2014-009 Andrei,ev SANFORD OFFICE nrimeenng, Sanford Raids 92777 nc. 4504 For 407.204785 • Gmundwater V Environmental • Geotechnlcal • Construction Materials Testing TO: Booth, Ern, Straughan & Hiott, Inc. January 24, 2014 350 North Sinclair Avenue Tavares, Florida 32778 Attn Mr Chuck Hiott, P E SUBJECT: Proposal to Perform a Phase II ESA, Former City of Clermont Public Works Facility West Lake Minneola Drive, Clermont, Lake County, Florida Dear Mr Hiott. Pursuant to your request,Andreyev Engineering, Inc (AEI)has completed this proposal to conduct a Phase II Environmental Site Assessment(ESA)for the subject property The scope of services for this proposal is designed to determine the presence of petroleum impacted soil in an area of proposed construction approximately 25 feet from an area that has been identified for investigation of petroleum constituents by the Florida Department of Environmental Protection (FDEP) The The following items are provided 1. Underground Storage Tank Information: The subject site is registered with the Florida Department of Environmental Protection (FDEP) as utilizing a 2,000-gallon diesel underground storage tank (UST) and a 2,000-gallon gasoline UST from 1971 to June 1992, when they were removed 2. Tank Closure Assessment Information: The USTs were removed from the subject site in June 1992, and disposed of by BETX Environmental Consultants Lake County personnel were present on-site during the removal of the USTs The tank closure documentation submitted to the Lake County Department of Planning and Services in June 1992 indicates that the two USTs and dispensers were removed As part of tank closure assessment activities, eleven soil borings were installed and soil samples were collected for analysis with an Organic Vapor Analyzer (OVA) The exact depths of the samples collected were not identified,and the OVA results were not provided in the tank closure assessment report for all of the samples The only OVA reading was for a soil sample collected from beneath the gasoline UST at approximately 5 feet, which detected a reading of 750 parts per million (ppm) It was reported that"one perforation approximately 14" diameter was located on the west end of Tank No 1 at the bottom seam area There was also some stained soil that was noticed under the dispenser locations A separate groundwater sample was obtained from the tank pit,and was analyzed for BTEX parameters, and was submitted to Lake County by the City of Clermont in March 1993 No levels of BTEX parameters were detected above 1 microgram per liter(ug/L) 3. Petroleum Discharge: A Discharge of Petroleum Products was reported as having occurred on June 5, 1992, as a result of the soil OVA level of 750 ppm The petroleum discharge on June 5, 1992, was determined by the Florida Department of Environmental Protection (FDEP)to be eligible for the Petroleum Cleanup Participation Program (PCPP)on May 23, 1997 4. Scope of Services:To investigate the proposed area of construction,the soil in the unsaturated zone will be screened for the presence of presence of petroleum constituents by obtaining samples from discrete intervals with from ten hand auger borings and measuring the petroleum vapors with an organic vapor analyzer (OVA) Based on the results of the soil screening activities, one soil sample will be collected for laboratory analysis and analyzed for EPA Method 8260 (VOAs), EPA Method 8270 (PAHs), and Total Petroleum Hydrocarbons (TPH) The Mow Canis CJlwmant S'If.Petersburg 3527514478 2524014622 902441-0609 727.527.6735 Fix 204514533 Fat 352-4014523 Far 3524414577 Fear 7274274084 Following completion of the above work, a Phase II ESA report will be prepared summarizing the results of the investigation ESTIMATED COSTS Field Services 1 Environmental Technician Services 8 hours @ $85 00/hr $680 00 2 OVA meter, 1 day @ $85 00/day $85 00/day Subtotal Field Services $765 00 Laboratory Services 1 1 Soil Samples for EPA Method 8260(VOAs), 8270 and TPH @ $425 00 $425 00 Subtotal Laboratory Services $425 00 Professional Services 1 Senior Geologist 2 hours @ $95 00/hr $190 00 2 Project Manager 4 hours @ $85 00/hr $340 00 3 CADD &Administrative Services 1 hour @ $65 00/hr $65 00 Subtotal Professional Services $595 00 Total Not To Exceed Cost $1,785.00 AEI is prepared to conduct the field activities on Tuesday,January 28,2014 A w Itten report will be provided no later than February 4, 2014 Sincerely, C/ I , ANDREYEV ENGINEERING, INC. ACCEPTED BY. a/ DATE: ^ James J Jarmolowski, P G Principal Hydrogeologist Conditions of Acceptance The above proposal is acceptable This proposal constitutes a binding contract between AEI and the client It is agreed by the client and AEI that there are no additional terms,conditions,or agreements with respect to the project,other than the items referenced in the proposal Payment terms are"net thirty days",and for past due invoices,interest shall be accrued at a rate of 1 5%per month Client also agrees to reimburse AEI for reasonable attorney fees,in the event that payment is not submitted to AEI for services rendered In addition,if payment is not received for the services conducted by AEI,the information contained in the report shall remain the property of AEI until payment is received AEI also reserves the right to request that the client return all report copies,in the event-of non-payment 2