Loading...
2014-059 L\` 1': DUKE SECTION NO.VI TWENTY-SIXTH REVISED SHEET NO.6.280 ENERGY® CANCELS TWENTY-FIFTH REVISED SHEET NO.6.280 Page 1 of 6 RATE SCHEDULE LS-1 LIGHTING SERVICE Availability' Available throughout the entire terntory served by the Company Applicable. To any customer for the sole purpose of lighting roadways or other outdoor land use areas, served from either Company or customer owned fixtures of the type available under this rate schedule Service hereunder is provided for the sole and exclusive benefit of the customer,and nothing herein or in the contract executed hereunder is intended to benefit any third party or to impose any obligation on the Company to any such third party Character of Service' Continuous dusk to dawn automatically controlled lighting service(i e photoelectric cell),alternating current,60 cycle,single phase,at the Company's standard voltage available Limitation of Service: Availability of certain fixture or pole types at a location may be restricted due to accessibility Standby or resale service not permitted hereunder Service under this rate is subject to the Company's currently effective and filed "General Rules and Regulations Governing Electric Service" Rate Per Month. Customer Charge Unmetered $1 19 per line of billing Metered $3 42 per line of billing Energy and Demand Charge' Non-Fuel Energy Charge 2 132¢per kWh Plus the Cost Recovery Factors listed in Rate Schedule BA=1„Billing Adjustments, except the Fuel Cost Recovery Factor See Sheet No 6 105 and 6 106 Per Unit Charges' I. Fixtures LAMP SIZE 2 CHARGES PER UNIT INITIAL BILLING LUMENS, LAMP NON-FUEL TYPE DESCRIPTION .OUTPUT WATTAGE kWh FIXTURE MAINTENANCE ENERGY 3 Incandescent:' 110 Roadway 1,000 105 32 $1 03 $4 07 $0 68 115, Roadway 2,500 205 66 1 61 3 67 1 41 170 Post Top 2,500 205 72 20 39 3 67 154 Mercury Vapor 205 Open Bottom 4,000 100 44 $2 55 $1 80 $0 94 210 Roadway 4,000 100 44 2 95 1 80 0 94 215 Post Top 4,000 100 44 3 47 1 80 0 94 220 Roadway 8,000 175 71 3 34 1 77 1 51 225 Open Bottom 8,000 175 71 2 50 1 77 1 51 235 Roadway 21,000 400 158 4 04 1 81 3 37 240 Roadway 62,000 1,000 386 5 29 1 78 8 23 245 Flood 21,000 400 158 5 29 1 81 3 37 250 Flood 62,000 1,000 386 6 20 1 78 8 23 (Continued on Page No 2) ISSUED BY: Javier J.Portuondo,Director Rates&Regulatory Strategy—FL EFFECTIVE: January 1,2014 etas� DUKE IKE SECTION NO.VI TWENTY-FOURTH REVISED SHEET NO.6.281 ENERGY® CANCELS TWENTY-THIRD REVISED SHEET NO.6.281 Page 2 of 6 RATE SCHEDULE LS-1 LIGHTING SERVICE (Continued from Page No 1) I. Fixtures:(Continued) LAMP SIZE Z CHARGES PER UNIT INITIAL BILLING LUMENS LAMP NON-FUEL TYPE , DESCRIPTION OUTPUT WATTAGE kWh FIXTURE MAINTENANCE ENERGY 3 Sodium Vapor. 300 HPS Deco Rdwy White 50,000 400 168 $14 73 $1 61 $3 58 301 Sandpiper HPS Deco Roadway 27,500 250 104 13 81 1 72 2 22 302 Sandpiper HPS Deco Rdwy Blk 9,500 100 42 14 73 1 58 0 90 305 Open Bottom' 4,000 50 21 254 2 04 0 45 310 ' Roadway' 4,000 50 21 3 12 204 0 45 313 Open Bottom' 6,500 70 29 4 19 2 05 0 62 314 Hometown II 9,500 100 42 4 08 1 72 0 90 315 Post Top-Colonial/Contemp' 4,000 50 21 504 2 04 0 45 316 Colonial Post Top' 4,000 50 34 4 05 2 04 0 72 318 Post Top' 9,500 100 42 2 50 1 72 0 90 320 ,Roadway-Overhead Only 9,500 100 42 3 64 1 72 0 90 321 Deco Post Top-Monticello 9,500 100 49 12 17 1 72 1 04 322 Deco Post Top-Flagler 9,500 100 49 16 48 1 72 1 04 323 Roadway-Turtle OH Only 9,500 100 42 4 32 1 72 0 90 325 Roadway-Overhead Only 16,000 150 65 3 78 1 75 1 39 326 Deco Post Top-Sanibel 9,500 100 49 18 16 1 72 104 330 Roadway-Overhead Only 22,000 200 87 364 1 83 1 85 335 Roadway-Overhead Only 27,500 250 104 4 16 1 72 2 22 336 Roadway-Bridge' 27,500 250 104 6 74 1 72 2 22 337 Roadway-DOT' 27,500 250 104 5 87 1 72 2 22 338 Deco Roadway-Maitland 27,500 250 104 9 62 1 72 2 22 340 Roadway-Overhead Only 50,000 400 169 5 03 1 76 3 60 341 HPS Flood-City of Sebnng only' 16,000 150 65 4 06 1 75 1 39 342 Roadway-Turnpike' 50,000 400 168 8 95 1 76 3 58 343 Roadway-Turnpike' 27,500 250 108 9 12 1 72 2 30 345 Flood-Overhead Only 27,500 250 103 5 21 1 72 2 20 347 Clermont 9,500 100 49 20 65 1 72 104 348 Clermont 27,500 250 104 22 65 1 72 2 22 350 Flood-Overhead Only 50,000 400 170 5 19 1 76 3 62 351 Underground Roadway 9,500 100 42 6 22 1 72 0 90 352 Underground Roadway 16,000 150 65 7 58 1 75 1 39 354 Underground Roadway 27,500 250 108 8 10 1 72 2 30 356 Underground Roadway 50,000 400 168 8 69 1 76 3 58 357 Underground Flood 27,500 250 108 9 36 1 72 2 30 358 Underground Flood 1 50,000 400 168 9 49 1 76 3 58 359 Underground Turtle Roadway 9,500 100 42 6 09 1 72 0 90 360 Deco Roadway Rectangular' 9,500 100 47 12 53 1 72 1 00 365 Deco Roadway Rectangular 27,500 250 108 11 89 1 72 2 30 366 Deco Roadway Rectangular 50,000 400 168 12 00 1 76 3 58 370 Deco Roadway Round 27,500 250 108 15 41 1 72 2 30 375 Deco Roadway Round' 50,000 400 168 15 42 1 76 3 58 380 Deco Post Top-Ocala 9,500 100 49 8 78 1 72 1 04 381 Deco Post Top' 9,500 100 49 4 05 1 72 1 04 383, Deco Post Top-Biscayne 9,500 100 49 14 17 1 72 1 04 385' Deco Post Top-Sebnng 9,500 100 49 6 75 1 72 1 04 393 Deco Post Top' 4,000 50 21 8 72 2 04 0 45 394 Deco Post Top' 9,500 100 49 18 16 1 72 1 04 (Continued on Page No.3) ISSUED BY: Javier J. Portuondo,Director Rates&Regulatory Strategy-FL EFFECTIVE: January 1,2014 d' DUKE SECTION NO.VI THIRD REVISED SHEET NO.6.2811 ENERGY ® CANCELS SECOND REVISED SHEET NO.6.2811 Page 3 of 6 RATE SCHEDULE LS-1 LIGHTING SERVICE (Continued from Page No 2) I. Fixtures:(Continued) LAMP SIZE Z CHARGES PER UNIT INITIAL BILLING LUMENS LAMP NON-FUEL TYPE DESCRIPTION OUTPUT WATTAGE kWh FIXTURE MAINTENANCE ENERGY 3 Metal Halide: - 307 Deco Post Top-MH Sanibel P 11,600 150 65 $16 85 $2 68 $1 39 308 Clermont Tear Drop P 11,600 150 65 19 91 2 68 1 39 309 MH Deco Rectangular P 36,000 320 126 13 07 2 74 2 69 311 MH Deco Cube P 36,000 320 126 15 98 2 74 2 69 312 MH Flood P 36,000 320 126 10 55 2 74 2 69 319 MH Post Top Biscayne,P 11,600 150 65 15 24 2 68 1 39 327 Deco Post Top-MH Sanibel 1 12,000 175 74 18 39 2 72 1 58 349 Clermont Tear Drop 1 12,000 175 74 21 73 2 72 1 58 371 MH Deco Rectangular' 38,000 400 159 14 26 284 3 39 372 MH Deco Circular' 38,000 400 159 16 70 284 3 39 373 MH Deco Rectangular 5 110,000 1,000 378 15 30 2 96 8 06 386 MH Flood 5 110,000 1,000 378 13 17 2 96 8 06 389 MH Flood-Sportslighter 5 110,000 1,000 378 13 01 2 96 8 06 390 MH Deco Cube' 38,000 400 159 17 44 284 3 39 396 Deco PT MH Sanibel Dual 5 24,000 350 148 33 73 5 43 3 16 397 MH Post Top-Biscayne 12,000 175 74 14 98 2 72 1 58 398 MH Deco Cube 5 110,000 1,000 378 20 34 2 96 8 06 399 MH Flood 38,000 400 159 11 51 2 84 3 39 LED: 361 LED Roadway 6,000 95 33 $16 93 $2 43 $0 70 362 LED Roadway 9,600 157 55 20 07 2 43 1 17 363 LED Shoebox Type 3 20,664 309 108 41 08 2 84 2 30 364 LED Shoebox Type 4 14,421 206 72 32 59 2 84 1 54 367 LED Shoebox Type 5 14,421 206 72 31 65 2 84 1 54 (Continued on Page No 4) ISSUED BY: Javier J. Portuondo,Director Rates&Regulatory Strategy—FL EFFECTIVE: January 1,2014 DUKE SECTION NO.VI �' ENERGY, SEVENTEENTH REVISED SHEET NO.6.282 CANCELS SIXTEENTH REVISED SHEET NO.6.282 Page 4 of 6 RATE SCHEDULE LS-1 LIGHTING SERVICE (Continued from Page No 3) II POLES BILLING TYPE DESCRIPTION CHARGE PER UNIT 404 35'Deco Concrete—Mariner $22 35 405 Concrete,30/35' 5 05 406 16'Deco Conc—Single Sanibel 11 70 407 16'Decon Conc—Double Sanibel 12 61 408 26'Aluminum DOT Style Pole 45 92 409 36'Aluminum DOT Style Pole 54 80 410 Concrete,15' 1 2 31 411 16'Octagonal Conc' 2 18 412 32'Octagonal Deco Concrete 16 29 413 25'Tenon Top Concrete 11 84 415 Concrete,Curved' 4 77 420 Wood,30/35' 2 17 425 Wood,14'Laminated' 2 38 428 Deco Fiberglass,35',Bronze,Reinforced' 19 11 429 Deco Fiberglass,41',Bronze,Reinforced' 31 54 430 Fiberglass,14',Black' 2 51 431 Deco Fiberglass,41',Bronze' 17 18 432 Deco Fiberglass,35',Bronze,Anchor Base' 27 49 433 Deco Fiberglass,35',Bronze' 13 60 434 Deco Fiberglass,20',Black,Deco Base' 12 47 435 Aluminum,Type A' 6 59 436 Deco Fiberglass,16',Black,Fluted' 19 50 437 Fiberglass,16',Black,Fluted,Dual Mount' 21 94 438 Deco Fiberglass,20',Black' 5 85 439 Black Fiberglass 16' 19 78 440 Aluminum,Type B' 7 33 445 Aluminum,Type C' 14 33 446 Deco Fiberglass,30',Bronze' 11 57 447 Deco Fiberglass,35',Silver,Anchor Base' 21 40 448 Deco Fiberglass,41',Silver' 18 00 449 Deco Fiberglass,16',Black,Fluted,Anchor Base' 17 35 450 Concrete, 1/2 Special 1 75 455 Steel,Type A' 4 11 460 Steel,Type B' 4 41 465 Steel,Type C' 6 17 466 16'Deco Con Vic II—Dual Mount 18 06 467 16'Deco Conc Washington—Dual 25 87 468 16'Deco Conc Colonial—Dual Mount 13 35 469 35'Tenon Top Quad Flood Mount 13 63 470 45'Tenon Top Quad Flood Mount 18 90 471 22'Deco Concrete 14 99 472 22'Deco Conc Single Sanibel 16 03 473 22'Deco Conc Double Sanibel 17 26 474 22'Deco Conc Double Mount 18 74 476 25'Tenon Top Bronze Concrete 17 54 477 30'Tenon Top Bronze Concrete 18 70 478 35'Tenon Top Bronze Concrete 20 14 479 41'Tenon Top Bronze Concrete 24 33 480 Wood,40/45' 5 25 481 30'Tenon Top Concrete,Single Flood Mount 10 06 482 30'Tenon Top Conc,Double Flood Mount/Includes Bracket 12 29 483 46'Tenon Top Conc,Triple Flood Mount/Includes Bracket 18 80 484 46'Tenon Top Conc,Double Flood Mount/Includes Bracket 18 50 485 Concrete,40/45' 10 19 486 Tenon Style Concrete 46'Single Flood Mount 15 31 487 35'Tenon Top Conc,Triple Flood Mount/Includes Bracket 13 53 488 35'Tenon Top Conc,Double Flood Mount/Includes Bracket 13 23 489 35'Tenon Top Concrete,Single Flood Mount 11 00 490 Special Concrete 13' ' 17 39 491 30'Tenon Top Conc,Triple Flood Mount/Includes Bracket 12 60 492 16'Smooth Decorative Concrete/The Colonial 8 99 493 19'White Aluminum' 25 87 494 46'Tenon Top Concrete/Non-Flood Mount/1-4 Fixtures 16 27 495 Dual Mount 20'Fiberglass' 10 84 496 30'Tenon Top Concrete/Non-Flood Mount/1-4 Fixtures 12 44 497 16'Decorative Concrete w/decorative base/The Washington 21 77 498 35'Tenon Top Concrete/Non-Flood Mount/1-4 Fixtures 13 37 499 16'Decorative Concrete-Vic II 13 07 (Continued on Page No.51 ISSUED BY: Javier J.Portuondo,Director Rates&Regulatory Strategy—FL EFFECTIVE: April 29,2013 I� DUKE SECTION NO.VI NINTH REVISED SHEET NO.6.283 ENERGY® CANCELS EIGHTH REVISED SHEET NO.6.283 Page 5of6 RATE SCHEDULE LS-1 LIGHTING SERVICE (Continued from Page No 4) III. Additional Facilities BILLING TYPE Electrical Pole Receptacle 401 Single $3 00 per unit 402 Double $3 90 per unit Notes to Per Unit Charges (1) Restricted to existing installations (2) Lumens output may vary with lamp configuration and age Wattage ratings do not include ballast losses (3) Shown for information only'Energy charges are billed by applying the foregoing energy and demand charges to the total monthly kWh (4) Electnc use permitted only during the penod of October through January, only on poles designated by the Company Energy charged separately (5) Special applications only Additional Charges: Fuel Cost Recovery Factor See Sheet No 6 105 Gross Receipts Tax Factor See Sheet No 6 106 Right-of-Way Utilization Fee See Sheet No 6 106 Municipal Tax See Sheet No 6 106 Sales Tax See Sheet No 6 106 Minimum Monthly Bill. The minimum monthly bill shall be the sum of the Customer Charge and applicable Fixture,Maintenance and Pole Charges Terms of Payment Bills rendered hereunder are payable within the time limit specified on bill at Company-designated locations Terms of Service: _ Service under this rate schedule shall-be fora minimum initial term of ten (10) years from the commencement of service and shall continue thereafter until terminated by either party by written notice sixty(60)days prior to terminationLUpon early_termination of service', (under this schedule,the customer shall pay an amount equal to the remaining monthly lease amount for_the term of contract,applicable ____Customer_Charges and removal cost of the facilities — Special Provisions 1 The customer shall execute a contract on the Company's standard filed contract form for service under this rate schedule 2 Where the Company provides a fixture or pole type other than those listed above,the monthly charges,as applicable shall be computed as follows I Fixture (a) Fixture Charge 1 59%of the Company's average installed cost (b) Maintenance Charge The Company's estimated cost of maintaining fixture II Pole Pole Charge 1 82%of installed cost 3 The customer shall be responsible for the cost incurred to repair or replace any fixture or pole which has been willfully damaged The Company shall not be required to make such repair or replacement prior to payment by the customer for damage 4 Maintenance Service for customer-owned fixtures at charges stated hereunder shall be restricted to fixtures being maintained as of November 1, 1992 For additional requests of the'Company to perform maintenance of customer-owned fixtures, the Company may consider providing such service and bill the customer in accordance with the Company's policy related to'Work Performed for the Public" (Continued on Page No 6) ISSUED BY: Javier J.Portuondo,Director Rates&Regulatory Strategy—FL EFFECTIVE: April 29,2013 le�� DUKE FOURTOH REVISED SHEET NO.6.284 ENERGY. CANCELS THIRD REVISED SHEET NO.6.284 Page 6 of 6 RATE SCHEDULE LS-1 LIGHTING SERVICE (Continued from Page No 5) Special Provisions (Continued) 5 kWh consumption for Company-owned fixtures shall be estimated in lieu of installing meters kWh estimates will be made using the following formula kWh = Unit Wattage(including ballast losses)x 350 hours per month 1,000 6 kWh consumption for customer-owned fixtures shall be metered Installation of customer-owned lighting facilities shall be provided for by the customer The Company may consider installing customer owned lighting facilities and will bill the customer in accordance with the Company's policy related to"Work Performed for the Public" Any costs incurred by the Company to provide for consolidation of existing lighting facilities for the purpose of metering shall be at the customer's expense 7 No Pole Charge shall be applicable for a fixture installed on a company-owned pole which is utilized for other general electncal distnbution purposes 8 The Company will repair or replace malfunctioning lighting fixtures maintained by the Company in accordance with Section 768 1382, Florida Statutes(2005) 9 For a fixture type restncted to existing installations and requinng major renovation or replacement, the fixture shall be replaced by an available similar non-restricted fixture of the customer's choosing and the customer shall commence being billed at its appropriate rate Where the customer requests the continued use of the same fixture type for appearance reasons,the Company will attempt to provide such fixture and the customer shall commence being billed at a rate determined in accordance with Special Provision No 2 for the cost of the renovated or replaced fixture 10 The customer will be responsible for tnmming trees and other vegetation that obstruct the light output from fixture(s) or maintenance access to the facilities 11 After December 31, 1998,all new leased lighting shall be installed on poles owned by the Company 12 Alterations to leased lighting facilities requested by the customer after date of installation(i e redirect,install shields,etc),will be billed to the customer in accordance with the Company's policy related to'Work Performed for the Public" 13 Service for street or area lighting is normally provided from existing distribution facilities Where suitable distnbution facilities do not exist, it will be the customer's responsibility to pay for necessary additional facilities Refer to Section III, paragraph 3 01 of the Company's General Rules and Regulations Governing Electric Service to determine the Contnbution in Aid of Construction owed by the customer 14 Requests for exchanging facilities, upgrades, relocations, removals etc are subject to Section III, paragraph 3 05, of the Company's General Rules and Regulations Governing Electnc Service ISSUED BY: Javier J.Portuondo,Director Rates&Regulatory Strategy—FL EFFECTIVE: April 29,2013