Loading...
2012-81 • 1 . f ! TETRA■ RA TECH October 12, 2012 Ms. Tamara Richardson, P.E. Director of Engineering City of Clermont 685 W. Montrose Street Clermont, Florida 34711 Subject: City of Clermont Professional Services Proposed for the Finished Water Transmission Main Tt#: 200-08310-11001 Dear Ms. Richardson. Tetra Tech is pleased to furnish the revised proposal for professional services related to the addition of finished water transmission mains to the Westside WTP project. As requested the 2,000 LF of finished water main along Highland Avenue has been removed from the scope, reducing the survey and design services. Additional details are included in the detailed scope of services attached. Tetra Tech looks forward to serving the City of Clermont on this project. If you should have any questions,please do not hesitate to contact me at 407-839-3955. Very truly yours, Approved: Tetra Tech City of Clermont Jon D. Fox,P.E. B ' , Vice President Date: November- ..7? 2O1 1- Attachments BAF/sma/ier/08310-1 1001/pros mgmdcorresp/Richardson_FM-R C: Brian Foulkes,P.E.,Tetra Tech Sally Alfieri,Tetra Tech Tetra Tech, Inc. 201 F Pow Sit Eel. Suite 1000 Orlando FL 32801 Tel 407 839 3955 Fax 407 839 3790 www ten atech corn r e ATTACHMENT "A" SCOPE OF SERVICES Westside Water Treatment Plant Finished Water Transmission A. BACKGROUND The City has requested a finished water transmission main be installed parallel to the proposed raw water main to be installed from the Fourth Street Well to the Westside WTP General alignment of the transmission water main is summarized below: Fourth Street(Approx.4,450 LF) • South on East Ave.to Chestnut St. • West on Chestnut St. to 3rd St • South on 3rd St.to Seminole. Services to be completed are further described herein and shall be performed in accordance with the City of Clermont/Tetra Tech,Inc.professional engineering services agreement dated October 13,2009 B. SCOPE OF SERVICES Task 1—Western Service Area Finished Water Modeling Tetra Tech will update the existing hydraulic model provided by AECOM in August 2011 from the 2008 Potable Water Master Plan to evaluate the finished water HGL and finished water pipe sizes at the proposed Westside WTP. The model provided included one peak hour demand (PHD) flow scenario at existing water demands. The following modifications to the model will be made: • Add reservoir to represent the new Westside WTP • Remove existing elevated storage tank on the WTP site from the model. • Revise the Western Service Area PHD set to match the new proposed PHD through a global demand factor change. • Create an Average Day Demand scenario by adjusting the PHD demands through a global demand factor change matching the PHD/ADD peaking factor. • Add the new/future pipelines from the attached Figure provided by the City to the distribution system model. Following modifications to the hydraulic model,Tetra Tech will run two scenarios: • Peak Hour Demand • Average Day Demand Results from the two scenarios will be used to recommend the finished water pipeline size leaving the proposed Westside WTP and the proposed HGL of the Westside WTP. Services will not include calibration of model TETRA TECH BAF/slh/pm/contract/co/Finished Water Transmission Scope 10 01.12 Tt#200-08310-11001 -1- 101212 • Task 2—Final Design The final design will result in preparation of the bidding and contract documents, engineering drawings and technical specifications, which will be submitted to the City for review at 90- and 100-percent completion levels. The new transmission mains will be included in the 90-percent submittal and will generally include: the finished water transmission mains and interconnect drawings in plan and profile views. The 100-percent submittal will generally include• transmission mains and interconnect drawings in plan and profile views and specifications (technical and bidding) incorporating the comments received from the City on the 90-percent submittal and an opinion of project construction cost. Task 3—Construction Administration The additional route added to the project has an effect on the complexity of the construction as well as the time for completion. The original scope reflected a 12 month time for completion and monthly site visits. Due to the additional improvements,the construction period will be increased to 14 months,an additional two (2) site visits are included to account for both the monthly site visits and to address construction issues as required. Also,the additional duration and complexity of the project will necessitate additional coordination,preparation of responses to RFIs from the contractor,and submittal reviews. Assumptions • Proposed finish water main from East Ave to Seminole St. will be installed on the same side of the road as the proposed raw water main No additional survey is proposed for the along this corridor. • Supplemental title work for pnvate properties,if required,will be paid by the City C. COMPENSATION SUMMARY The proposed Lump Sum compensation for the Scope of Services descnbed above is $28,840 as described in Section B. D. SCHEDULE The Work described above will require and additional two months of design services. TETRA TECH BAF/slh/pm/contract/co/Fimshed Water Transmission Scope 10.01 12 Tt#200-08310-11001 -2- 101212