2012-48 Capo:ata Office: Ural Offing:
242 North Westounte DAN Altamonte FL
monte r, Pads Corte FL
IF TRAFFIC r Alt mote Springs, FL 32714 Cleaawae; FL Resideipa, FL
®
CONTROL C eanont, FL Youngstown, FL
DEVICES, INC. Pi: (407) 869300 Deland, FL Dann, TX
„ ,,, Fax: ( 407) 662 -01176 dachaarjle, FL Houston, TX
,n...rns lab Worth, FL Salisbury, NC
Webber: www TCD -17SAam Muni, FL Nashville, TN
To: City Of Clermont Contact Preston Davis
Address: 685 W. Montrose St. Phone: (352) 394-4081
Clermont, FL 34711 Fax:
Project Name: 435 -12 SR 50 At Fire Station 1 Repair Mast Arms Bad Number: IFB- 600940- 10 /GMG And 11-0403
Project Location: SR 50 At Rre Station 1, Clermont Bid Date: 5/11/2012
Line # Item # Rem Description Estimated Quantity Unit Unit Price Total Price)
1 0101 1 Mobilization 5% 1.000 EACH $512.25 $512.25
2 Lake MOT 1.000 INT $325.00 $325.00
97 SEM648 -1E Paint mast arm per assembly (double) 2.000 EACH $2,405.00 $4,810.00
141 0690 -10 Remove Signal Head Assn. 12.000 EACH $26.00 $312.00
283 0650 -1- TSA 12" Standard 3S1W Mast Arm Mount 12.000 EAOI $159.00 $1,908.00
331MAMH Install Only
"* *999 -1 Repair Items On FDOT List 1.000 LS $2,890.00 $2,890.00
Total BId Price: $10,757.25
Notes: .1
. This proposal Is a unft price proposal. The total sum is an approximate sum based on the estimated quantities on the attached proposal (which is an
Integral part of this proposal) at the unit prices depicted thereon. The final contract amount of any contract resulting from this proposal shall be
based on the quantities actually installed and field verified by the Owner's architect/engineer at these unit prices. `
. This proposal Is based on Lake Co. Contract Seminole Co. Contract and non -bid items. For ail of the different work we needed to combined
contracts. �, c
• The removal and Installing of the signals is for us to move remove then reinstall the signals and signs at this locations.
Payment Terms:
Payments are to be made to us by the tenth day of the month for all work Installed and matenals placed on the job site during the preceding month,
Tess five (5 %) percent retainage (unless the Prime Contract calls for a different retalnage percentage). Anal Payment, including retainage, will be due
not more than thirty (30) days after oompletron and acceptance of the work. My contract resulting from this proposal shall be on the terms and
conditions mutually acceptable to the Purchaser and Traffic Control Devices, Inc.
ACCEPTED: CONFIRMED:
The above prices, specifications and conditions are satisfactory and Traffic Control Devices, Inc.
are hereby accepted. -)
Buyer: l . i " NAIL 6C-44 0.641.._ •
Signatu -,411-.... � �� � /�� % Authorized S gnature���,
a /A il! .
Date of Acceptance: �(.f,/l e_ 6 9 c / ,. _ ..... - ..04040,.5-
407,-. 5311 ext. 130 d.hutchIns@tcd-usa.com
rage l of l
f,
■