2013-80 CIVIL ENGINEERING AND SURVEYING SERVICES
PROPOSAL/AGREEMENT
FOR
CITY OF CLERMONT
LIFT STATION NO. E4 REPLACEMENT
ENGINEERS: CLIENT:
Duane K Booth, P E , Principal James Kinzler, Env Services Director
BOOTH, ERN,'STRAUGHAN`& HIOTT, INC CITY OF CLERMONT
350 North Sinclair Avenue 3335 Hancock Road
Tavares, Florida 32778 Clermont, Florida 34711
(352) 343-8481 - Phone (352) 241-0178 - Phone
(352) 343-8495 - Fax lkinzlera,clermontfl org
duaneboothabesandh corn
PROJECT City of Clermont Lift Station No E4 Replacement
CLIENT James Kinzler, Environmental Services Director, City of Clermont
DATE October 30,2013
drawings, one (1) electronic copy in Autocad v 2011, and one (1) electronic
copy in pdf format ,
• One (1) hard copy set of specifications, one (1) electronic Copy in MS Word
format and one (1) electronic copy in pdf format
FEE: $10,900.00
TASK III CONSTRUCTION BID DOCUMENTS
Services to include preparation of construction contract bid documents and
specifications BESH, Inc , shall coordinate with all qualified bidders during bid
processes and prepare final bid evaluations with recommendations to client
If requested, BESH, Inc , shall prepare final contract documents between
Owner and Contractor
FEE: $2,900.00
TASK IV CONSTRUCTION ADMINISTRATION SERVICES
BESH, Inc , will advise and consult with Owner and act as its representative
during construction BESH, Inc , will make regular visits to the site to observe
the progress and quality of the executed site work and to determine in general
if the work is proceeding in accordance with the construction drawings BESH,
Inc , will review and approve shop drawings, results of tests and inspections
and other data that the contractor is required to submit
Based upon the on-site observations and field survey as-builts to be provided
by Contractor, BESH, Inc , shall prepare and submit certifications of
completions to the following State and local agencies as required
1 City of Clermont
2 Florida Department of Environmental Protection
FEE: $3,230.00
TASK V GEOTECHNICAL INVESTIGATION
BESH, Inc , shall coordinate with Andreyev Engineering, Inc , to provide one auger
boring to a depth of 30' at the location of the proposed wet well in order to evaluate
existing soil conditions and estimate seasonal high groundwater table
FEE: $1,430.00
Page -3-
PROJECT City of Clermont Lift Station No E4 Replacement
CLIENT James Kinzler, Environmental Services Director,City of Clermont
DATE October 30,2013
TASK VI ELECTRICAL ENGINEERING DESIGN/CONSTRUCTION ADMINISTRATION
BESH, Inc , shall contract with Bailey Engineering Consultants, Inc , to provide
electrical engineering design and construction administration, including the
following scope
Design
1 Design associated with the proposed triplex lift station It is our
understanding that the design shall be based on the installation of two (2)
120 HP pumps and one (1) 60 HP pump All of the pumps will be VFD driven
with soft start bypass Our design will reuse the existing VFDs A new PCP
will be provided with pump bypass, contactors and PLC This enclosure will
be ventilated but not air conditioned and shall be installed outdoors
2 Design associated with the electrical system including but not limited to the
utility meter, main disconnect, automatic transfer switch, pump station
control panel, VFD enclosures and associated RTU
3 Design associated with the refeeding the existing standby generator The
generator will be tied into the new electrical system, specifically the proposed
ATS The construction will be staged such that,the existing station will
remain in operation dunng the construction and startup of the new triplex
station
4 Our services shall also include the design of the Pump Control Panel
system Our design will be in agreement with the City standards which we
will obtain from your office prior to initiating our final design of the lift station
5 Design associated with demolition of the existing duplex station Existing
electrical equipment will be returned to the owner
6 Coordination with the local power company as required to establish and/or
upgrade the electrical service for the proposed facility
7 Attend up to three (3) meetings as requested to review status and design
requirements
8 Deliverables
a 90% Drawings and Specifications
b 100% Drawings and Specifications and Opinion of Probable Costs
9 BEC shall submit one (1) complete set of 11 x 17 drawings, six (6) complete
set of full size drawings, one (1) electronic copy in Autocad V 2011 and one
(1) electronic copy in pdf format All reproduction shall be completed by
others ,
10 BEC shall submit one (1) complete, hard-copy set of specifications, one (1)
electronic copy in MS Word format and one (1) electronic copy in pdf
format All reproduction shall be completed by others
Construction Administration
Task 1 - Shop Drawing Review
Review and approve (or take other appropriate action in respect of) Shop Drawings
and samples, the results of tests and inspections and other data which each
Contractor is required to submit, but only for conformance with the design concept
Page -4-
PROJECT City of Clermont Lift Station No E4 Replacement
CLIENT James Kinzler, Environmental Services Director, City of Clermont
DATE October 30,2013
of the Project and compliance with the information given in the Contract Documents
(but such review and approval or other action shall not exceed to means, methods,
sequences, techniques or procedures of construction orb safety precautions and
programs incident thereto), and receive and review (for general content as required
by the Specifications) maintenance and operating schedules and instruction,
guarantees, bonds and certificates of inspection which are to be assembled by
Contractor(s) is in accordance with the Contract Documents
Task 2 - Issue Clarifications
Issue all instructions of OWNER to Contractor(s), issue necessary interpretations
and clarifications of the Contract Documents, have authority, as OWNER's
representative to require special inspection or testing of the work, act as initial
interpreter of the requirements of the Contract Documents and judge of the
acceptability of the work thereunder, and make decisions on all claims of OWNER
and Contractor(s) relating to the acceptability of the work or the interpretation of the
requirements of the Contract Documents pertaining to the execution and progress
of the work The ENGINEER shall render all interpretations or decisions in good
faith and in accordance with the requirements of the Contract Documents
Task 3 - Site Visits (3 Maximum)
Make visits to the site at start up and final walk through to observe, as an
experienced and qualified professional, the progress and quality of the executed
work of Contractor(s) and to determine in general if such work is proceeding in
accordance with the Contract Documents Prepare trip reports to document
observations made during these inspections ENGINEER shall not be responsible
for the means, methods, techniques, sequences or procedures of construction
selected by Contractor(s) or the safety precautions and programs incident to the
work of Contractor(s) ENGINEER's efforts will be directed toward providing a
greater degree of confidence for OWNER that the completed work of Contractor(s)
will conform to the Contract Drawings, but ENGINEER shall not be responsible for
the failure of Contractor(s) to perform the work in accordance with the Contract
Drawings During such visits and on the basis of on-site observations, ENGINEER
shall keep OWNER informed of the progress of the work, shall endeavor to guard
OWNER against defects and deficiencies in such work and may disapprove or
reject work failing to conform to the Contract Documents
FEE: $21,150.00
Owner Responsibilities:
The Owner shall provide the following information for use by BESH in preparing the
construction documents and calculations
• As-built information on the existing lift station, pump sizes, and force main
and electrical/controls systems
Page -5-
PROJECT City of Clermont Lift Station No E4 Replacement
CLIENT James Kinzler, Environmental Services Director, City of Clermont
DATE October 30,2013
• Scada information on existing flows and pump run times
• Requirements for scada system
• Providing underground utility location services on the existing site
Does not include:
• Upgrades to downstream force main other than connection within 50 ft of
valve vault
• Permit fees
• Reproduction fees
r
Page -6-
PROJECT City of Clermont Lift Station No E4 Replacement
CLIENT James Kinzler, Environmental Services Director,City of Clermont
DATE October 30,2013
SUMMARY FEE SCHEDULE
TASK I $ 2,800 00
TASK II $ 10,900 00
TASK III $ 2,900 00
TASK IV $ 3,230 00
TASK V $ 1,430 00
TASK VI $ 21,150 00
TOTAL I $ 42,410.00
Page -7-
PROJECT City of Clermont Lift Station No E4 Replacement
CLIENT James Kinzler, Environmental Services Director,City of Clermont
DATE October 30,2013
HOURLY RATE SCHEDULE
(2013)
Professional Services shall be charged at the following rate schedule
ENGINEERING
PROFESSIONAL ENGINEER (PRINCIPAL) $145 00/HOUR
PROFESSIONAL ENGINEER $130 00/HOUR
PROJECT ENGINEER $110 00/HOUR
ENGINEER TECHNICIAN I $95 00/HOUR
ENGINEER TECHNICIAN II $75 00/HOUR
BUILDING INSPECTOR $65 00/HOUR
CONSTRUCTION ENGINEER $85 00/HOUR
FXPFRT TFSTIMONY PROFFSSIONAI FNGINFFR $300.00/HOUR
SURVEYING
PROFESSIONAL SURVEYOR (PRINCIPAL) $145 00/HOUR
PROFESSIONAL SURVEYOR $110 00/HOUR
3 MAN FIELD CREW $145 00/HOUR
2 MAN FIELD CREW $125 00/HOUR
SURVEY TECHNICIAN I $95 00/HOUR
SURVEY TECHNICIAN II $75 00/HOUR
SURVEY TECHNICIAN III $30 00/HOUR
TITLE RESEARCHER $110 00/HOUR
FXPFRT TFSTIMONY PROFESSIONAL SURVFYOR $300.00/HOUR
Page -8-
1
PROJECT City of Clermont Lift Station No E4 Replacement
CLIENT James Kinzler, Environmental Services Director,City of Clermont
DATE October 30,2013
All printing for this project shall be billed out at the following rate schedule, plus sales tax
(Outside Copying Services will be billed at cost)
Engineering Bond Copies
Black&White
11 x 17 $1 25
24 x 36 $2 50
Color Copies
11 x 17 $2 00
24 x 36 $6 00
Black &White Copies
81/2)( 11 $0 10
8 '/2x 14 $0 15
11 x 17 $0 20
Color Copies
81/2)( 11 $1 20
8 '/2 x 14 $1 45
11 x 17 $1 70
Other Printing Services
24 x 36 Vellum $9 00
24 x 36 Mylar $12 00
24 x 36 Photo Paper, Color $36 00
24 x 36 Foam Board $20 00
Other Services
Fax $1 00/Copy
Postage (Fed-Ex, Certified Mail, Etc) @ cost
Concrete Monuments $10 00
Rebar $2 00
Mileage (T/M Projects Only) $0 59
Page -9-
PROJECT City of Clermont Lift Station No E4 Replacement
CLIENT James Kinzler, Environmental Services Director, City of Clermont
DATE October 30,2013
TERMS AND CONDITIONS
I. GENERAL CONDITIONS
A AGREEMENT
These terms and conditions are attached to and made part of the proposal for services (the
"Proposal for Services") by which Booth, Ern, Straughan & Hiatt, Inc ("BESH") has agreed to
perform certain professional engineering and/or surveying services for and on behalf of City of
Clermont ("Client") The Proposal for Services, these terms and conditions, the hourly rate
schedule, and the executed authorization to proceed attached to these terms and conditions
shall constitute a contract (hereinafter referred to as the "Agreement") for the provision of
services by BESH to and on behalf of Client
B TERMINATION
This Agreement may be terminated by either party by furnishing written notice to the other party
at least thirty(30)days prior to the effective date of termination In the event that this Agreement
is terminated by either party, Client shall pay BESH for all services performed and expenses
incurred through the date of termination
C DOCUMENTS
ENGINEERING DOCUMENTS
All original drawings,computations,details,design calculations,and electronic media that result
from engineering services performed by BESH pursuant to this Agreement are and at all times
shall remain the property of BESH Signed and sealed construction plans,pdf files and AutoCad
files will be issued to the Client as needed for permitting, bidding and construction In doing so,
Client agrees that no additions, deletions, changes or revisions shall be made to any of said
documents without the express written approval of BESH If payment for services is not
received in accordance with Section II (C)(Payment)of this Agreement,BESH reserves the right
not to release any documents until payment is made current
SURVEYING DOCUMENTS
All original drawings,computations,details,design calculations,field notes,and electronic media
that result from surveying services performed by BESH pursuant to this Agreement are and at
all times shall remain the property of BESH Signed and sealed surveys may be obtained for a
period of time up to ninety (90) days after issuance of the survey, and certifications may be
revised during that same period of time for a fee of$50 00 for each revision Upon payment in
full for services completed, and within the same period of ninety (90) days, Client, at Client's
expense,may obtain copies of any documents or reproducible copies of drawings In doing so,
Client agrees that no additions, deletions, changes or revisions shall be made to any of said
documents without the express written approval of BESH After ninety(90)days and within one
hundred eighty(180)days following issuance of the survey, BESH'will revise certifications and
will visually inspect the subject property for the purpose of reissuing a signed and sealed survey,
charging its then-current hourly rates for performing said services and reissuing the survey
D FEE RENEGOTIATION
The Proposal for Services describes the specific services to be performed and tasks to be
undertaken by BESH for and on behalf of Client,and states the fee(the contract price)for each
service and task Except as otherwise provided in this Agreement,the contract prices quoted
Page -10- INIT
PROJECT City of Clermont Lift Station No E4 Replacement
CLIENT James Kinzler, Environmental Services Director,City of Clermont
DATE October 30,2013
in the Proposal for Services shall remain in effect for a period of two (2)years from the date of
execution of this Agreement After the expiration of two (2) years from the date hereof, the
contract prices stated in the Proposal for Services shall by renegotiated between BESH and
Client with respect to all services and tasks that have not been completed by that date The
hourly rates set forth in the hourly rate schedule that is part of this Agreement shall apply to all
additional services requested by Client outside the_scope of the services and tasks described
in the Proposal for Services Said hourly rates are applicable through December 31s1 of the year
in which this Agreement was executed, and are subject to renegotiation on January 1 of each
year thereafter
E REGULATORY REQUIREMENTS
The contract prices and hourly rates set forth in this Agreement have been quoted based on all
federal,state and local regulations in effect as of the date that the authorization to proceed work
is signed by the latter of BESH and Client If any of said regulations change during the
permitting and design phase of this project, BESH reserves the right to increase fees for
services that may be affected by regulatory changes upon written notice to the Client
F PERMIT ACQUISITION
BESH cannot guarantee the acquisition of any or all of the permits and/or approvals that shall
be required for Client's project BESH agrees that it shall exercise its best efforts try to obtain
all of the necessary permits and/or approvals Nevertheless, Client shall be responsible for
payment of all consulting fees due BESH regardless of agency/governmental actions, including
without limitation the failure of one or more governmental agencies to give the necessary
approval for the project
II. COMPENSATION
A ADDITIONAL SERVICES
BESH shall be fully compensated by Client for all additional services performed by BESH,
including,without limitation,the following
1 Changes made at Client's request to the scope of services defined in this Agreement
2 Revisions made necessary as a result of changes to local,state or federal governmental
requirements after the date of this Agreement
3 Redesign per Client after preliminary design has been submitted to the relevant
approving agency
Client must sign a separate authorization to proceed form (a"Change Order')for each
change in scope of services requested by Client before BESH is obligated to perform
the revised scope of services
B OUT-OF-POCKET EXPENSES
In addition to the fee schedule set forth in the Proposal for Services and the hourly rates to be
charge for all additional services performed by BESH, BESH shall be reimbursed for all out-of-
pocket expenses incurred by BESH, including, without limitation blueprints, copies, plots,
aerials, express deliveries, specialized postage, overnight courier services (such as Federal
Express and UPS) and travel outside of the Central Florida area (greater than 25 miles from
BESH's office located in Tavares, Florida) Printing and mileage expenses are set forth on the
Page -11- INIT
PROJECT City of Clermont Lift Station No E4 Replacement
CLIENT James Kinzler, Environmental Services Director, City of Clermont
DATE October 30,2013
hourly rate schedule that is part of this Agreement All other charges shall be billed to and paid
by Client based on the actual costs incurred by BESH
C PAYMENT
BESH shall submit invoices to Client on a semi-monthly (twice per month) basis On each
invoice, BESH will bill for its services in accordance with the hourly rate schedule included as
part of this Agreement The invoice also will identify the task or the tasks from the Proposal for
Services on which BESH performed services during the billing period If the Proposal for
Services states a lump sum dollar figure for any particular task, the lump sum amount will
represent a"not to exceed"figure for the task in question, and BESH will continue to bill by the
hour for its services on that task until the "not to exceed" figure has been billed in full
Thereafter, unless the scope of services to be performed by BESH pursuant to said task has
been changed and the compensation to be paid to BESH has been modified pursuant to Section
II A of these Terms and Conditions, BESH will continue to perform its services under that task
without additional charges for its services until BESH has performed all work required by that
task Client shall notify BESH in writing within ten(10)days from the date of the invoice if Client
has any questions about the services performed or the charges for those services as reflected
on the invoice Client waives any and all challenges to the services performed and the charges
for those services not raised within said ten (10)day timeframe All invoices shall be due and
payable in full within fourteen (14)days from the date of the invoice All unpaid balances that
remain unpaid after fourteen (14)days from the date of the invoice shall be subject to interest
on the unpaid balance at the rate of 1 5% per month
All outstanding invoices shall be paid in full by Client prior to plan submittal to any
permitting agency, preparation of Final Plans for building purposes, Final Recording of
- Record Plat,and/or Final Certification of Completion to state and local agencies BESH
shall have no obligation under this Agreement to submit or prepare any of the foregoing
materials unless and until Client complies with this requirement In addition,in the event
that any balance remains unpaid for at least 45 days from the date of the invoice which
included the unpaid balance, BESH shall have the right to terminate any and all further
work on the project until Client has paid said balance in full
III. MISCELLANEOUS
A FORCE MAJEURE
BESH shall not be liable for any delays or failure in performance due to contingencies beyond
BESH's reasonable control including,without limitation,acts of God,war,fire, explosion,flood,
epidemic,severe weather,earthquake, rainstorm, riots,theft,accidents,strike,work stoppage,
acts or regulations of a governmental entity,shortages of vehicles,fuel,power,labor or material,
delays of other companies or contractors, or any other causes whatsoever whether similar or
dissimilar to those previously enumerated In the event of delay caused by any of the foregoing,
BESH's time for performance shall be extended for such time as may be reasonably necessary
to enable BESH to perform
B LIMITATION OF LIABILITY
UNDER NO CIRCUMSTANCES SHALL BESH BE LIABLE FOR ANY SPECIAL, INCIDENTAL,
INDIRECT OR CONSEQUENTIAL DAMAGES, INCLUDING WITHOUT LIMITATION LOST
PROFITS, LIQUIDATED DAMAGES, DELAYS, LOSS OF PRODUCTIVITY, INEFFICIENCY,
LOSS OF GOOD WILL, OR ANY OTHER DAMAGES WHICH ARE SPECIAL, INCIDENTAL,
INDIRECT OR CONSEQUENTIAL THE LIABILITY OF BESH TO CLIENT,FOR ANY CAUSE
OR COMBINATION OF CAUSES ARISING OUT OF OR RELATED TO THIS AGREEMENT,
Page -12- INIT
PROJECT City of Clermont Lift Station No E4 Replacement
CLIENT James Kinzler, Environmental Services Director,City of Clermont
DATE October 30,2013
SHALL BE LIMITED TO THE TOTAL AMOUNT OF THE COMPENSATION PAID BY CLIENT
TO BESH PURSUANT TO THIS AGREEMENT
C ENTIRE AGREEMENT
This Agreement constitutes the entire agreement between BESH and Client and supercedes any
and all prior or contemporaneous understandings, representations and agreements, oral or
written No amendment, modification or waiver hereof will be binding on BESH unless made in
writing and duly executed by an authorized representative of BESH
D WAIVER
The failure of BESH to enforce any provision of this Agreement or to exercise any right accruing
through the default of the Client hereunder, shall not constitute a waiver of any other rights of
BESH with respect to this Agreement
E COSTS AND ATTORNEY'S FEES
In the event of any litigation to enforce the terms of this Agreement, BESH shall be entitled to
recover court costs and reasonable attorney's fees for all proceedings,including at the trial court
level,on appeal,and in connection with bankruptcy court proceedings In the event that BESH
retains the services of an attorney to collect from Client any sums due hereunder, BESH shall
be entitled to recover from Client all fees and costs incurred with said attorney, whether suit is
brought or not
F GOVERNING LAW, VENUE
This Agreement shall be governed by and construed under the laws of the State of Florida
Venue for any proceeding based upon this Agreement shall lie exclusively in the state court of
competent jurisdiction in Lake County, Florida
G SEVERABILITY
If any provision of this Agreement is held invalid or otherwise unenforceable,the enforceability
of the remaining provisions shall not be impaired thereby but rather this Agreement shall be
construed as if not containing the particular invalid or unenforceable provision or provisions and
the rights and obligations of the parties shall be construed and enforced accordingly
H. STATEMENT REGARDING DESIGN PROFESSIONALS
(ABSENCE OF LIABILITY).
THIS AGREEMENT HAS BEEN ENTERED INTO BETWEEN
CLIENT AND BESH CLIENT ACKNOWLEDGES AND
AGREES THAT THE INDIVIDUAL EMPLOYEES AND AGENTS
OF BESH, INCLUDING WITHOUT LIMITATION THE DESIGN
PROFESSIONALS WHO ARE EMPLOYEES OR AGENTS OF
BESH, ARE NOT PARTIES TO THIS AGREEMENT
PURUSANT TO SECTION 558 0035, FLORIDA STATUTES,
THE INDIVIDUAL EMPLOYEES OR AGENTS OF BESH
Page -13- INIT
PROJECT City of Clermont Lift Station No E4 Replacement
CLIENT James Kinzler, Environmental Services Director, City of Clermont
DATE October 30,2013
(INCLUDING WITHOUT LIMITATION ALL ENGINEERS,
SURVEYORS,AND OTHER DESIGN PROFESSIONALS WHO
ARE EMPLOYEES OR AGENTS OF BESH), SHALL NOT BE
HELD INDIVIDUALLY LIABLE FOR NEGLIGENCE ARISING
OUT OF OR RELATED TO ANY WORK PERFORMED BY
SAID EMPLOYEES OR AGENTS PURSUANT TO THIS
AGREEMENT.
Page -14- INIT
PROJECT City of Clermont Lift Station No E4 Replacement
CLIENT James Kinzler, Environmental Services Director,City of Clermont
DATE October 30,2013
AUTHORIZATION TO PROCEED
PROPOSAL FOR CIVIL ENGINEERING AND SURVEYING SERVICES
AS DESCRIBED IN THE ATTACHED PROPOSAL
To acknowledge your agreement with the terms and conditions set forth in this Agreement(consisting
of the Proposal for Services, the Terms and Conditions, the Hourly Rate Schedule and this
Authorization to Proceed), and to provide Booth, Ern, Straughan & Hiott, Inc (BESH) with Client's
authorization to proceed with the work described in the Agreement, please fill out and sign the
Authorization to Proceed below and return it to our office We will schedule the work upon receipt of
the executed Authorization to Proceed The contract prices, hourly rates, and costs for printing and
similar expenses set forth in this Agreement shall be valid for ninety (90) days from the date of this
proposal If this Agreement is not accepted by Client within said period of ninety (90) days, BESH
reserves the right to modify any and all of the contract prices, hourly rates and cost figures set forth
herein
Retainer Amount $ n//A
THIS PROPOSAL/AGREEMENT ACCEPTED THIS ao) DAY OF NOV, , 2013
Booth, Em, Straughan & Hiott, Inc Client
Signature Signature 11
By Duane K Booth, P E By o -ref-) Gra∎
Title Principal Title C-141 me. rij e,r-
Page -15- IN IT