2010-87 •
MARBEK Consir .,;Ctlnn Co.
614 E Hwy 50 a 324 Phone 407-468-8376 i Fax 352-242-1081 Clermont, Fla 347 1
TO. City otGlermant PROJECT. Fire Station#3
Project
ATM' Mr Darren Gray PROPOSAL NO' 4
FROM, Rick A Mar hand DATE 6/23/2009
WORK PROPOSED:
Tile selection modifications as discussed throughout the course of the coordination meetings.
Priced in accordance with the attached back up from Total Ceramic Tile
Proposal inductee overhead costs for processing without a profit Mark up as MARBEK's
contribution to resolution of this matter
i
i
t T si tOBT OF PROPOSED CHANGE(ADD) $4:108 1
CALENf' R DAYS EXTENSION OF TIME -
The Prompt approval or rejecbon of this proposal is requested so that materials may be
purchased if required and the change may be incorporated into the scope of the worts
if this proposal is not returned to MARBEK Construction Co within(7)
seven=dung curs from the date of is. „-a cc,the pmposal shall be considered
relected artd t ie Wk shaft or, - e-r the tract plans and specific lions,
Signatures in tfte spaces below .icate your I i-.nt to Issue - , tinge order to the•
contract in the artiount shown.r1.. t
Marbek .!,- uclo , •.
4 l / 4 --' date
Rick A.Marc cf a_n \ ,
/.. •%�1�.,�,c► data a 9 ,o 0
Oily of Clermont ,
MARBEK CONSTRUCTION CO.
PROPOSED CHANGE SUMMARY
DATE: 8123/2009 P C.NUMBER 4
DESCRIPTION 'Ceramic Tile Additions&Restocking 1
—
SUBCONTRACTORS -
Total Ceramic Tile $3 776 12
$3,776 12 $3,77612
EQUIPMENT I MATERIALS
$0,00
$0.00
0-00
SUFiTOTAL $0.00
SAL TAX(0)7% -00
$0.00 $0.00
LABOR
SUPERVISION 0 FIRS @$46,00/MR. $0.00
CARPENTER 0_MRS @$18.00 t liR $0.00
LABORER HRS -10.00(HR.
SUBTOTAL $0.00
LABOR BURDEN @ 45% SO DO
$000 $0.00
ADMINISTRATIVE
ESTIMATING $0 00
GEN COND $250 00
ENG ORWGS $0.00
$25-076 $25000
SUBTOTAL I 4,026.12
OVERHEAD&PROFIT $0.00
BOND PREM $80 62
TOTAL
—$4 4:3'-'117r4