Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
2011-96 c o n s u l t i n g e n g i n e e r s i n c o r p o r a t e d
P A
Texas October 27, 2010
Mr. Timothy McNicholas
7660 Woodway Dr. Principal
CT Hsu + Associates
820 Inna Avenue
Suite 400 Orlando, FL. 32801
Houston, Texas 77063 Re: Jenkins Auditorium- Revised Additional Services Proposal (Street Lighting)
Clermont, Florida
a (713) 977 - 3430 Dear Tim,
It is with great pleasure that we submit our revised electrical engineering proposal for the
referenced Project. Our understanding of the scope of work and relative fee structure
fax: (713) 977 -3828 follows.
PROJECT DESCRIPTION
office©chpengr.com
The project consists of the addition of street lighting and related power systems for the
following:
1. Lake Avenue. (2 blocks )
2. West Desoto Street (3 blocks)
Florida
3. West Avenue. (2 Blocks)
1051 Winderly PI. 4. Seventh Street. (One Block)
5. Redesign of surface parking located on Lake Avenue. This lighting is presently
Suite 101 designed to be circuited from Jenkins Auditorium. It wi11 be redesigned to be served
from the electrical service serving the street lighting.
6. Miscellaneous power receptacles located in medians and islands.
Maitland, Florida 32751
BASIC SCOPE OF SERVICES
a (407) 660 - 9099 Our basic scope of services includes the following:
Construction Document Phase:
fax: (407) 660 -8702
The Construction Document submission will include the following:
1 Final selections and specifications for all electrical systems included in the scope of
work
Timothy McNicholas
October 27, 2011
Page 2
2. Specifications for all work included in Division 26
3. Permitting services with the City of Clermont.
Construction Administration Phase:
Construction Administration services will consist of the following
1 Job site visits for inspections or site meetings and shall be limited to two (2) which
includes one final punch list.
2. Shop drawing/submittals review is included in our proposal.
3. Incidental engineering support (answering RFI's. answenng questions, and making
clarifications) is included in our proposal.
EXCLUSIONS, QUALIFICATIONS, and KEY ASSUMPTIONS
1. Cost estimating is not included in our proposal.
2. Structural Engineering is excluded from our proposal.
3. Civil Engineering is excluded from our proposal.
4. Should the Project be designed and constructed in multiple phases, our firm will
review the fees for Construction Documents and Construction Administration
services and will adjust those amounts accordingly. This proposal is based on the
engineering and construction being performed under one phase /one Project.
5. Selection of street light fixtures shall be by others.
6. Engineering or redesign for unforeseen job site conditions is excluded.
ADDITIONAL SERVICES
Any major changes after commencement of the Construction Document phase or change in
scope prior to that phase may be considered an additional service CHPA reserves our right
to request additional services based on the extent of those and any other changes. Other
examples of additional services are identified as exclusions or qualifications previously in
this proposal. Compensation for those services shall be hourly or lump sum based on our
standard billing rates
Principal: $225 00 per hour
... ..........................
Project Manager /Department Head. . $185.00 per hour
En .............. . .. . $155.00 per hour
Senior Designer $125.00 per hour
Designer: . $105.00 per hour
Timothy McNicholas
October 27, 2011
Page 3
CADD Technician: . $80.00 per hour
Technical Typist: $60.00 per hour
Clerical. $45 00 per hour
FEE STRUCTURE
The following is our firm's MEP engineering fee structure. It does not include reimburables•
Construction Documents. $8,292 00
Construction Administration
2.764.00
Total Lump Sum Fee: $11,056.00
TERMS OF PAYMENT
All engineering work for Basic Scope of Services and all approved additional services shall
be invoiced.on a monthly basis. Payment shall be net 45 days after receipt of invoice
REIMBURSABLES
Reimbursables will be invoiced at cost (without markup), are not included in our firm's basic
scope of services fee, and shall include the following:
1. Courier and overnight delivery.
2. Pnntmg and plotting for submittals identified herein
3. Overnight lodging and subsistence outside the Greater/Metro Orlando area.
Please review our proposal with all applicable parties. Should you have any questions or
require any additional information please'do not hesitate to contact our office We look
forward to the continuation of otir long term relationship with you and your firm.
Sincerely
41, CT Hsu +Assoc
Michael W. Thompson
Project Manager • thonze•" !
ii'7 /11
Date