Loading...
2010-89 MARBEK Construction Co. 614 E. Hwy 50 Ste 324 Phone 407-468-8378/Fax 352-242-1081 Clermont, Fla. 34711 TO: City of Clermont PROJECT: Train Depot Renovation ATTN: Mr. Wayne Saunders PROPOSAL NO: 3 REV FROM: Rick A Marchand DATE: 5/24/2010 WORK PROPOSED: Structural demolition and refabrication of front porch beams in accordacne with sketches provided by Gatorsktch Architects. TOTAL COST OF PROPOSED CHANGE(ADD) $15,607.00 CALENDER DAYS EXTENSION OF TIME The Prompt approval or rejection of this proposal is requested so that materials may be purchased if required and the change may be incorporated into the scope of the work. If this proposal is not returned to MARBEK Construction Co.within(7) seven working days from the date of issuance, the proposal shall be considered rejected and the work shall proceed •,- e co ract plans and specifications. Signatures in the spaces below in.' -te your intent to issue a chap•- order to the contract in the amount shown a••ve. Marbek C. ftru- I'• / �� date 5/24/2010 R_ A. Marchand date VaAelAb City of Clermont MARBEK CONSTRUCTION CO. PROPOSED CHANGE SUMMARY DATE: 5/11/2010 P.C. NUMBER 3 DESCRIPTION. Front Porch Structural Repairs SUBCONTRACTORS $0.00 $0.00 $0.00 EQUIPMENT/MATERIALS CBS Bldrs Mat Quote $4,203.48 Waco Scaffolding $1,040.00 United Rental(Lifts/Core Drill) $400.00 Misc Fastners, grout, epoxy $400.00 SUBTOTAL $6,043.48 SALES TAX @ 7% $423.04 $6,466.52 $6,466.52 LABOR SUPERVISION/MASTER CARP $2,900.00 CARPENTER $2,000.00 LABORER $0.00 SUBTOTAL $4,900.00 LABOR BURDEN @ 45% $2,205.00 $7,105.00 $7,105.00 ADMINISTRATIVE ESTIMATING $0.00 GEN COND. $0.00 AS-BUILTS $0.00 $0.00 SUBTOTAL $13,571.52 OVERHEAD& PROFIT $2,035.73 TOTAL $15,607.25