2011-68 111N TETRA TECH
September 9, 2011
Ms. Tamara Richardson, P.E.
Director of Engineering
City of Clermont
685 W. Montrose Street
Clermont, FL 34711
Re: City of Clermont
Professional Engineering Services Proposed for the
Control System Assessment and WRF Communication Tower Replacement
Tt #: 200 - 08310 -11001
Dear Ms. Richardson:
Thank you for the opportunity to submit our professional services proposal to assess your
current control system and replace the existing WRF Communications Tower.
I. SCOPE OF SERVICES
Task 1.0: Control System Assessment
1.1 TASK OVERVIEW
The purpose of the proposal is that the City of Clermont would like Tetra Tech to assess the
existing control system. The existing control system consists of three (3) major systems that
report to three (3) individual PC Workstations within the Control Room at the Eastside Water
Reclamation Facility (WRF). The three (3) major systems include the WRF Network, the
Water Plant Network (Greater Hills WTP and Sunburst WTP), and the Lift Station Radio
Network.
The three (3) systems are fed from a single free - standing server rack located at the WRF
Control Room. The free - standing server rack is comprised of a redundant rack - mounted
server, a managed 12 -port switch, a Hirschmann Ethernet hub, and media converters.
Water Reclamation Facility Network (WRFN)
The WRFN consists of four (4) Main Control Panels (MCPs):
1. 100 -MCP -1
2. 120 -MCP -1
3. 120 -MCP -2
4. 130 -MCP -1
201 East Pine Street, Suite 1000, Orlando, FL 32801
Tel 407 839 3955 Fax 407 839 3790 wwwtetratech com
J
RECEIVED
TETRA TECH Ms. Tamara Richardson, P.E.
September 9, 2011
Page 2 of 4
These MCPs run on Modicon Quantum PLCs with Operator Interface Panels programmed
with Wonderware. The four (4) MCPs are tied together via a redundant fiber optic loop
which feeds back to the WRF Control Room.
Water Plant Network (WPN)
The WPN consists of the Greater Hills WTP that communicates with the East Tank via fiber
optic; the WRF Control Room communicates with the Sunburst Lane WTP via fiber optic;
and the Sunburst Lane WTP communicates with the East Tank via radio. The radio system is
a 900 MHz system.
Lift Station Radio Network (LSRN)
The LSRN consists of a 900 MHz radio system that communicates between multiple remote
telemetry units (RTUs) to the SCADA Closet at the WRF. The omni antennas are located at
three (3) different locations, the Bloxam Tank, the East Elevated Tank, and the WRF Tower.
These three (3) locations communicate via yagi antennas from the Bloxam Tank to the East
Elevated Tank and from the East Elevated Tank to the WRF Tower. From the East WRF
Tower the information is transmitted to the SCADA Closet via Ethernet.
Each RTU is equipped with an Allen- Bradley Micrologix 1100, entraNET Remote, and a
yagi antenna. The yagi antennas are communicating with one of the omni antennas located at
the Bloxam Tank, the East, Elevated Tank, or the East WRF Tower.
It is our understanding that the City would like Tetra Tech to assess the current control
system and document a plan for future control system upgrades (expansion) including a
concentration on local /wide area network and Human Machine Interface (HMI) software.
We propose to produce an assessment document that includes the following:
• HMI software (path forward assessment)
• Co mmunication local /wide area network recommendations.
• Hardware /software standard recommendations.
1.2 SCOPE OF WORK
A. Design
1. Perform one (1) site visit by our controls system expert and electrical
engineer to discuss topics and tour facilities.
2. Prepare Control System Assessment Document, including the following:
a. Current Wonderware system assessment and recommendation on future
HMI direction.
1. This will include a brief comparison of several other HMI packages
including estimated conversion costs.
ES TETRA TECH Ms. Tamara Richardson, P.E.
September 9, 2011
Page 3 of 4
b. Evaluation of existing local & wide area network with recommendation on
future direction.
1. This will include a brief discussion on ways to successfully
interconnect the Wastewater, Water and lift- station entities.
c. Evaluate and recommend a plan to implement hardware & software
standards for future projects to allow for simplified and homogenous
control system components and operation.
1. This will include basic written guidelines on HMI software, PLC
logic, and PLC hardware standards.
Task 2.0: WRF Communications Tower Replacement
2.1 TASK OVERVIEW
In May of 2010, The Nello Corporation evaluated the existing radio tower at the
WRF. The tower was determined to be overstressed and incapable of being extended.
The assessment included a recommendation to replace the existing 70 ft. tall self -
supporting tower with a new tower that is 90 ft. tall. The new tower will serve as the
communications tower for the existing SCADA system for the WTPs and WRF.
2.2 SCOPE OF WORK
A. Design
1. Provide technical specifications including tower height, transmission
line types, grounding requirements, lightning protection, and electrical.
2. Provide site plan and construction details.
B. Bidding and Construction Assistance
1. Provide interpretation or clarification of the design documents when
requested.
2. Review shop drawings and other required Contractor submittals up to
two (2) times per submittal for general conformance with the Contract
Documents.
II. SCHEDULE
Upon receipt of notice to proceed, we will schedule the site visit. The work will be
completed within 3 weeks of the site visit.
,
Fin; ■
TETRA TECH
Ms. Tamara Richardson, P.E.
September 9, 2011
Page 4 of 4
III. COMPENSATION SUMMARY
The proposed compensation for the Scope of Services, described in Section 1, is summarized
below:
Task 1.0: Control System Assessment $ 10,750.00
Task 2.0: WRF Communications Tower Replacement $ 3,780.00
Total Lump Sum: $ 14,530.00
A Price Proposal is attached to provide more details for each task.
IV. SERVICES NOT INCLUDED
A. Permits — The Contract Documents will require the Contractor to obtain
permits.
B. All geotechnical services, including materials testing and other services
required for construction are not included in the proposal.
C. Structural engineering services of the communications tower.
If you concur with our proposal, please sign in the space provided below and return one
original signed copy of this proposal to indicate your authorization to proceed. The work will
be performed in accordance with our Continuing Services Contract with the City of
Clermont, dated October 13, 2009.
We look forward to working with you on this important project. If you need additional
information, please call•me at 407 - 480 -3942.
Sincerely,
i , -
•uren Springer, `.E.
Project Manager
\\IERORLFS2\Pr \IER \ 08310 \ 200- 08310 11 001\ProjMgmt \Contracts \COs \SCADA \Clermo SCADA Plan and Tower
replacement Proposal Sept 2011 doc
C James Kinzler, City of Clermont
Jon Fox, Tetra Tech
Mick Jones, Tetra Tech
- : - ' . ;:e1Q________
PROPOSAL ACCEPTED BY
TITLE , r1 Qt f pf DATE bl tnVrr ?_S a D(1
I O O O 00 In° 0 0 0 0 0 o 0 0 °
m m = f0 j S N m co c a m o
L!1 t!1 •v i+ o 00 0 0 00 • In Q
' 0 N -I N
.'-I 1..1 a W
.
N
Ca c
C
io = ai u
F N v .... o
N
c 0 = f5
U N pp 'X
0- LL 0
Y _ C w G . .
m -0 0 L w
,Z' 0 ,^
U y ry
0
CC
1-23 g
V1 CC 41
/>�. A '
.if it
11
C
•
0.
N
H 1
ll
4+
0
I—
J C 0 N e. r. 00 p0 m
00 rri r'1 00 ri V1
E ,.. 1 .+ a
E
3
In
d N
f.1 `o w g �f
• .. 1 0 e1
CL 00 ° o
a ' a0 00 00
8 (euaJezleD 0011) (ND
0
N
ai o
U $ N QD N V N 0)
CO
(5 (oeA Mai) Al Jaaul0u3 fl
EC N
L N cc
O 1r 0 0 00 N
xi o S (uolllll " 'i ..
co 3 - ulna 111 Jaau18u3
1.0 o . .m. 00.1 to 00 N to
N N N
G (sauof 1^
.. 'I IA ieau18u3
A ^
V a, to N N N I r. as
rz Q 71 _
a+
CO H .0 I
u)
3 0
O
CO F—
in LL
re to
O c A , ^ C
i W it
O C u fa
� ..1 E ai N a)
a t N E E _
o
O d . ¢ o m , a
/�� 0
W O. aJ O 2 N E a E t a1 C 2 v
• CZ 0 I— 03 ■ U N 7 a•
/L Q 00 0 w 3 o c
G v i i c 0 i 0 0j C
Ii 0 p F� (0 c m o a ix 0 . v
Q . c ° a 3 t m 4c
al
c
0
© V co t o> > 0) 3 to « c U
-0 0 0 N N V1 1 LL N U m t
a 1-
Es.