Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2000-52
r;eb 14 00 09:30a Starmer Ranaldi Inc. 407 - 977 -1019 p.2 City of Clermont Main Fire Station sp #98020 SECTION 00525 NOTICE OF AWARD Date 14 February 2000 TO Southlake Constructors, Inc 301 North Tubb Street Oakland, Florida 34760 PROJECT DESCRIPTION Clermont New Main Fire Station The OWNER has considered the BID submitted by you for the above described WORK in Response to its Advertisement for Bids dated November 16, 1999, and Information for Bidders You are hereby notified that your BID has been accepted for items in the amount of $874,319 00 Eight Hundred Seventy Four Thousand. Three Ilundred Nineteen Dollars and no cents This price includes the Base Bid plus Alternates No's. 7 & You are required to execute the AGREEMENT within Ten (10) calendar days from the date of this Notice and furnish the required CONTRACTOR'S PERFORMANCE BOND, PAYMENT BOND, and certificates of insurance within five (5) calendar days from the date of AGREEMENT execution If you fail to execute said Agreement and to furnish said BONDS within the above stated time frames, said OWNER will be entitled to consider all your rights arising out of the OWNER'S acceptance of your BID as abandoned and as a forfeiture of your BID BOND The OWNER will be entitled to such other rights as may be granted by law You are required to return an acknowledged copy of this NOTICE OF AWARD to the OWNER Dated this 14th day of February , 2000 City of CI ont Y T3 �4•��. 0 -aunders, City Manager ACCEPTANCE OF NOTICE Receipt of the above NOTICE OF AWARD is hereby acknowledged NAME OF COMPANY this the 1 T1F day of Rs ,_}9 B NOTICE OF AW ARD 00525 -1 T H E A M E R I C A N I N S T I T U T E O F A R C H I T E C T S AIA Document A101 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a STIPULATED SUM 1987 EDITION THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES, CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION The 1987 Edition of AIA Document A201, General Conditions of the Contract for Construction, is adopted in this document by reference Do not use with other general conditions unless this document is modified This document has been approved and endorsed by The Associated General Contractors of America. AGREEMENT made as of the 3rd day of February in the year of kiMOMAf (A T w o T h o us a n d BETWEEN the Owner: City of Clermont (Name and address) 1 Westgate Plaza Clermont, FL 34711 and the Contractor: Southlake Constructors, Inc. (Name and address) 301 North Tubb Street Oakland, FL 34760 The Project is: New main Fire Station (Name and location) 439 UJ e s t Highway 5 0 Clermont, FL 34711 The Architect Is: Starmer Ranaldi Planning and Architecture, Inc. (Name and address) 890 Northern Way, Suite E -1 Winter Springs, FL 32708 The Owner and Contractor agree as set forth below Copyright 1915, 1918, 1925. 1937, 1951. 1958, 1961. 1963, 1967, 1974, 1977, ©1987 by The American Institute of Archi- tects, 1735 New York Avenue, N W , Washington, D C 20006 Reproduction of the matenal herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will be subject to legal prosecution AIA DOCUMENT A101 • OWNER - CONTRACTOR AGREEMENT • TWELFTH EDITION • AIA' • 01987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENLE, N W , WASHINGTON, D C 20006 A101-1987 1 ARTICLE 1 • THE CONTRACT DOCUMENTS The Contract Documents consist ot this Agreement Conditions of the Contract (General Supplementary and other Conditions), Drawings Specifications addenda issued prior to execution of this Agreement other documents listed in this Agreement and Modifications issued atter execution ot this Agreement, these torm the Contract, and are as tully a part of the Contract as it attached to this Agreement or repeated herein The Contract represents the entire and Integrated agreement between the parties hereto and supersedes prior negotiations representations or agreements, either written or oral -An enumeration ot the Contract Documents other than Modifications appears in Article 9 ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall execute the entire Work described in the Contract Documents, except to the extent specifically Indicated in the Contract Documents to be the responsibility ot others or as tollows (No additional requirements) ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 3.1 The date of commencement is the date from which the Contract Time 01 Paragraph i 2 is measured, and shall he the date of this agreement, as first written abose, unless a different date Is stated below or provision is made for the date to he fixed in a nonce to proceed issued by the Owner 'user: the date u/ crnru rJ rt dt /Jt•n Pont the date o/ t /n. ,4gre(•mem ut if appinahle dads that the date u ill he /1Xe1I rn a nano• n, Jnr I The date of commencement shall be stipulated by the notice to proceed. lnless the date ot commencement is established by a notice to proceed issued by the Owner the Contractor shall north the Owner in writing not less than five days before commencing the Work to permit the timely tiling ot mortgages mechanics hens and other security interests 3.2 The Contractor shall achieve Substantial Completion of the entire Work not later than t/rnerl the calendar date or nurnher of calendar dal • alter the dale uJ commencement -11.1, insert urn requirement. tut cachet substantival ( umrpletion ul Lt, lout puritan• o/ the Work rf not .taled el.en/ of the r ()Intact Doc 9n• Two Hundred and Forty (240) calendar days fro.n commencement. subject to adjustments of this Contract Time as provided in the Contract Documents (Insert prof 's r/ am 'or liquidated damages tc /atom to /adore (u c Mel(' stn Iume The Contractor and the Contractor's Surety, shall be liable for and shall pay the Owner the•sums hereinafter stipulated as liquidated damages for each calander day of delay until the work is substantially complete: Two Hundred and Fifty dollars ($250) per day. AIA DOCUMENT A101 • OWNER - CONTRACTOR AGREEMENT • TWELFTH EDITION • AIA° • ©1914 THE AMERI( AN INSTITI TE OF ARCHITECTS I "Ai NEW YORK AVENUE N W WASHINGTON D ( 201NN. A101.1987 2 ARTICLE 4 CONTRACT SUM 4.1 The Owner shall pay the Contractor in current funds for the Contractor's performance of the Contract the Contract Sum of Eight Hundred Seventy Four Thousand, Three Hundred Dollars c /33Au ttllts9. 0 0 and Nineteen ), subject to addmons and deductions as provided in the Con - ra 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner (State the numbers or other identification of accepted alternates If decisions on other alternates are to be made by tbe Owner subsequent to the execution of this Agreement attach a schedule of sucb other alternates showing the amount for each and tbe date until which that amount is valid ) Base Bid ($855,572.00) Plus Alternate No. 7 ($3,240.00) and Alternate No. 9 ($15,507.00) 4.3 Unit prices, if any, are as follows (Not applicable) AIA DOCUMENT A101 • OWNER - CONTRACTOR AGREEMENT • TWELFTH EDITION • AIA® • ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N W WASHINGTON, D C 20006 A101 -1987 3 • ARTICLE 5 PROGRESS PAYMENTS 5.1 Based upon Apphcauons for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents 5.2 The penod covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows (No additional requirements) 5.3 Provided an Application for Payment is received by the Architect not later than the 1 s t day of a month, the Owner shall make payment to the Contractor not later than the 2 1 S t day of the same month. If an Apphcauon for Payment is received by the Architec4, after the application date fixed above. payment shall be made by the Owner not later than 1 days atter the Architect receives the Apphcation for Payment 5.4 Each Application tor Payment shall be based upon the schedule ot values submitted by the Contractor in accordance with the Contract Documents The schedule ot values shall allocate the entire Contract Sum among the carious portions of the Work and be prepared in such torm and supported bv such data to substantiate ICS accuracy as the Architect may require This schedule unless objected to by the Architect, shall be used as a basis for reviewing the Contractor s Applications for Payment 5.5 Apphcauons for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment 5.6 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows 5.6.1. Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share ot the tonal Contract Sum allocated to that portion of the Work in the schedule of values, less retainage of ten percent ( 10 %) Pending final determination of cost to the Owner of changes in the Work, amounts not in the dispute may be included as provided in Subparagraph 7 3 7 ot the General Conditions even though the Contract Sum has not vet been adjusted bv Change Order, 5.6.2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing), less retainage of t e fl percent ( 1 0 %), 5.6.3 Subtract the aggregate of previous payments made by the Owner, and 5.6.4 Subtract amounts, if any, for which the Architect has withheld or nullified a Ceruficate for Payment as provided in Para- graph 9 5 of the General Condiuons. 5.7 The progress payment amount determined in accordance with Paragraph 5 6 shall be further modified under the following circumstances 5.7.1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to ninety five percent ( 95 %) of the Contract Sum, less such amounts as the Architect shall determine fdr incomplete Work and unsettled claims, and 5.7.2 Add, if final completion of the Work is thereafter matenally delayed through no fault of the Contractor, any additional amounts payable in accordance with Subparagraph 9 10 3 of the General Conditions 5.8 Reducuon or limitation of retainage, if any, shall be as follows (y it is intended, prior to Substantial Completion of tbe entire Work, to reduce or limit the retainage resulting from the percentages inserted in Subpara- graphs 5 6 / and 5 6 2 above, and tbra is not explained elsewhere in tbe Contract Documents, insert here provisions for sucb reduction or !mutation ) (Not applicable) AIA DOCUMENT A101 • OWNER-CONTRACTOR AGREEMENT • TWELFTH EDITION • AIAO • ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N W , WASHINGTON. D C 20006 A101-1987 4 • ARTICLE 6 FINAL PAYMENT Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when (1) the Contract has been fully performed by the Contractor except for the Contractor's responsibility to correct nonconforming Work as provided In Subparagraph 12.2.2 of the General Conditions and to sausfy other requirements, if any, which necessanly survive final payment, and (2) a final Certificate for Payment has been issued by the Architect, such final payment shall be made by the Owner not more than 30 days after the issuance of the Architect's final Certificate for Payment, or as follows (No additional requirements) ARTICLE 7 -- MISCELLANEOUS PROVISIONS 7.1 Where reference is made in this Agreement to a provision of the General Conditions or another Contract Document, the ref- erence reters to that provision as amended or supplemented by other provisions of the Contract Documents 7.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located (Insert rate of interest agreed upon �f any ) No interest shall be paid. (Usury laws and requirements under the Federal Truth in Lending Act, similar state and local consumer credit laws and other regulanons at the Owner s and Contractor s principal places of business the location of the Project and elsewhere may affect the validity of this provision Legal advice sbould be obtained wrtb respect to deletions or modifications and also regarding requirements such as written disclosures or waivers ) 7.3 other provisions (Not applicable) ARTICLE 8 TERMINATION OR SUSPENSION 8.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of the General Conditions 8.2 The Work may be suspended by the Owner as provided in Arucle 14 of the General Conditions AIA DOCUMENT A101 • OWNER- CONTRACTOR AGREEMENT • TWELFTH EDITION • AIA® • ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N W , WASHINGTON D C 20006 A101 -1987 5 � *r ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows 9.1.1 The Agreement is this executed Standard Form of Agreement Between Owner and Contractor, AIA Document A101, 1987 Ediuon 9.1.2 The General Conditions are the General Conditions of the Contract for Construcuon, AIA Document A201, 1987 Edition. 9.1.3 The Supplementary and other Conditions of the Contract are those contacted in the Project Manual dated 12 November 1999 , and are as follows: Document Title Pages 00800 Supplemental Conditions 1 - 15 9.1.4 The Specifications are those contacted in the Project Manual dated as in Subparagraph 9 1 3, and are as follows (Either Itst the Specrfrcatrons here or refer to an exhibit attached to this Agreement ) Section Title Pages The specifications include all sections of Division 1 through Division 16 as listed in the Table of Contents included in the Project Manual and attached herein as Exhibit '8'. AIA DOCUMENT A101 • OWNER- CONTRACTOR AGREEMENT • TWELFTH EDITION • AIA® • ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N W , WASHINGTON, D C 20006 A101 -1987 6 '1 9, 9.1.5 The Drawings are as follows, and are dated 12 November 1 999 unless a different date is shown below (Esther list the Drawings here or refer w an exhibit attached to this Agreement ) Number Title Date The drawings are enumerated and dated on Exhibit 'C', attached herein. 9.1.6 The addenda, if any, are as tollows Number Date Pages No. 1 24 November 1999 1 -3 No. 2 01 December 1999 1 -2 No. 3 02 December 1999 1 -1 No. 4 06 December 1999 1 -1 Portions of addenda relaung to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9 AIA DOCUMENT A101 • OWNER•CONTRACTOR AGREEMENT • TWELFTH EDITION • AIA • @1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N W , WASHINGTON D C ?0006 Al01.1987 7 9.1.7 Other documents if anv, forming part of the Contract Documents are as follows ant here arm adthttonal doctmtama which are intended 10 /orm part n/ the Contract Documents The Genera! Gond:Irons provide tbat hrddsnx requirements sucb ua adrerosement ur umettatiott to but /nstructrons to dodders sample forms and the Contractors hid are not part of rbe Contract Documents unless enumerated nn tbn Agreement Them should he Infect here only rf untended to be part of the Contract Documents I 1. "Schedule 'A' to Agreement Between Owner and Contractor" per Section 00500 of the Project manual, is incorporated in the Contract Documents and attched herein as Exhibit 'A' 2. All sections of Division 0 of the Table of Contents, includ- ed in the Project manual, are incorporated in the Contract Documents and attached herein as Exhibit '8'. This Agreement is entered into as of the day and year first written above and is executed in at least three ongtnal copies of which one is to be delivered to the Contractor, one to the Architect for use in the administration of the Contract and the remainder to the Owner OWNE r CONTRACTOR dre l (Stgnatu ) Ci manager, City of Clermont Vice President, Southlake Constructors, (Pnnted name and tale) (Pruned name and tale) Inc. AIA DOCUMENT A101 • OWNER - CONTRACTOR AGREEMENT • TWELFTH EDITION • AIA" • X1987 THE AMERICAN INSTITLTE OF ARCHITECTS I'35 NEW YORK AVENUE N W WASHINGTON D c '(xxxi A101 -1987 8 ' Exhibit `A' - Standard Form of Agreement between Owner and Contractor City of Clermont Main Fire Station sn #98020 SCHEDULE A TO AGREEMENT BETWEEN OWNER AND CONTRACTOR COMMUNITY BANK OF THE SOUTH INSURANCE REQUIREMENTS 1 01 CONTRACTOR INSURANCE A General 1 Before performing any Work on the Project, the Contractor shall procure and maintain, dunng the life of the Agreement, the insurance coverages listed below The policies of insurance shall be pnmary and written on forms acceptable to the Owner and placed with insurance carriers approved and licensed by the Department of Insurance for the State of Flonda with a minimum AM Best & Company financial rating of no Tess than A:VII. All required evidence of insurance shall be submitted to Owner at the time set forth in the Contract Documents 2 The Contractor shall not commence the work under the Contract nor permit any sub - contractors to commence work on any sub - contract until all the insurance required has been obtained and certificates thereof provided to the Owner. The Contractor may carry at its own expense such additional insurance as he may deem necessary The Contractor shall not be deemed to be relieved of any responsibility by the fact that he cames insurance Should the Contractor at any time, neglect or refuse to provide the insurance required herein, or should such insurance be canceled or should the full annual aggregate amount of any policy not be available to satisfy the requirements of the Contract, the Owner shall have the right, but not the obligation, to procure such insurance for the Contractor and the cost thereof shall be deducted from the monies then due or thereafter to become due to the Contractor or to declare Contractor in default under the Contract. 3 Liability Insurance Requirements - All liability polices required herein shall be written on an occurrence basis. The policies shall name the Owner, Owner's Board, and staff as additional insured as their interest may appear under this Agreement and the insurers shall agree to waive all nghts of subrogation against the Owner, Owner's Board, and staff The Products and Completed Operations portions of the General Liability shall extend for a penod of two years after the Final Acceptance of the Project by the Owner B Other Requirements 1 Each insurance policy required by this Agreement shall a. Be endorsed to state that coverage shall not be suspended, voided or cancelled by either party, or reduced in coverage or in limits except after 30 days pnor written notice by certified mail has been given to the Owner. b. The Contractor shall be solely responsible for payment of all premiums for insurance required under this Agreement and shall be solely responsible for the payment of all deductibles to which such policies are subject. c. The Contractor may lower the limits of insurance required of subcontractors to a level below those stated herein subject to pnor written approval of the Owner Schedule "A" to Agreement Between Owner & Contractor A- 1 s Exhibit `A' — Standard Form of Agreement between Owner and Contractor City of Clermont Main Fire Station sn #98020 C. Certificates of Insurance Certificates of Insurance evidencing coverages and limits of purchased insurance are to be furnished to the Owner for approval prior to the commencement of Work under this Agreement. The Certificates shall be completed and signed by the issuing agent The Certificates shall be in the form as approved by the Insurance Standards Office (ISO) and shall clearly state all the coverage required by this Agreement The Certificates shall contain a statement that the insurer will mail notice to the Owner at least 30 days prior to any material changes in provisions or cancellation of the policy D. Insurance Requirements 1 Workers' Compensation - The Contractor shall carry Workers' Compensation insurance on behalf of all employees who are required to provide a service under this Agreement, as required by Chapter 440, Flonda Statutes and Employers Liability of limits no less than $1,000,000 each accident $1,000,000 disease - policy limit $1,000,000 disease - each employee 2. Commercial General Liability - including but not limited to bodily injury, property damage and personal injury with limits of $1,000,000 per occurrence and $2,000,000 per location aggregate covenng all Work performed under this Agreement The insurance shall include all major divisions of coverage and shall be on a comprehensive general basis including Premises and Operations (including X -C -U), Owners and Contractors Protective, Products and Completed Operations. 3. Automobile Liability - including bodily injury and property damage liability for all vehicles owned, hired, leased and non -owned with limits of not less than $1,000,000 combined single limit covering all Work performed under this Agreement. 4 Umbrella Liability - to include the Employers Liability, general liability and automobile in underlying policy schedule, with limits of not less than $2,000,000. 5. Hazardous Material - if the Work being performed involves hazardous materials, the need to procure appropriate insurance coverage will be addressed in a contract modification However, if hazardous materials are identified while carrying out this Agreement, no further Work is to be performed in the area of the hazardous material until the Owner has been consulted as to the need to procure and maintain such coverage Schedule "A" to Agreement Between Owner & Contractor A- 2 r ` Exhibit `A' — Standard Form of Agreement between Owner and Contractor City of Clermont Main Fire Station sn #98020 6 Property Insurance / Builders Risk A. The Contractor shall purchase and maintain property insurance (Builders Risk) upon the entire Work at the site to the full replacement value thereof. Any deductible maintained on such insurance shall be the responsibility of the Contractor This insurance shall include the interests of the Owner, the Contractor and subcontractors in the work and shall ensure against the perils of fire and extended coverage and shall include "all nsk" insurance for physical loss or damage, including theft, vandalism and malicious mischief Similar coverage will be obtained by the Contractor for portions of the work in transit B If the Owner finds it necessary to occupy or use a portion or portions of the work prior to Substantial Completion thereof, such occupancy or use shall not commence prior to a time mutually agreed to by the Owner and Contractor and to which the insurance company or companies providing the property insurance have consented by endorsement to the policy or policies This insurance shall not be cancelled or lapsed on account of such partial occupancy or use Consent of the contractor and of the insurance company or companies to such occupancy or use shall not be unreasonably withheld END OF SECTION 00500 Schedule "A" to Agreement Between Owner & Contractor A- 3 Exhibit `B' — Standard Form of Agreement between Owner and Contractor City of Clermont Main Fire Station sn- #98020 TABLE OF CONTENTS Section No. Title Pape DIVISION 0 CONTRACTUAL DOCUMENTS 00010 INVITATION TO BID 1 -1 00050 INSTRUCTION TO BIDDERS 1 - 6 00100 SUPLEMENTARY INSTRUCTIONS TO BIDDERS 1 -4 00200 BID PROPOSAL FORM 1 - 3 00300 SUBCONTRACTOR LIST 1 - 2 00325 PUBLIC ENTITY CRIME FORM 1 - 2 00350 TRENCH SAFETY ACT COMPLIENCE STATEMENT 1 - 2 00375 CONTRACTOR'S QUALIFICATION STATEMENT 1 - 7 00400 BID BONDS 1 -1 00410 BID BOND - AIA DOCUMENT A301 1 -1 00500 AGREEMENT 1 - 2 00500 AGREEMENT - AIA DOCUMENT A101 1 - 8 00510 SCHEDULE "A" TO AGREEMENT 1 - 3 00525 NOTICE OF AWARD 1 -1 00550 NOTICE TO PROCEED 1 -1 00600 PERFORMANCE BOND AND LABOR MATERIAL BOND 1 -1 00610 PERFORMANCE BOND FORM - AIA DOCUMENT A312 1 - 6 00700 GENERAL CONDITIONS 1 -1 00710 GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT 1 - 24 00800 SUPPLEMENTARY CONDITIONS 1 - 24 00900 PROJECT FORMS 1 -1 00910 PROJECT FORMS - AIA DOCUMENT G707 1 -13 DIVISION 1 GENERAL REQUIREMENTS 01000 SUMMARY OF WORK 1 - 3 01027 APPLICATION FOR PAYMENT 1 - 4 01030 ALTERNATES 1 - 2 01035 MODIFICATION PROCEDURES 1 - 3 01040 COORDINATION 1 - 4 01050 FIELD ENGINEERING 1 - 3 01200 PROJECT MEETINGS 1 - 4 01300 SUBMITTALS 1 - 7 01500 TEMPORARY FACILITIES AND CONTROLS 1 - 8 01600 MATERIALS AND EQUIPMENT 1 - 5 01631 PRODUCT SUBSTITUTIONS 1 - 3 01700 CONTRACT CLOSEOUT 1 - 5 01740 WARRANTIES AND BONDS 1 - 3 DIVISION 2 SITE WORK 02000 GEOTECHNICAL REPORT Cover &TOC 1 -1 Report 1 - 5 Attachment A 1 -1 Figures 1 - 5 02110 SITE CLEARING 1 - 3 02200 EARTHWORK 1 - 9 02210 EARTHWORK - UNDERGROUND UTILITIES 1 - 4 TABLE OF CONTENTS TOC -1 Exhibit `B' - Standard Form of Agreement between Owner and Contractor City of Clermont Main Fire Station sn- #98020 Section No Title Page 02361 TERMITE CONTROL 1 - 4 02441 IRRIGATION SYSTEM 1 - 3 02460 SODDING 1 - 4 02490 TREES, PLANTS, AND GROUND COVER 1 - 3 02520 PORTLAND CEMENT CONCRETE PAVING 1 - 7 02580 CONCRETE CURBS, WALKS, DRIVEWAYS 1 - 3 02666 POTABLE WATER SYSTEMS 1 - 6 02668 FIRE WATER SYSTEMS 1 - 7 02720 STORM SEWAGE SYSTEMS 1 - 7 02730 SANATARY SEWAGE SYSTEMS 1 - 7 02821 CHAIN LINK FENCES AND GATES 1 -11 DIVISION 3 CONCRETE 03300 CAST -IN -PLACE CONCRETE 1 -15 DIVISION 4 NOT USED 04200 CONCRETE MASONRY ASSEMBLIES 1 -10 04220 BRICK MASONRY ASSEMBLIES 1 -13 DIVISION 5 METALS 05120 STRUCTURAL STEEL 1 - 8 05500 METAL FABRICATIONS 1 - 7 DIVISION 6 WOOD AND PLASTIC 06100 ROUGH CARPENTRY 1 -10 06192 METAL - PLATE - CONNECTED WOOD TRUSSES 1 - 6 06400 PLASTIC LAMINATE WOOD FACED CABINETS 1 - 7 DIVISION 7 THERMAL AND MOISTURE PROTECTION 07160 BITUMINOUS DAMPROOFING 1 - 3 07210 BUILDING INSULATION 1 - 4 07311 ASPHALT SHINGLES 1 - 6 07620 SHEET METAL FLASHING AND TRIM 1 - 6 07841 THROUGH - PENETRATION FIRESTOP SYSTEMS 1 - 5 07920 JOINT SEALANTS 1 -10 DIVISION 8 DOORS AND WINDOWS 08110 STEEL DOORS AND FRAMES 1 - 5 08210 WOOD DOORS 1 - 4 08361 SECTIONAL OVERHEAD DOORS 1 - 7 08520 ALUMINUM WINDOWS 1 - 7 08710 FINISH HARDWARE 1 - 8 08800 GLASS AND GLAZING 1 - 6 TABLE OF CONTENTS TOC -2 , , ? Exhibit `B' — Standard Form of Agreement between Owner and Contractor 1 is City of Clermont Main Fire Station sn- #98020 Section No Title Page DIVISION 9 FINISHES 09220 PORTLAND CEMENT PLASTER 1 - 8 09260 GYPSUM BOARD ASEMBLIES 1 - 9 09310 CERAMIC TILE 1 - 6 09650 RESILIENT TILE FLOORING 1 - 7 09680 CARPET 1 - 5 09900 PAINTING 1 -12 DIVISION 10 SPECIALTIES 10200 LOUVERS AND VENTS 1 - 6 10350 FLAGPOLES 1 - 4 10425 SIGNS 1 - 5 10505 METAL LOCKERS 1 - 6 10520 FIRE - PROTECTION SPECIALTIES 1 - 5 10801 TOILET AND BATH ACCESSORIES 1 - 5 DIVISION 11 SPECIALTIES 11451 RESIDENTIAL APPLIANCES 1 - 4 DIVISION 12 SPECIALTIES 12491 HORIZONTAL LOUVER BLINDS 1 - 4 DIVISION 13 NOT USED DIVISION 14 SPECIALTIES 14240 HYDRAULIC ELEVATORS 1 - 9 DIVISION 15 MECHANICAL 15000 GENRAL PROVISIONS 1 - 5 15060 PIPE AND PIPE FITTINGS 1 - 4 15094 PIPE HANGERS AND SUPPORTS 1 - 3 15100 VALVES 1 - 2 15190 TESTS - PIPING SYSTEMS 1 - 2 15195 SYSTEMS BALANCING 1 - 3 15250 PIPING AND EQUIPMENT INSULATION 1 - 2 15258 DUCT INSULATION 1 - 2 15400 DOMESTIC WATER SUPPLY SYSTEM 1 - 2 15405 SOIL AND WASTE PIPING SYSTEMS 1 - 3 15440 PLUMBING FIXTURES 1 - 3 15830 FANS 1 - 2 15840 DUCTWORK - 1 - 2 15864 FIRE DAMPERS 1 - 2 15870 AIR DISTRIBUTION 1 - 2 TABLE OF CONTENTS TOC-3 Exhibit `B' — Standard Form of Agreement between Owner and Contractor City of Clermont Main Fire Station sn- #98020 Section No Title Page DIVISION 16 ELECTRICAL 16010 BASIC ELECTRICAL REQUIREMENTS 1 -15 16020 TESTS & PERFORMANCE VERIFICATION 1 - 3 16030 ELECTRICAL IDENTIFICATION 1 - 6 16110 RACEWAYS AND CONDUITS 1 - 9 16120 WIRES AND CABLES 1 - 2 16130 OUTLET BOXES 1 - 3 16140 WIRING DEVICES 1 - 6 16450 GROUNDING 1 - 2 16470 PANELBOARDS 1 - 4 16490 AUTOMATIC TRANSFER SWITCH 1 - 4 16500 LIGHTING 1 - 4 16650 ENGINE GENERATORS 1 -13 16720 FIRE ALARM SYSTEM 1 -18 END OF TABLE OF CONTENTS TABLE OF CONTENTS TOC-4 i ` f' ‘ Exhibit `C' — Standard Form of Agreement between Owner and Contractor City of Clermont Main Fire Station sn- #98020 DRAWING NO. DRAWING NAME DRAWING DATE G -1 COVER SHEET, GENERAL INFORMATION 12 OCT 99 CIVIL C - 1 DEMOLITION PLAN 28 OCT 99 C - 2 SITE DEVELOPMENT PLAN 28 OCT 99 C - 3 GRADING AND DRAINAGE PLAN 28 OCT 99 C - 4 SITE UTILITY PLAN 28 OCT 99 C - 5 SITE DETAILS 28 OCT 99 C - 6 SITE DETAILS 28 OCT 99 C - 7 SITE DETAILS 28 OCT 99 LANDSCAPE & IRRIGATION L -1 LANDSCAPE PLAN 25 OCT 99 L - 2 IRRIGATION PLAN 25 OCT 99 ARCHITECTURAL AO 1 ARCHITECTURAL SITE PLAN 12 NOV 99 Al 1 FLOOR PLANS 12 NOV 99 A2 1 EXTERIOR ELEVATIONS 12 NOV 99 A3 1 WALL SECTIONS 12 NOV 99 A3.2 WALL SECTIONS 12 NOV 99 A3 3 WALL SECTIONS 12 NOV 99 A3.4 WALL SECTIONS 12 NOV 99 A3 5 WALL SECTIONS 12 NOV 99 A3 6 WALL SECTIONS /DETAIL 12 NOV 99 A3 7 WALL SECTIONS /DETAIL 12 NOV 99 A4 1 ENLARGED PLANS /INTERIOR ELEVATIONS 12 NOV 99 A4 2 INTERIOR ELEVATIONS 12 NOV 99 A4 3 CASEWORK DETAILS 12 NOV 99 A5.1 REFLECTED CEILING PLANS 12 NOV 99 A6 1 FURNISHINGS PLANS 12 NOV 99 A7 1 FINISH SCHEDULE/DETAILS 12 NOV 99 A7 2 DOOR AND WINDOW SCHEDULES 12 NOV 99 A8 1 HEAD /JAMB /SILL DETAILS 12 NOV 99 A8 2 HEAD /JAMB /SILL DETAILS 12 NOV 99 A8.3 HEAD /JAMB /SILL DETAILS 12 NOV 99 A9 1 CONSTRUCTION DETAILS 12 NOV 99 STRUCTURAL S -1 FLOOR PLANS 12 NOV 99 S - 2 STRUCTURAL NOTES 12 NOV 99 S - 3 FRAMING PLANS 12 NOV 99 DRAWING INDEX TOC -1 i , i Exhibit `C' — Standard Form of Agreement between Owner and Contractor City of Clermont Main Fire Station sn-#98020 DRAWING NO. DRAWING NAME DRAWING DATE S - 4 FRAMING DETAILS 12 NOV 99 S - 5 WALL SECTIONS 12 NOV 99 S - 6 WALL SECTIONS 12 NOV 99 S - 7 WALL SECTIONS 12 NOV 99 MECHANICAL/PLUMBING M - 1 MECHANICAL PLANS 12 NOV 99 P -1 PLUMBING PLANS 12 NOV 99 P - 2 PLUMBING DETAILS 12 NOV 99 P - 3 PLUMBING DIAGRAMS 12 NOV 99 FIRE PROTECTION FP -1 FIRE PROTECTION 12 NOV 99 FP - 2 FIRE PROTECTION 12 NOV 99 ELECTRICAL E -1 FIXTURE SCHEDULE 12 NOV 99 E - 2 ELECTRICAL — SITE PLAN 12 NOV 99 E - 3 LIGHTING PLAN 12 NOV 99 E - 4 POWER PLAN 12 NOV 99 E - 5 LIGHTNING PROTECTION 12 NOV 99 E - 6 SCHEDULES PLAN 12 NOV 99 DRAWING INDEX TOC -2