2010-88 MARBEK Construction Co. 614 E. Hwy 50 Ste 324 Phone 407-468-8378/Fax 352-242-1081 Clermont, Fla. 34711 TO: City of Clermont PROJECT: Train Depot Renovation ATTN. Mr.Wayne Saunders PROPOSAL NO. 2 FROM: Rick A. Marchand DATE: 5/11/2010 WORK PROPOSED. Framing material and labor to wrap exposed beams and columns not originally indicated on drawings as requested by the owner. TOTAL COST OF PROPOSED CHANGE(ADD) $9,366.00 CALENDER DAYS EXTENSION OF TIME The Prompt approval or rejection of this proposal is requested so that materials may be purchased if required and the change may be incorporated into the scope of the work. If this proposal is not returned to MARBEK Construction Co.within(7) seven working days from the date • ' sua -, the proposal shall be considered rejected and the work shall pr•« ed per the ..•ntract plans and specifications. Signatures in the spaces belo indicate you,intent to issu- - change order to the contract in the amount sho above. Marbek = - 'o3 Co./ date 5/11/2010 Ric' A. Marchand date 7/V072g City of Clermont Framing Column&Beam Wraps Keith 60 hrs $36.25 $2,175.00 Scott 60 hrs $14.50 $870.00 T&G siding 1600 If $1.05 $1,674.40 Plywood 8 shts $44.00 $352.00 Spruce 1 " 10 1440 If $0.95 $1,368.00 1"-x 4"trim 32 If $0.30 $9.60 2"x 4" P.T. 40 If $0.42 $16.80 Chair Rail 48 If $1.35 $64.80 $6,530.60 MARBEK CONSTRUCTION CO. PROPOSED CHANGE SUMMARY DATE: 5/11/2010 P.C. NUMBER 2 DESCRIPTION: Beam and Column Wraps SUBCONTRACTORS $0.00 $0.00 $0.00 EQUIPMENT/MATERIALS MISC as outlined $3,485.60 $0.00 $0.00 $0.00 SUBTOTAL $3,485.60 SALES TAX @ 7% $243.99 $3,729 59 $3,729.59 LABOR SUPERVISION/MASTER CARP $2,175.00 CARPENTER $0.00 LABORER $870.00 SUBTOTAL $3,045.00 LABOR BURDEN @ 45% $1,370.25 $4,415.25 $4,415.25 ADMINISTRATIVE ESTIMATING $0.00 GEN COND. $0.00 AS-BUILTS $0 00• $0.00 SUBTOTAL $8,144.84 OVERHEAD&PROFIT $1,221.73 TOTAL $9,366.57