Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2010-12
TO: City of Clermont ATTN: Mr. Wayne t=ROM: Rick A. WORK pROpC}SED: Miscelianeaus revisldriS Historic train depot. Sca that was remaved and re techniques such as the < elevation dif[erences ttta were required tea minima TOTAL COST CALENDER Dr The prompt appravai o purchased if required a if this proposal is not rE seven working days fra rejected and ~e warts Signatures in the space cantract in the amount EK COnstructiOn CQ. phone 4€~7-468-&378 f pRO,lECT: Train Depot Ren~nration pRpppSAL NO: 1 DATE: 2123/201 t1 tnd added scope work duB to unforseen txanditidnS at he ~e O# work was required duB to undisclased termite damage ~taced, unfarseen nan-~mptiant canstructton application Qncrete stabs being pored around woad studs and unforseen could not have been anticipated prior to construction and addi~dnat ramping and railings. sF pROp08ED CHAPtGE (ADD) X29 419.26 YS EXTENSION Ot= TIME rejection of this proposal is requested sa that. materials may be d the change may be incorparated rota the scrape of the wank. urned t{a MARBEK Construction Ca. within (]'} n the date of ' ,the prapasal shad be ~nsidered tart pro per the ntract plans and specificatians. tael indicate you. intent to issue a-~~ange order to ttte ~h ataave. .,~„~ date ~ ~, 3-ZO~~ City a# Clermont MAf2BEK CONSTRUCTION CO. PROPOSED CHANGE SUMMARY '2010 P.C, NUMBER DESCRIPTION: r Un-Disclosed damages per attached breakdown Drywatt, Concrete, M8s and equipment rental s $7,56••9.24 X7,569.24 ~7,a69.24 ~C,~l1tYlVECl7 i ! iwr~ ~ e. ~ ___ MISC as UUttned $3'376'13 ~~.~d ~o.aa $Q.00 gUBTOT L $3,376.13 SALES T ~ 7% $236.33 $3,612.46 $3,f'112.46 LABOR ...._..~...._..~..~__ ._.._ _._-____ ~~ SUPERVISION ! MA TER CARP X4,973.52 CARPENTER $1,©87.56 $2,146.oU LABORER SUBTO _ AL $8,207.08 LABOR LIRDEN (~ 45°~0 3.19 $11,900.27 $11,900.27 ADMINISTRATIVE ESTIMATING $0.00 $2'500.00 GEN COND. AS-GUILTS $2,500.00 $2,500.00 Sl1BTOTAL OVERHEAD ~ PRt TOTAL $25,581.97 $3,837.29 $29,419.26 Remove Drywall far T~rmite Damage Scx~tt Tray Keith pumpster Replace Drywall For smite Damage New Drywat piscount f r original patchin tlamo far Termite Da age Scott "Trey Keith 1=orm and Pour Curb rider Existing Wet! Remove Blast Door Re Frame Re Framing for 7'er7 Keith Scutt lumber Fastness New insc Remove Beams Scott Trey Keith Stab Rer»Ctv~tl Speedy Keith Scott Dirt Removal Rentaf Tray Scott Keith Scutt Keith Keith Scott $ Mrs $ hrs s hrs 1 1s 69 bids 1 1s 8 hrs 8 hrs s hrs 8 hrs 8 hrs 8 hrs 8 hrs Damage, t~rcludtng interior frame walls 16 hrs 16 hrs 1 fs 16 hrs ., 1440 sf CeF/ing 16 hrs 16 hrs 8 hrs Cutting 1 Bobcat 1 is 16 hrs 16 hrs 1 1s 8 hrs 16 hrs 16 hrs 1 is Slab Rap/acemenr 16 hrs Dowsis r tie in 1 is Cut off aw 16 hrs Drill an EPaxy $94.50 $116.00 $27.'19 $217.503 $36.25 $290.00 $245.00 $245.0}03 $45.0}0) $3,1015.(3Q t~65t},t1Q) (56~50).QQ} $14.50 $116.00 $27.19 $217.52 $14.50 5116.00 $14.50 $116.00 $27.19 $217.52 $36.25 $2903.0)0) $14..50 $116.00 $36.25 $580.00 $74.50 $232.00 $575.00 $575.00 X66.00 $1,o4aoO X0.95 $1,368.00 $14.50 $232.00 $27.19 $435.04 $36..25 $290:00 $3,400).00 $3,400.00 $36.25 $580.00 $14.50 $232.00 $418.56 $418.56 $27.19 $2.17.50 $14.50 X232.00 $36.25 $580.00 $245.00 $245.00 $36.25 y;58OAO $75:.00 $75.00 $30:.25 $580.{30 ~=raining and slab Keith Sett Lumber date Compactor credit for origin; concrete ;.abor ,hangs windows 3 window opening Window -e-build bay ~~ 16 hrs $36.25 $5$0.t7t1 16 tars $14.50 $232.aQ 1ls $25.Q4 $25.€l0 1ls $62.47 8,62.47 tnfiFfMat's 3,12 Is ($86.110) {~'! 51.,79) {$~g.03Z ($151.'TO} t~tyor 1 1s 11s $736.16 $736.16 1ls $5Qa.4t1 $5©d.40 Floor Height Chang 25 $36 $29{?.C10 Keith $ hrs g hrs . $36.25 $290.x{? Scott Ithason 16 hrs $20.00 $320..00 1 g'69C3.00 $690..00 Ke`dh 16 hrs $36.25 $14 51} $5$0.00 X232.00 Scott 16 hrs 1 i . $25f3.00 $250.€10 L.urrrbe s Tamara Richardson From: Michael atham [mblatham@gatorsktch.com] Sent: Wednes ay, March 03, 2010 3:01 PM To: Wayne aunders; Darren Gray; Tamara Richardson Cc: Jeff Pow II @ GSA Subject: Marbek hange Order Request #1 for the Train Depot Attachments: image00 .jpg COR #1: I have reviewed the COR have either been completed to date conversion and all the termite dams such as a 5' window you were not c you were charged lower than what ~ questions. Michael Latham, A.I.B.D. Vice President of Operations ~~~~ ~rchtect~, incorporated 723 W. Montrose Street Clermont, Florida 34711 Office: 352-242-0129 x227 Fax: 352-394-4827 Email: mblatham@aatorsktch.o Please visit us at www.GatorSktch.com Information from The message was checked by d the backup. We recommended moving forward processing the request. All items r are logical charges based on the changes due to the slab change, door to window e. Thru our review of the backup we found a number of items that were in your favor, arged foCeldafbrom thefvendorl Please feehfree to contact medwi h any additionalhat as invo T NOD32 Antivirus, version of virus signature database 4913 (20100303) T NOD32 Antivirus. http•//www.eset.com f Cl ermont City o Me To: Wayne Saunde From: Tamara Richar CC: Date: April 1, 2010 Re: Train Depot RE Change Order Marbek Const City Manager ,~ on, PE, City Enginee m Project st #2 Co. During the renovation o the Historic Train Depot, the contractor uncovered termite damage. It became apparent tha the damage was not contained to the visible areas and we had to remove the existing d all, which was not part of the original contract, to repair all of the damage. Furthermore, he source of the termite damage appeared to be from previous non- compliant construction ethods. To prevent future damage, the construction of the slab had to be brought into comp lance. Marbek Construction p esented the City with a proposal to repair the work and bring the construction into compli nce. The proposal is attached. The City's architect, G torSktch, has reviewed the proposal and found the proposal to be reasonable and correct I recommend approval of Change Order No. 2 from Marbek Construction for $29,419.26 to repair termite damage o the Historic Train Depot.