Loading...
2014-061 Ezi TETRA TECH August 6,2014 Mr.James Kinzler City of Clermont East Side Water Reclamation Facility 3335 Hancock Road Clermont,Florida 34711 Subject: City of Clermont Professional Engineering Services—Additional Services Request Westside Water Main Loop Fiber Optic Conduit Installation Tt#: 200-08310-14006 Dear Mr.Kinzler: Tetra Tech is respectfully requesting an additional lump sum cost of$4,950.00 for fiber optic conduit to be installed in the same trench as the proposed 12-inch water main piping within the Westside Water Main Loop project corridor. Approximately 8,000 linear feet of conduit will be included on the construction plan drawings. This effort also includes coordination with the City's IT department as well as field review/inspections for the conduit installation. Tetra Tech looks forward to continuing to serve the City of Clermont on this important project. If you should have any questions,please do not hesitate to contact me or Ms.Janine Alexander at 407-839-3955. Very truly yours, Approved: Tetra Tech City of Clermont D.Fox,P.E. Authori d Signature Vice President Attachment A—Westside Water Main Loop Fiber Optic: Additional Services Scope C: Bob Reed,City of Clermont Paul Roy,City of Clermont Tetra Tech, Inc. 201 E Pine Street,Suite 1000,Orlando,FL 32801 Tel 407 839 3955 Fax 407 839 3790 www tetratech corn ATTACHMENT A ADDITIONAL SERVICES CITY OF CLERMONT WESTSIDE WATER MAIN LOOP FIBER OPTIC ADDITIONAL SERVICES A. PROJECT DESCRIPTION The City wishes to install fiber optic conduit within the proposed 12-inch water main trench for the Westside Water Main Loop project. It is estimated that approximately 8,000 linear feet of small diameter conduit(2-3 inch in diameter)will be installed within the project corridor,adjacent to the proposed water main piping. Tasks to be completed for this project are further described herein and will be performed in accordance with the City/Tetra Tech Continuing Contract and Agreement for Professional Engineering Services for Public Works Projects dated October 13,2009. B. SCOPE OF SERVICES This additional services request includes design time for the conduit to be shown on fifteen (15) of the construction plan drawing sheets including associated call outs, coordination with the City for review and feedback,and construction management efforts for the installation of the conduit during the construction phase of the project. Upon authorization from the City, Tetra Tech will prepare additional design services related to the fiber optic conduit. C. COMPENSATION SUMMARY The total lump sum compensation for the initial Scope of Services was $226,522 with the additional services associated with this change,we estimate and additional lump sum of$4,950 for an adjusted total of$231,472. Task Name Description Fee Final Design Fiber Optic Additional Services 4,95• D. D.SCHEDULE No additional schedule time is requested. JMA/lsc/snr/BP-Gen/Kinzler_Additional Request FO_8-6-14 0 RA TECH Tt#BP City of Clermont -2- 080614