2012-85 SECTION 00843 CHANGE ORDER FORM Project. City of Clermont Disston Avenue Potable Water Supply Well and Eastside WRF Reclaime Water Supply Well CHANGE ORDER NO. 1 DATE OF ISSUANCE: 12-11-12 CONTRACTOR: A.C. Schultes of Florida EFFECTIVE DATE. 12-11-12 ENGINEER: Tetra Tech, Inc. OWNER'S CONTRACT NO.: The following changes are hereby made to the Contract Documents: CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIMES Original Contract Price Original Contract Times Substantial Completion 150 days or July 13,2012 $533,375 00 Ready for final payment 180 days or August 12,2012 days or dates Net changes from previous Change Orders No_to Net change from previous Change Orders No to No _ No. $ NA NA days Contract Price prior to this Change Order Contract Times prior to this Change Order Substantial Completion 150 days or July 13,2012 $533,375.00 Ready for final payment 180 days or August 12,2012 days or dates Net Increase(deer-ease)of this Change Order Net Increase(decrease)of this Change Order $ 111,597 75 268 days days Contract Price with all approved Change Orders Contract Times with all approved Change Orders Substantial Completion 418 days or April 7,2013 $644,972 75 Ready for final payment 448 days or May 7,2013 days or dates MAG/slm/specs/s-1/CO#1_CO#1_00843 Tt#200-08310-10002 00843-1 121012 CHANGES ORDERED: I. GENERAL This change order is necessary to cover changes in the work to be performed under this Contract. The General Conditions, Supplementary Conditions, Specifications and all parts of the Project Manual listed in Article 1, Definitions, of the General Conditions apply to and govern all work under this change order. Change Order No. 1 II. REQUIRED CHANGES: Extend the contract date by 268 days and the line item costs to remobilize the drill ng to the Disston Avenue-potable supply well site,prepare the site to resume pilot hole drilling from 550 feet to 1,650 feet bls(est 1,100 feet). Pilot hole drilling would include collection of lithologic samples and drill stem water quality samples to track water quality with depth into the productive portion of the Lower Floridan aquifer(LFA). Once pilot hole drilling has been completed then conduct geophysical and video logging to determine LFA production zone, and conduct up to two (2) dual element packer tests to isolate the productive portions of the LFA and collect water quality samples to confirm water quality. III. JUSTIFICATION: High TOC water in the Upper.Floridan aquifer has increased the anticipated water treatment requirements and increased the anticipated costs to treat water from the Disston Avenue potable well. Increasing the depth of the pilot hole from 550 feet bls to approximately 1,650 feet bls would allow for collection of water samples from the productive portion of the LFA,to determine if suitable water quality exists at this location in the LFA to modify the Disston Avenue potable supply well and reduce the water treatment costs. IV. PAYMENT: The attached schedule of values is provided as Exhibit A and shows a credit of$67,438.00 from the existing contract after all work was completed. The attached change order estimate is provided as Exhibit B and shows the total estimated costs of$179,035.75 to complete the exploratory testing at the Disston Avenue potable supply well. Thus the net change order requested is $111,597.75. The new proposed total contract value will be$644,972.75. MAG/slm/specs/s-1/CO#1_CO#1_00843 Tt#200-08310-10002 00843-2 121012 V. APPROVAL AND CHANGE AUTHORIZATION: Acknowledgments: The aforementioned change, and work affected thereby, is subject to all provisions of the original contract not specifically changed by this Change Order,and, It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. Change Order Request by:Tetra Tech Inc. Change(s)Ordered by: City of Clermont RECOMMENDED BY: ACCEPTED BY: ]] Y: Tetra Tech A.0� SLVI (k' Or F1On kt, - ngineer) r ontractor) By: 1- 12/11/12 ( orized Signature) (Date) pr 1 on. . Si:' (Dat ) Vice President Y 1 CL er6/WeA4 (Title) (Title) APPROVED BY: City of Clermont,Florida (Owner) B . uthorized Signature) (Date) END OF SECTION • MAG/slm/specs/s-1/CO#1_CO#1_00843 Tt#200-08310-10002 00843-3 121012 I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c o o Ln o o o o m o 0 o 0 0 0 o0 in 00 lD N O O O 0 e-1 0 .-1 0 0 0 O m N N m al 111 0 0 N 01 m lD O Ni Ln et W R .--I N .--I Ln (. N . .4 . I I. LA.) D i/1• i/} i/• /? Ln v). in. .-I in. i/• i/ in. -v). LO 0 J i . Z a CU Q 7 u CO c EE< •-1-I M ^ e�-I • 1 N N Ln N N a-I a-I a-I . �• ! M i....4 4 1 co> Q C LL CI ii - VL cu 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a/ U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 O O O Ln O O 0 0 0 0 Ln 0 0 0 0 To a Ln N CO Ln Ln 0 0 0 u1 0o Ln 0 0 0 0 0 F_- i% iN/1 1/) 4/1 i/1 iNA 11� 100 I.A. i/> iN/1• 0 e.I ,-i 713- o Z 4/1 1/1• N N t 1 G CU D . H CU .0 N 1- In d D u_ u_ U U u. 2 J W 1~i U U 2 J J J a Q Q 3 -o I In a) U a, — W 4- co 4, 03 TO ii) VI O Y C C 0. C .: d C aai a) V) V) > Q U Y Y U U �' Q C Y LD 00 co 4/ Q O 4., LO CD 'C . ag - 13 co V- N CO C a) U Vf 2 0J " U a) C 4J V1 C L C al aco C — 1- C -a LO U Oo c C T u, m U e-I y E C 0J Lo O 3 m on c c° a) — 0. to ; , C • c EC c > _ �, c > 0 -C m z . •1n = L9 i a. 0 , C I N 7 LO E u C "C d fO p W O N a1 Lo V O 3 U ` O m U O l7 O N co v 0J dJ 7 0 0J U a ▪ H m U C p > •11 N C > C in Ol a c v LL C 4' 0 0 _c , ice+ j {� 0 a N tJ w O 7 C 0 E C. d u api C C E 0! 0) 7 0 0 0. v1 L.T. U = O IY U1 Di ii U . 3 5, a u .-i N m u1 VD I. CO 01 O .-1 N m in .--1 .-1 a--1 .--I e-I I-I 2 W 1- i Exhibit B CO• S INFLUENT TO EFFLUENT OVER'9D Y,EARS EST. 1 92 1 City of Clermont - Disston Avenue Potable Supply Well Change Order. 1 TEST WELL CONSTRUCTION/MODIFICATiON COST ESTIMATE Lower Floridan Aquifer Well-One 24/18"Potable Supply Well Estimated Cost Item Quantity Units Unit Cost Estimate I Mobilization 1 LS $15,020 50 $1 5,020 50 2 Indemnification 0 LS $1,000 00 $0 00 3 General Requirements I LS $7,510 25 $7,510 25 4 Site work 1 LS $6,300 00 $6,300 00 Potable Supply Well 5 Surface Casing(32-inches,black steel)Installed 0 in $250 00 $0 00 6 Intermediate Well Casing(24-inches,black steel)Installed ,`0 in $220 00 $0 00 7 Cement Grout,Installed 12 00 cy $180 00 $2,160 00 8 Limestone Gravel,Installed 39 00 cy $155 00 $6,045 00 9 Pilot Hole Drilling(12-inch) 1100 LF $90 00 $99,000 00 10 Open Hole(23-inch)Drilling 50 in $150 00 $7,500 00 11 Geophysical Logging I I $5,000 00 $5,000 00 12 Video Logging 1 1 $1,500 00 $1,500 00 13 Dual Element Packer Testing 2 $12,000 00 $24,000 00 14 Install and Remove Discharge Line 1 $5,000 00 $5,000 00 15 Well Development 0 hr $200 00 $0 00 16 Step Drawdown Testing 0 $200 00 $0 00 17 Geophysical Logging 2 0 $5,000 00 $0 00 18 Video Logging 2 0 $1,500 00 $0 00 19 Specific Capacity Test 0 hr $150 00 $0 00 20 Well Disinfection 0 $1,000 00 $0 00 21 Plumbness and Alignment Test 0 $1,200 00 $0 00 22 Well Flange Cap 0 $1,500 00 $0 00 TOTAL $179,035.75 Assumptions Top of LFA 1150 ft bls LFA Open Hole Interval 500 ft Total Well Depth 1650 ft bls Costs include pilot hole dnllmg,dnll stem water quality testing,geophysical and video logging of pilot borehole,and(2) dual packer tests to confirm WQ to LFA Estimated substantial completion is 90 days Estimated mobilization is the week of 1/7/13 12/11/2012