110.00/HOUR
PROJECT: 3RD Street Improvements, Clermont, Florida
CLIENT: Cheryl Parker, Engineer I, City of Clermont
DATE: February 18, 2010
All printing for this project shall be billed out at the following rate schedule, plus sales tax:
(Outside Copying Services will be billed at cost)
Engineering Bond Copies
Black & White
11 x 17 .........................................$1.25
24 x 36 ......................................... $2.50
Color Copies
11 x 17 .........................................$2.00
24 x 36 ......................................... $6.00
Black & White Copies
8'/2 x 11 .........................................$0.10
8'/s x 14 .........................................$0.15
11 x 17 ..........................................$0.20
Color Copies
8'/z x 11 .........................................$1.20
8'/2 x 14 .........................................$1.45
11 x 17 ..........................................$1.70
Other Printing Services
24 x 36 Vellum .....................................$9.00
24 x 36 Mylar ......................................$12.00
24 x 36 Photo Paper, Color ................ $36.00
24 x 36 Foam Board ...........................$20.00
Other Services
Fax ............................................... $1.00/COPY
Postage (Fed-Ex, Certified Mail, Etc)...@ cost
Concrete Monuments .......................... $10.00
Rebar .................................................... $2.00
Mileage (T/M Projects Only) .................. $0.59
6
PROJECT: 3RD Street Improvements, Clermont, Florida
CLIENT: Cheryl Parker, Engineer I, City of Clermont
DATE: February 18, 2010
TERMS AND CONDITIONS
I. GENERAL CONDITIONS
A. AGREEMENT:
These terms and conditions are attached to and made part of the proposal for
services (the "Proposal for Services") by which Booth, Ern, Straughan & Hiott, Inc.
("BESH") has agreed to perform certain professional engineering and/or surveying
services for and on behalf of City of Clermont ("Client"). The Proposal for
Services, these terms and conditions, the hourly rate schedule, and the executed
authorization to proceed attached to these terms and conditions shall constitute a
contract (hereinafter referred to as the "Agreement")for the provision of services by
BESH to and on behalf of Client.
B. TERMINATION:
This Agreement may be terminated by either party by furnishing written notice to the
other party at least thirty (30) days prior to the effective date of termination. In the
event that this Agreement is terminated by either party, Client shall pay BESH for
all services performed and expenses incurred through the date of termination.
C. DOCUMENTS:
ENGINEERING DOCUMENTS
All original drawings, computations, details, design calculations, and electronic
media that result from engineering services performed by BESH pursuant to this
Agreement are and at all times shall remain the property of BESH. Upon payment
in full for services completed, Client, at Client's expense, may obtain copies of any
documents or reproducible copies of drawings. In doing so, Client agrees that no
additions, deletions, changes or revisions shall be made to any of said documents
without the express written approval of BESH.
SURVEYING DOCUMENTS
All original drawings, computations, details, design calculations, field notes, and
electronic media that result from surveying services performed by BESH pursuant
to this Agreement are and at all times shall remain the property of BESH. Signed
and sealed surveys may be obtained for a period of time up to ninety (90) days after
issuance of the survey, and certifications may be revised during that same period
of time for a fee of $50.00 for each revision. Upon payment in full for services
completed, and within the same period of ninety (90) days, Client, at Client's
expense, may obtain copies of any documents or reproducible copies of drawings.
In doing so, Client agrees that no additions, deletions, changes or revisions shall be
made to any of said documents without the express written approval of BESH. After
7
PROJECT: 3RD Street Improvements, Clermont, Florida
CLIENT: Cheryl Parker, Engineer I, City of Clermont
DATE: February 18, 2010
ninety (90) days and within one hundred eighty (180) days following issuance of the
survey, BESH will revise certifications and will visually inspect the subject property
for the purpose of reissuing a signed and sealed survey, charging its then-current
hourly rates for performing said services and reissuing the survey.
D. FEE RENEGOTIATION:
The Proposal for Services describes the specific services to be performed and tasks
to be undertaken by BESH for and on behalf of Client, and states the fee (the
contract price) for each service and task. Except as otherwise provided in this
Agreement, the contract prices quoted in the Proposal for Services shall remain in
effect for a period of two (2) years from the date of execution of this Agreement.
After the expiration of two (2) years from the date hereof, the contract prices stated
in the Proposal for Services shall by renegotiated between BESH and Client with
respect to all services and tasks that have not been completed by that date. The
hourly rates set forth in the hourly rate schedule that is part of this Agreement shall
apply to all additional services requested by Client outside the scope of the
services and tasks described in the Proposal for Services. Said hourly rates are
applicable through December 31St of the year in which this Agreement was
executed, and are subject to renegotiation on January 1 of each year thereafter.
E. REGULATORY REQUIREMENTS:
The contract prices and hourly rates set forth in this Agreement have been quoted
based on all federal, state and local regulations in effect as of the date that the
authorization to proceed work is signed by the latter of BESH and Client. If any of
said regulations change during the permitting and design phase of this project,
BESH reserves the right to increase fees for services that may be affected by
regulatory changes upon written notice to the Client.
F. PERMIT ACQUISITION
BESH cannot guarantee the acquisition of any or all of the permits and/or approvals
that shall be required for Client's project. BESH agrees that it shall exercise its best
efforts try to obtain all of the necessary permits and/or approvals. Nevertheless,
Client shall be responsible for payment of all consulting fees due BESH regardless
of agency/governmental actions, including without limitation the failure of one or
more governmental agencies to give the necessary approval for the project.
II. COMPENSATION
A. ADDITIONAL SERVICES:
BESH shall be fully compensated by Client for all additional services performed by
BESH, including, without limitation, the following:
Changes made at Client's request to the scope of services defined in this
Agreement. Client must sign a separate authorization to proceed form (a
8
PROJECT: 3RD Street Improvements, Clermont, Florida
CLIENT: Cheryl Parker, Engineer I, City of Clermont
DATE: February 18, 2010
"Change Order') for each change in scope of services requested by Client
before BESH is obligated to perform the revised scope of services. In the
absence of a Change Order executed by Client, BESH shall proceed
according to the original scope of services as set forth in this Agreement.
Notwithstanding the foregoing, BESH may choose to proceed with aClient-
requested change in scope of services despite the absence of a Change
Order signed by Client. If BESH performs the requested change in scope
of services, BESH shall be entitled to full compensation from Client based
on the prevailing prices or the hourly rates charged by BESH for such
services at the time that BESH performs the changed scope of services for
Client.
2. Revisions made necessary as a result of changes to local, state or federal
governmental requirements after the date of this Agreement.
3. Redesign per Client after preliminary design has been submitted to the
relevant approving agency.
B. OUT-OF-POCKET EXPENSES:
In addition to the fee schedule set forth in the Proposal for Services and the hourly
rates to be charge for all additional services performed by BESH, BESH shall be
reimbursed for all out-of-pocket expenses incurred by BESH, including, without
limitation: blueprints, copies, plots, aerials, express deliveries, specialized postage,
overnight courier services (such as Federal Express and UPS) and travel outside
of the Central Florida area (greater than 25 miles from BESH's office located in
Tavares, Florida). Printing and mileage expenses are set forth on the hourly rate
schedule that is part of this Agreement. All other charges shall be billed to and paid
by Client based on the actual costs incurred by BESH.
C. PAYMENT:
BESH shall submit invoices to Client on asemi-monthly (twice per month) basis.
On each invoice, BESH will bill for its services in accordance with the hourly rate
schedule included as part of this Agreement. The invoice also will identify the task
or the tasks from the Proposal for Services on which BESH performed services
during the billing period. If the Proposal for Services states a lump sum dollar figure
for any particular task, the lump sum amount will represent a "not to exceed" figure
for the task in question, and BESH will continue to bill by the hour for its services
on that task until the "not to exceed" figure has been billed in full. Thereafter,
unless the scope of services to be performed by BESH pursuant to said task has
been changed and the compensation to be paid to BESH has been modified
pursuant to Section II.A. of these Terms and Conditions, BESH will continue to
perform its services under that task without additional charges for its services until
BESH has performed all work required by that task. Client shall notify BESH in
writing within ten (10) days from the date of the invoice if Client has any questions
about the services performed for the charges for those services as reflected on the
invoice. Client waives any and all challenges to the services performed and the
charges for those services not raised within said ten (10) day timeframe. All
PROJECT: 3RD Street Improvements, Clermont, Florida
CLIENT: Cheryl Parker, Engineer I, City of Clermont
DATE: February 18, 2010
invoices shall be due and payable in full within fourteen (14) days from the date of
the invoice. All unpaid balances that remain unpaid after fourteen (14) days from
the date of the invoice shall be subject to interest on the unpaid balance at the rate
of 1.5% per month.
All outstanding invoices shall be paid in full by Client prior to plan submittal
to any permitting agency, preparation of Final Plans for building purposes,
Final Recording of Record Plat, and/or Final Certification of Completion to
state and local agencies. BESH shall have no obligation under this
Agreement to submit or prepare any of the foregoing materials unless and
until Client complies with this requirement. In addition, in the event that any
balance remains unpaid for at least 45 days from the date of the invoice which
included the unpaid balance, BESH shall have the right to terminate any and
all further work on the project until Client has paid said balance in full.
111. MISCELLANEOUS
A. FORCE MAJEURE:
BESH shall not be liable for any delays or failure in performance due to
contingencies beyond BESH's reasonable control including, without limitation, acts
of God, war, fire, explosion, flood, epidemic, severe weather, earthquake, rainstorm,
riots, theft, accidents, strike, work stoppage, acts or regulations of a governmental
entity, shortages of vehicles, fuel, power, labor or material, delays of other
companies or contractors, or any other causes whatsoever whether similar or
dissimilar to those previously enumerated. In the event of delay caused by any of
the foregoing, BESH's time for performance shall be extended for such time as may
be reasonably necessary to enable BESH to perform.
B. LIMITATION OF LIABILITY:
UNDER NO CIRCUMSTANCES SHALL BESH BE LIABLE FOR ANY SPECIAL,
INCIDENTAL, INDIRECT OR CONSEQUENTIAL DAMAGES, INCLUDING
WITHOUT LIMITATION LOST PROFITS, LIQUIDATED DAMAGES, DELAYS,
LOSS OF PRODUCTIVITY, INEFFICIENCY, LOSS OF GOOD WILL, OR ANY
OTHER DAMAGES WHICH ARE SPECIAL, INCIDENTAL, INDIRECT OR
CONSEQUENTIAL. THE LIABILITY OF BESH TO CLIENT, FORANY CAUSE OR
COMBINATION OF CAUSES ARISING OUT OF OR RELATED TO THIS
AGREEMENT, SHALL BE LIMITED TO THE TOTAL AMOUNT OF THE
COMPENSATION PAID BY CLIENT TO BESH PURSUANT TO THIS
AGREEMENT.
C. ENTIRE AGREEMENT:
This Agreement constitutes the entire agreement between BESH and Client and
supercedes any and all prior or contemporaneous understandings, representations
and agreements, oral or written. No amendment, modification or waiver hereof will
10
PROJECT: 3RD Street Improvements, Clermont, Florida
CLIENT: Cheryl Parker, Engineer I, City of Clermont
DATE: February 18, 2010
be binding on BESH unless made in writing and duly executed by an authorized
representative of BESH.
D. WAIVER:
The failure of BESH to enforce any provision of this Agreement or to exercise any
right accruing through the default of the Client hereunder, shall not constitute a
waiver of any other rights of BESH with respect to this Agreement.
E. COSTS AND ATTORNEY'S FEES:
In the event of any litigation to enforce the terms of this Agreement, BESH shall be
entitled to recover court costs and reasonable attorney's fees for all proceedings,
including at the trial court level, on appeal, and in connection with bankruptcy court
proceedings. In the event that BESH retains the services of an attorney to collect
from Client any sums due hereunder, BESH shall be entitled to recover from Client
all fees and costs incurred with said attorney, whether suit is brought or not.
F. GOVERNING LAW; VENUE:
This Agreement shall be governed by and construed under the laws of the State of
Florida. Venue for any proceeding based upon this Agreement shall lie exclusively
in the state court of competent jurisdiction in Lake County, Florida.
G. SEVERABILITY:
If any provision of this Agreement is held invalid or otherwise unenforceable, the
enforceability of the remaining provisions shall not be impaired thereby but rather
this Agreement shall be construed as if not containing the particular invalid or
unenforceable provision or provisions and the rights and obligations of the parties
shall be construed and enforced accordingly.
11
PROJECT: 3RD Street Improvements, Clermont, Florida
CLIENT: Cheryl Parker, Engineer I, City of Clermont
DATE: February 18, 2010
AUTHORIZATION TO PROCEED
PROPOSAL FOR ENGINEERING SERVICES
AS DESCRIBED IN THE ATTACHED PROPOSAL
To acknowledge your agreement with the terms and conditions set forth in this Agreement
(consisting of the Proposal for Services, the Terms and Conditions, the Hourly Rate Schedule and
this Authorization to Proceed), and to provide Booth, Ern, Straughan & Hiott, Inc. (BESH) with
Client's authorization to proceed with the work described in the Agreement, please fill out and sign
the Authorization to Proceed below and return it to our office. We will schedule the work upon
receipt of the executed Authorization to Proceed. The contract prices, hourly rates, and costs for
printing and similar expenses set forth in this Agreement shall be valid for ninety (90) days from
the date of this proposal. If this Agreement is not accepted by Client within said period of ninety
(90) days, BESH reserves the right to modify any and all of the contract prices, hourly rates and
cost figures set forth herein.
Retainer Amount: $ N/A
THIS PROPOSAL/AGREEMENT ACCEPTED THIS a3~DAY OF~2 , 2010.
Booth, Ern, Straughan & Hiott, Inc.
Signature ~ ~~~ ~~~~
By: Duane K. Booth, P.E.
Title: Principal
Client
Signature
By: ;r
Title: m GU Or
H:\amy\WordPerfect-9.0\Proposals\CITY OF CLERMONT\3rd Street Improvements\BESH-Proposal 2-18-2010.wpd
12
Andreyev SAIYFOAD OFFICE
E n g ~ neeri ng, 4055 St. Johns Parkway
sarzrora, Fkufda 32771
~.... Inc 407.330-7763
^ Fax: 407-330-7765
~~ • Groundwater • Environmental • Geotechnical ~ Construction Materials Testing
February 17, 2010
Proposal No: GPGT-10-007
To: Booth, Em, Straughan, and Hiott, Inc.
350 North Sinclair Avenue
Tavares, Florida 32778
Attention: Mr. Duane K. Booth, P.E.
Subject: Proposal, Geotechnical Investigation, Proposed Stormwater Retention
Pond, 3`d Stree# Improvements, Clermont, Lake County, Florida
Dear Mr. Booth:
As requested, Andreyev Engineering, Inc. (AEI) is pleased to submit this proposal to
provide geotechnical engineering services for the above referenced project. This
proposal presents a scope of services, cost estimate and anticipated schedule to carry
out our geotechnical study.
The proposed project will include the construction of a new community building and
associated stormwater retention pond to receive Stormwater runoff from the
development. The proposed retention pond will outfall to Sparkling Water Lake.
The purpose of the geotechnical investigation and evaluation will be to assess the soil
and groundwater conditions and provide recommendations for the stormwater retention
pond.
We propose to conduct fhe following scope of investigation:
Perform two (2) 15-foot deep power auger borings within the proposed
stormwater retention pond area.
Collect one (1) relatively undisturbed tube sample from the proposed borehole
location for laboratory permeability test.
Analyze the field and laboratory data to develop engineering recommendations
for stormwater retention pond design.
The proposed scope of services will be supervised by a geotechnical engineer licensed
in the state of Florida. The results of the exploration will be presented in a geotechnical
report. This report will specifically address the following:
Existing site condition.
Exploration, testing, and sampling methods.
The Villages Ocala Clermont St. Petersburg
352.751-2478 352-401.9522 352-241-D508 727-527-5735
Fax352-751-2&33 Fax 352.401-9523 Fax 352-241.0977 Fax 727-527-8084
Subsurtace soil conditions encountered, soil classification and laboratory
soil test results.
Depth to groundwater at the time of the exploration and estimated
seasonal high groundwa#er table.
Provide recommendations for stormwater retention pond design and
selection of aquifer parameters for retention area recovery analyses.
PR0.3ECT SCHEDULE
Based on our present schedule we an: prepared to mobilize to begin the field operation
on this project within 2-3 days following your authorization to proceed, assuming access
permission is obtained. We anticipate the field portion of the study to be completed in
one {1) day. Engineering analysis, necessary laboratory work and report preparations
showld be completed within approximately 1 week after the completion of the fieldwork.
ESTIMATED COSTS
We estimate that we can perform the scope of services for the cost of $1,070.00. In
computing the above estimates, we have assumed the site is accessible to our truck
mounted dri{ling rig, that we have the right of entry to the site and that we will not
experience delays due to reasons beyond our control. The cost estimate does not
include surveying and we assume that bore hole locations will be staked by your
surveyor. Our cost estimate does not include recovery analyses of the ponds.
CLOSURE
We appreciate the opportunity to be of service to you. Upon acceptance of this proposal,
please sign one copy and return to this office.
Sincerely,
Andreyev Engineering, Inc.
"i~ j~f d
ShawkatAli, Ph. D., P.E.
Senior Project Engineer
1=lorida License No. 52568
Geotechnical Study for Stormwater Retention Area at 3R0 Street, Clermont, Lake
County, Florida
Total Estimated Fee: $'1,474.40
ACCEPTED BY: (Name} (Signature
TITLE
BILLING ADDRESS:
DATE:
PHONE: CELL: FAX:
SCOPE OF SERVICES AND FEE ESTIMATE
GEOTECHNICAL IrXPLORATIONIEVALUATION
3RD STREET IMPROVEMENTS PROJECT, STORMWATER RETENTION POND,
3RD STREET, CLERMONT, LAKE COUNTY, FLORIDA
F1ELD EXPLORATION
A. Mobilization of Men and Equipment
B. Auger Borings at Stormwater Retention Pond Areas
2 borings to 15 ft. = 30 If. @ $9.OOllf.
C. Collection of Tube Sample from Stormwater Retention Pond Area
Subtotal Field Exploration
LABORATORY TESTING
A. Visual Class cation and limited Index Testing of Sail Samples
Lump Sum
B. permeability Testing of Tube Sample
1 test @ $100.OOltest
Subtotal for Laboratory Testing
ENGINEERING AND TECHNICAL SERVICES
A. Principal Engineer
1 hour @ $150.OOfiour
B. Senior Project Engineer
2 hours @ $125.'00/hour
C. Drafting
2 hours @ $55.00/hour
D. Secretarial Services
2 hours @ $45.00/hour
Subtotal for Engineering Services
Total Estimated Cost
NIA
$ 270.00
N1A
$270,00
$100.00
100.00
~zoo:oo
$150.00
$250.00
$110.00
90.00
S6o0.o0
t
---`
~C~~
VIA EMAIL cherylparker _clermontfl.org AND U.S. MAIL
February 18, 2010
Cheryl Parker, Engineer I
City of Clermont
685 W. Montrose Street
Clermont, Florida 34711
RE: PROPOSAL/AGREEMENT FOR 3RD STREET IMPROVEMENTS.
CLERMONT, FLORIDA
Dear Ms. Parker:
Enclosed please find our proposal for civil engineering services necessary to complete the
above-referenced project, as requested.
Booth, Ern, Straughan & Hiott, Inc., is committed to providing a quality service at a
reasonable price. We look forward to serving you this year, and into the future. Should
you have any questions with regards to this matter, please feel free to contact our office.
Sincerely,
BOOTH, ERN, STRAUGHAN & HIOTT, INC.
~k~__ __
Duane K. Booth, P.E.
Principal
duaneboothCa~besandh.com
DKB:am
Enclosure
H:\amy\WordPerfect-9.O1Proposals\CITY OF CLERMONT3rd Street Improvements\BESH Proposal Submittal Letter 2-18-2010.wpd
ENGINEERS • SURVEYORS • LAND PLANNERS
350 North Sinclair Avenue • Tavares, Florida 32778
Phone: 352.343.8481 • Fax:352.343.8495
E-Mail: Info@besandh.com • www.besandh.com
-l