Loading...
2015-57 AGREEMENT FOR ELECTRIC MOTOR AND PUMP REPAIR SERVICES THIS AGREEMENT, made and entered into this day of % _ _ 2015, A.D., by and between the City of Clermont 685 West Montrose e t, C e • int, Florida (hereinafter referred to as "CITY"), and STEWART'S ELECTRIC MOTOR WORKS, INC., 8951 Trussway Blvd., Orlando, FL 32824 (hereinafter referred to as "CONTRACTOR"). WHEREAS, the City of Orlando through the public procurement process awarded an agreement for electric motor and pump repair, City of Orlando Number IFB15-0030-2; WHEREAS, CITY desires to utilize the above-referenced awarded bid, CONTRACTOR's response thereto and agreement in accordance with CITY's procurement policy; and WHEREAS, CONTRACTOR desires to enter into a contract with CITY based on the terms and conditions of Orlando Contract Number IFB15-0030-2. WITNESSETH: That the parties hereto, for the consideration hereinafter set forth, mutually agree as follows: ARTICLE I - SCOPE OF WORK The CONTRACTOR shall furnish electric motor and pump repair services as described in City of Orlando Contract Number IFB 15-0030-2, which is attached hereto and incorporated herein as Exhibit "A" and shall do everything required by this Agreement and the other Agreement Documents contained in the specifications, which are a part of these Documents. Provided, however, that nothing herein shall require CITY to purchase or acquire any items or services from CONTRACTOR. To the extent of a conflict between this Agreement and Exhibit "A", the terms and conditions of this Agreement shall prevail and govern. In all instances the CITY purchasing policy, resolutions and ordinances shall apply. ARTICLE II - THE CONTRACT SUM CITY shall pay CONTRACTOR, for the faithful performance of the Agreement as set forth in the Agreement documents and the Unit Price Schedule as set forth in Exhibit `B', attached hereto and incorporated herein. ARTICLE III—TERM AND TERMINATION 1. This Agreement is to become effective upon execution by both parties, and shall remain in effect until January 26, 2018, unless terminated or renewed as provided by the City of Orlando. 2. Notwithstanding any other provision of this Agreement, CITY may, upon 1 written notice to CONTRACTOR, terminate this Agreement if: a) without cause and for convenience upon thirty (30) days written notice to CONTRACTOR b) CONTRACTOR is adjudged to be bankrupt; c) CONTRACTOR makes a general assignment for the benefit of its creditors; d) CONTRACTOR fails to comply with any of the conditions of provisions of this Agreement; or e) CONTRACTOR is experiencing a labor dispute, which threatens to have a substantial, adverse impact upon performance of this Agreement, without prejudice to any other right or remedy CITY may have under this Agreement. In the event of such termination, CITY shall be liable only for the payment of all unpaid charges, determined in accordance with the provisions of this Agreement, for work, properly performed and accepted prior to the effective date of termination. ARTICLE IV - COMMENCEMENT AND COMPLETION OF WORK The CONTRACTOR shall provide all items in the timeframe as set forth in the applicable purchase order or notice to proceed. ARTICLE V - PAYMENTS In accordance with the provisions fully set forth in the General Conditions, CONTRACTOR shall submit a payment request by the third (3rd) day of each calendar month for items provided during the preceding calendar month. CITY shall make payment to the CONTRACTOR, within thirty (30) calendar days, on the basis of a duly certified and approved payment invoice by the CITY for services provided and accepted by the CITY. ARTICLE VI—DISPUTE RESOLUTION - MEDIATION 1. Any claim, dispute or other matter in question arising out of or related to this Agreement shall be subject to mediation as a condition precedent to voluntary arbitration or the institution of legal or equitable proceedings by either party. 2. The CITY and CONTRACTOR shall endeavor to resolve claims, disputes and other matters in question between them by mediation. 3. The parties shall share the mediator's fee and any filing fees- equally. The mediation shall be held in Clermont, Lake County, Florida, unless another location is mutually agreed upon. Agreements reached in mediation shall be enforceable as settlement agreements in any court having jurisdiction thereof. ARTICLE VII—INSURANCE AND INDEMNIFICATION RIDER 1. Worker's Compensation Insurance - The CONTRACTOR shall take out and maintain during the life of this Agreement Worker's Compensation Insurance for all his employees connected with the work of this Project and, in case any work is sublet, the 2 CONTRACTOR shall require the subcontractor similarly to provide Worker's Compensation Insurance for all of the latter's employees unless such employees are covered by the protection afforded by the CONTRACTOR. Such insurance shall comply with the Florida Worker's Compensation Law. In case any class of employees engaged in hazardous work under this Agreement at the site of the Project is not protected under the Worker's Compensation statute, the CONTRACTOR shall provide adequate insurance, satisfactory to the CITY, for the protection of employees not otherwise protected. 2. CONTRACTOR's Public Liability and Property Damage Insurance - The Contactor shall take out and maintain during the life of this Agreement Comprehensive General Liability and Comprehensive Automobile Liability Insurance as shall protect it from claims for damage for personal injury, including accidental death, as well as claims for property damages which may arise from operating under this Agreement whether such operations are by itself or by anyone directly or indirectly employed by it, and the amount of such insurance shall be minimum limits as follows: (a) CONTRACTOR's Comprehensive General, $1,000,000 Each ($2,000,000 aggregate) Liability Coverages, Bodily Injury Occurrence, & Property Damage Combined Single Limit (b) Automobile Liability Coverages, $1,000,000 Each Bodily Injury&Property Damage Occurrence, Combined Single Limit (c) Excess Liability, Umbrella Form $2,000,000 Each Occurrence, Combined Single Limit Insurance clause for both BODILY INJURY AND PROPERTY DAMAGE shall be amended to provide coverage on an occurrence basis. 3. SubCONTRACTOR's Public Liability and Property Damage Insurance - The CONTRACTOR,shall require each of his subCONTRACTORs to procure and maintain during the life of this subcontract, insurance of the type specified above or insure the activities of his subCONTRACTORs in his policy, as specified above. 4. Indemnification Rider (a) To cover to the fullest extent permitted by law, the CONTRACTOR shall indemnify and hold harmless the CITY and its agents and employees from and against all claims, damages, losses and expenses, including but not limited to attorney's fees, arising out of or resulting from the performance of the Work, provided that any such claim, damage, loss or expense (1) is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than the Work itself) , and (2) is caused in whole or in part by any negligent act or omission of the CONTRACTOR, any subCONTRACTOR, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless 3 of whether or not it is caused in part by a party indemnified hereunder. Such obligation shall not be construed to negate, abridge, or otherwise reduce any other right to obligation of indemnity which would otherwise exist as to any party or person described in this Article. (b) In any and all claims against the CITY or any of its agents or employees by any employee of the CONTRACTOR, any subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, the indemnification obligations under this Paragraph shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the CONTRACTOR or any subcontractor under workers' or workmen's compensation acts, disability benefit acts or other employee benefit acts. (c) The CONTRACTOR hereby acknowledges receipt of ten dollars and other good and valuable consideration from the CITY for the indemnification provided herein. ARTICLE VIII -NOTICES All notices shall be in writing and sent by United States mail, certified or registered, with return receipt requested and postage prepaid, or by nationally recognized overnight courier service to the address of the party set forth below. Any such notice shall be deemed given when received by the party to whom it is intended. CONTRACTOR: Stewart's Electnc Motor Works, Inc. 8951 Trussway Blvd. Orlando, FL 32824 Contact: Paul Stewart, Vice President CITY: City of Clermont Attn: Darren Gray, City Manager 685 W. Montrose Street Clermont, FL 34711 ARTICLE IX—MISCELLANEOUS 1. Attorneys' Fees. In the event a suit or action is instituted to enforce or interpret any provision of this agreement, the prevailing party shall be entitled to recover such sum as the Court may adjudge reasonable as attorneys' fees at trial or on any appeal, in addition to all other sums provided by law. 2. Waiver. The waiver by city of breach of any provision of this agreement shall not be construed or operate as a waiver of any subsequent breach of such provision or 4 of such provision itself and shall in no way affect the enforcement of any other provisions of this agreement. 3. Severability. If any provision of this agreement or the application thereof to any person or circumstance is to any extent invalid or unenforceable, such provision, or part thereof, shall be deleted or modified in such a manner as to make the agreement valid and enforceable under applicable law, the remainder of this agreement and the application of such a provision to other persons or circumstances shall be unaffected, and this agreement shall be valid and enforceable to the fullest extent permitted by applicable law. 4. Amendment. Except for as otherwise provided herein, this agreement may not be modified or amended except by an agreement in writing signed by both parties. 5. Entire Agreement. This agreement including the documents incorporated by reference contains the entire understanding of the parties hereto and supersedes all prior and contemporaneous agreements between the parties with respect to the performance of services by CONTRACTOR. 6. Assignment. This agreement is personal to the parties hereto and may not be assigned by CONTRACTOR, in whole or in part, without the prior wntten consent of city. 7. Venue. The parties agree that the sole and exclusive venue for any cause of action arising out of this agreement shall be Lake County, Florida. 8. Applicable Law. This agreement and any amendments hereto are executed and delivered in the State of Florida and shall be governed, interpreted, construed and enforced in accordance with the laws of the State of Florida. 9. Public Records. Contractor expressly understands records associated with this project are public records and agrees to comply with Florida's Public Records law, to include, to: (a) Keep and maintain public records that ordinarily and necessarily would be required by the CITY in order to perform the services contemplated herein. (b) Provide the public with access to public records on the same terms and conditions that the CITY would provide the records and at a cost that does not exceed the cost provided in this Florida's Public Records law or as otherwise provided by law. (c) Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law. 5 (d) Meet all requirements for retaining public records and transfer, at no cost, to the CITY all public records in possession of CONSULTANT upon termination of the contract and destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. All records stored electronically must be provided to the CITY in a format that is compatible with the information technology systems of the CITY. ARTICLE X - AGREEMENT DOCUMENTS The Agreement Documents, as listed below are herein made fully a part of this Agreement as if herein repeated. Document Precedence: 1. This Agreement 2. Purchase Order/Notice to Proceed 3. All documents contained in City of Orlando Contract/Bid No. IFB15-0030-2. IN WITNESS WHEREOF, the parties hereto have executed this Agreement on this day of 2015. City of ermont Gail L. Ash, May r " ;‘ , Atte t: AOtt " ' 'Tracy"Ac oyd, City erk 6 Stewart's Electric Motor Works, Inc. By: �auI (. ,S er. ,` re. Wtzeicoll- (Name Printed or Typed) :e 4-- resLibl..-E-±- Title Attest: orporate Secretary Marv. Lei (Name Printed or Typed) 7 EXHIBIT A `FNITj`\nti _ CITY OF O'u Vii'•;-?;., February 5,2015 Paul Stewart, Vice President Stewart's Electric Motor Works, Inc. 8951 Trussway Blvd. Orlando, FL 32824 Subject: Contract No. IFB15-0030-2,Electric Motor and Pump Repair The attached contract is the City of Orlando's acceptance of your offer in response to IFB 15- 0030, Electric Motor and Pump Repair, and is subject to all terms and conditions therein, as well as any addenda to subject solicitation. This contract is a thirty-six (36) month contract, effective January 27, 2015, and will remain in effect through January 26,2018. The estimated annual amount of this Contract is $209,630.00. This contract may be renewed upon mutual agreement as provided in the solicitation. Any amendments to this contract must be in writing and signed by both parties to be valid, binding, and enforceable. All invoices must reference the subject Contract Number. Invoices must be,submitted to the address below: Accounts Payable City of Orlando 4`I' Floor,City Hall PO Box 4990 Orlando, FL 32802-4990 Please remember that only those goods/services specifically listed in this contract can be invoiced. The description and unit prices on each invoice must match the description and unit pricing in the subject contract. Invoices not meeting these requirements are considered Improper Invoices and will be returned. Sincerely, 106,-7-1-4,e) Lee Donate Purchasing Agent II cc: Accounts Payable File PROCUREMENT AND CONTRACTS DIVISION CITY HALL•400 SOUTH ORANGE AVENUE•P.O.Box 4990•ORLANDO,FLORIDA 32802-4990 Mayor Chief Procurement Officer Buddy Dyer "`� "' David Billingsley,CPSM,C P.M CITY OF ORLANDO INVITATION FOR BID(IFB) DATE OF ISSUE: December 19,2014 ORIGINAL IFB DUE DATE: January 8,2015 -- IFB DUE TIME: 2:00 p.m.,Local Time,City of Orlando,FL BID DELIVERY LOCATION: City of Orlando Procurement and Contracts Division 400 South Orange Avenue,Fourth Floor Orlando,Florida 32801 Bid opening held at same location. IFB TITLE: ELECTRIC MOTOR AND PUMP REPAIR IFB NO: IFB15-0030 (IFB NUMBER MUST BE PLACED ON FRONT OF ENVELOPE) THIS IS NOT AN ORDER DIRECT ALL INQUIRIES TO: Lee Donate Purchasing Agent II Phone: (407)246-2329 Email: Lee.Donate@cityoforlando.net BUSINESS NAME&ADDRESS Stewart's Electric Motor Works Business Name 8951 Trussway Blvd Address Orlando,FL,32824 City, State,Zip Paul Stewart (407)859-1837 Contact Person/Telephone Number It is the intent and purpose of the City of Orlando that this Invitation for Bid promotes competitive bidding. It shall be the bidder's responsibility to advise the City's Procurement and Contracts Division at the address noted herein, if any language, requirements, etc. or any combination thereof, inadvertently restricts or limits the requirements stated in this Invitation for Bid to a single source. Such notification must be submitted in writing and must be received by the Procurement and Contracts Division not later than ten (10)days prior to the bid closing date. Rev:Services-07/29/14 Electric Motor and Pump Repair 1FB15-0030 SPECIFICATION FOR ELECTRIC MOTOR AND PUMP REPAIR GENERAL A. SCOPE OF WORK The Contractor shall provide to the City,when requested, electric motor and pump repair in a reliable and timely manner as specified herein. The City reserves the right to have any electric motors and pumps hereinafter referred to as "equipment" repaired elsewhere. This action will not waive or void any of the terms and conditions contained in the Contract. B. ESTIMATES 1. The Contractor shall inspect and evaluate each piece of equipment as required (to include disassembly), to determine if the unit can be economically repaired. The Contractor shall provide a verbal repair estimate to the City, with a written estimate to follow as confirmation, within ten (10) hours from: 1) pickup by the Contractor, 2) delivery to the Contractor's facility by the City or 3)review at the City's facility by the Contractor. The City shall notify the Contractor whether or not to proceed with repairs, before the Contractor proceeds with any repairs. The City shall not make payment for any unauthorized repairs. 2. In the event of costs in excess of the original estimate, the Contractor shall provide a verbal revised repair estimate to the City,with a written revised repair estimate to follow as confirmation,within one(1)business day from the time the excess cost is determined by the Contractor. The City shall notify the Contractor whether or not to proceed with additional repairs,before the Contractor proceeds with any additional repairs.Any costs in excess of the original repair estimate provided to the City by the Contractor, shall be absorbed by the Contractor,unless approved by the City. 3. If the total cost of repairs exceeds 70% of the replacement cost of the equipment, the Contractor shall verbally notify the City, with a written memorandum to follow as confirmation,within ten (10)hours from: 1)pickup by the Contractor,2)delivery to the Contractor's facility by the City or 3)review at the City's facility by the Contractor. The City shall notify the Contractor whether or not to proceed with repairs, before the Contractor proceeds with any repairs. The City shall not make payment for any unauthorized repairs. If the City decides not to proceed with repairs, the Contractor upon request by the City, shall either return the equipment to the City within forty-eight (48) hours or dispose of equipment in compliance with all applicable regulations, at no cost to the City. Procurement and Contracts Division Page: 7 Electric Motor and Pump Repair IFB15-0030 C. PICKUP AND DELIVERY 1. The Contractor shall provide pickup and delivery of all equipment to be repaired at the Contractor's facility, at no cost to the City . If the equipment is unable to be transported to the Contractor's facility, repairs shall be performed at the specified City facility, with approval by the City. 2. The Contractor shall pickup equipment for repair within twenty-four (24) hours from receiving verbal notification by the City, including after normal/business hours, weekends and holidays. Under emergency conditions (as designated by the City) the Contractor shall respond within two (2) hours from receiving verbal notification by the City. 3. The City shall be responsible for the removal and replacement of equipment, when feasible, for the initial repair and for a second time, if rework is required due to faulty repair by the Contractor. 4. All costs incurred by the City for the third and subsequent rework cycles shall be charged to the Contractor. 5. If the Contractor is found to repeatedly require rework of previously repaired equipment,the Contract is subject to termination by the City. D. SCHEDULE: 1. The Contractor shall commence repairs on equipment within ten (10)hours from pickup by the Contractor or delivery to the Contractor's facility by the City. This time frame applies to all equipment repair other than repair designated by the City as emergency repair,which shall commence upon receipt. 2. Routine repairs(as designated by the City)to equipment shall be completed within five (5) working days from pickup by the Contractor or delivery to the Contractor's facility by the City. All other repairs shall be completed within forty-eight (48) hours. The contract is subject to termination if repairs are not completed within the time frame specified. The termination provision specified herein shall be applied on a case-by-case basis. 3. Emergency repairs (as designated by the City)to: 1) electric motors less than 100 H.P. shall be completed within twenty-four (24) hours from pickup by the Contractor or delivery to the Contractor's facility by the City, and 2) electric motors greater than 100 H.P. shall be completed within forty-eight (48) hours from pickup by the Contractor or arrival to the specified City facility. E. EMERGENCY REPAIR: 1. The Contractor shall provide emergency repair either in the field or at the Contractor's facility on a twenty-four (24) hours a day, seven (7) days a week, including holidays, when requested by the City. Procurement and Contracts Division Page: 8 Electric Motor and Pump Repair IFB15-0030 2. The Contractor shall respond to the City's request for emergency repair within two (2) hours from notification by the City. F. AVAILABILITY OF PRODUCTS AND FACILITIES The City reserves the right to consider the availability of products and facilities for the products or services bid. The Contractor's location as listed in the Bidder's Questionnaire, question seven (7): Local Service Facility, or in question one (1): Company Name; address of principle place of business, if the principle place of business is the local service facility, shall be located within fifty(50)miles of City of Orlando City Hall, located at 400 South Orange Avenue, Fourth Floor, Orlando, Florida 32801. The failure of the Contractor to maintain a sufficient availability of products and facilities within the specified distance to the City of Orlando may be cause for rejection of the bid. II. ELECTRIC MOTORS A. GENERAL: 1. All work, materials, and work methods shall conform with the latest National Electrical Manufacturers Association(NEMA)Standards. 2. The Contractor shall be Underwriters Laboratories Certified(UL Certified). 3. All replacement parts or materials shall meet or exceed the manufacturers specifications and,when possible, shall be OEM parts and materials, unless specified otherwise by the City. 4. Insulation shall be to the insulation standards of the nameplate, unless otherwise specified by the City. 5. The Contractor shall repair all electric motors in accordance with the manufacturers technical data (including tolerances, calibrations and specifications) and industry standards and shall retain all original options (e.g., temperature devices and space heaters). B. GENERAL PROCEDURE: 1. Initial Inspection a. Upon receipt of a motor, and if winding failure is not evident, the insulation resistance shall be read. The insulation resistance of the stator shall be read using a megger. If the insulation resistance reading permits, the motor shall be run on full rated voltage. Minimum acceptable insulation resistance readings are one(1) megaohm per 1000 volts of rated voltage,but never less than one(1)megaohm. b. While the motor is running, a visual examination shall be made for hot or noisy bearings and excessive vibration or other unusual conditions. After the motor has Procurement and Contracts Division Page: 9 Electric Motor and Pump Repair IFB15-0030 been disassembled, the rotor shall be tested for open circuits. In the event the stator winding has failed,the rotor shall be tested on a"growler". c. Micrometer measurements shall be taken on mechanical parts to ensure proper fit. d. Test rotor for shorted lamination using a core test device. If the old stator windings have not failed, a surge comparison test and a DC high potential test is required to test for: turn to turn for shorts, coil to coil for shorts, phase to phase for shorts, phase to ground for insulation resistance and dielectrical strength of windings,etc. e. All of the above information shall be recorded on a shop record and retained in a permanent file. This record shall include a description of failure and the probable cause of failure. A copy will be provided to the City upon request. 2. Squirrel Cage Rotors a. The rotor shall be visually inspected, tested for open bars, steam cleaned and baked. b. All rotors shall be balanced below two(2)mils of vibration. 3. Slip Ring Rotor (Wound Rotors) a. The same procedure as -used on a squirrel cage rotor shall be followed. In addition,the open circuit voltage between rings shall be read and recorded. b. A surge comparison and a DC high potential test shall be performed to determine the conditions of the rotating windings. 4. Rotating Fields The same procedure as used on a squirrel cage rotor shall be followed. In addition,the fields shall receive an AC and a DC drop-check test and the readings recorded. Drop-check voltage readings,will be recorded for each coil and the coils will be numbered. A surge comparison and DC high potential test may be used to determine the condition of the rotating field. 5. Bearings Ball and roller bearings shall always be replaced with equivalent or superior bearings unless otherwise specified by the City. Sleeve bearings shall have bobbins refurbished to original manufacturer's specification. 6. Shafts and End Bells All bearing surfaces shall meet designed sizes. When out of limits, shafts will be metalized and end bells bushed metalized to designed size. All grills shall be unbroken and secure in the frame. Procorement'and Contracts,Division Page: 10 Electric Motor and Pump Repair IFB15-0030 7. Miscellaneous a. All defective items such as feet, lift rings, fans, fan covers, etc., shall be repaired and put in a first class condition. b. If grease type bearings are being reused, they shall be flushed thoroughly before installation and greased. c. Provide a written detailed description (make/manufacturer) of the type bearing(s) utilized for each repair. d. All 0-Rings exposed through dismantling of equipment shall be replaced with new 0-rings.Use of silicone or similar type caulking is not acceptable. C. WINDING INSTRUCTIONS: Winding Removal and Core Preparation Old windings shall be removed by using either a "Vapor-Phase" solvent system or a controlled temperature burn-out oven. In either case, the method used must allow removal of the winding without the use of any excessive heat,which might warp the stator frame. Upon removal of the winding and insulation, the core shall be tested for shorts in laminations (core test) and inspected for cleanliness and absence of burrs, sharp edges, and damaged iron. In the event the slots are not clean, the iron shall be sandblasted. Any damaged core iron shall be removed or individually treated to return the core to its original laminated condition. The iron and frame shall be in a first class condition before the rewinding procedure begins. 2. Winding Materials a. All materials used in rewinding shall be guaranteed to be capable of a specified minimum temperature class. Data of the original material fabricator shall be available to substantiate the temperature class of each material used. b. All materials shall be specified by temperature class. All insulation systems shall be specified by hot spot or limiting temperature. The type of materials shall be to the Class specified on the nameplate unless specified otherwise by the City. Without exception,the magnet wire in any equipment subject to heavy load and starting surges shall have a dacron glass outer covering. 3. Winding Procedure a. General Coils shall be machine wound, with all wires individually tensioned to obtain uniformity and freedom from "crossovers". Proper form shapes shall be used to give adequate end room clearance and prevent "burled" coils. All connections,jumpers Procurement and Contracts Division Page: 11 Electric Motor and Pump Repair IFB15-0030 and leads shall be laced down in a neat, secure manner with adequate clearance from the end bells. b. Random Wound Stators "U" shape wedges shall be used. In the event the coils are loose after the "U" wedge are installed, additional material shall be driven either in the bottom of the slot, between the top and bottom coils, or under the wedge to render the coils firm and tight. In some cases,it may be necessary to apply fillers in all three locations. c. Random Wound Rotors Maximum attention shall be given to installing the winding in a secure manner. The winding shall not be twisted or skewed while banding. d. Form Wound Stators The coils shall be spread properly so that the"side angles" are parallel to the slots and do not cause any "cutting in" due to non-parallelism. The coils shall have a secure and firm fit in the slots. All coils shall be securely tied to all surge and end rings. All group jumpers, connections and leads shall be securely laced. All wedges shall be fabricated to a "drive"fit and the proper amount of filler shall be installed with the coils to prevent any"up and down"movements. e. Rotating Fields The bottom collar shall be ground to the shape of the pole piece and spider rim. All amortisseur windings shall be sandblasted and visually examined for any evidence of cracking, mechanical damage or open connections. Any spots in the amortisseur winding found bad will be brazed before the winding is started. No phosphor bronze solder or brazing rod will be used on electrical connections. During final assembly, the mechanical joints shall be inspected for proper alignment and tightness. All electrical joints between coils shall be brazed,taped,and epoxy coated. 4. Completed Winding Varnishing The City prefers utilization of a Vacuum Pressure Impregnated (VPI)sealing process versus the varnishing process specified herein. If the Contractor does not have the capability to perform VPI work at their facility,the City has the option to: a. Arrange for motor repairs under a separate order,or: b. Allow the Contractor to utilize a subcontractor with this capability upon approval of the City,or: c. If the City approves a non-VPI process, the varnish shall be of the semi-rigid, high build type, capable of NEMA Class operation as appropriate. A minimum of three (3) dips and bakes shall be scheduled to ensure a good coating. The baking shall be done Procurement and Contracts Division Page: 12 Electric Motor and Pump Repair IFB15-0030 in a temperature controlled, forced ventilation oven to give the best and most uniform cure. A rapid process system may be used with prior approval from the City. 5. Reassembly All finished machine surfaces shall be cleaned of all varnish and foreign materials. The bore of the stator laminations and the periphery of the rotor laminations shall be cleaned of all varnish and foreign materials. All rings shall be turned and polished as necessary or specified. All brush holders will be cleaned of corrosion and foreign material. 6. Final Testing a. The insulation resistance shall be measured again with a megger. b. The motor shall receive an AC high potential test as follows: (1) New windings-twice rated voltage,plus 1000 volts. (2) Old windings-rated voltage plus 25%unless specified differently. c. A surge comparison tester shall used to test the windings for reverse coil, shorted turns, reverse phase, open circuit, short between phases,ground fault,etc. The motor shall be run on rated voltage and the following items observed and recorded: (1) No load current for each phase. (2) Excessive noise and/or endplay. (3) Bearing noise. (4) Vibration. (5) Excessive bearing temperature. (6) No load speed. In addition,drop-check and insulation test shall be performed and recorded. Copies of these final test results shall be provided to the City upon request. 7. Painting and Finishing The equipment shall be hand cleaned, removing all old paint and foreign materials, and painted. Exposed finished parts, such as shafts, shall be treated to prevent corrosion. The equipment shall be repainted the color that the equipment was at the time of initiation of repair,unless otherwise specified by the City. Any design changes, such as horsepower re-rating, speed, etc., shall be shown as new nameplate data. Nameplates,which are missing or are not legible, shall be replaced with a new nameplate giving as much information as is possible, in accordance with UL Certification. D. SERVICE REQUIREMENTS(ELECTRIC MOTORS): 1. Disassemble motor and clean all components. Procurement and Contracts Division Page:13 Electric Motor and Pump Repair IFB15-0030 2. Inspect electric motors for hot spots, core lamination loss, and assessment of the core's condition to determine if repair of the electric motor is needed. 3. Core test stator for shorted lamination before rewinding. The City shall require both a Core Loss Test and a Core Test. 4. Overhaul the components,rewind,repair,and/or replace any assemblies including: a. Rotor and Stator b. Shaft and Collector Rings c. Bearings,Original Equipment Manufacturer(OEM)or better 5. Surge test as specified in Part II of this Specification. 6. Dynamically balance the rotating assemblies below two(2)mils of vibration. 7. Paint all external surfaces to match existing color,unless otherwise specified by the City. 8. Test overhauled motors under maximum design load conditions when feasible to assure satisfactory operation. The Contractor shall specify in Attachment "A" to this solicitation, which electric motors can be tested under maximum design load conditions at their facility or which subcontractors will be utilized. 9. Field disconnection and reconnection as required for repairs and inspection, to include mechanical and electrical,when Contractor performs work at City facilities. E. EXPLOSION PROOF MOTORS: All explosion proof motors shall be repaired only by facilities which are U.L. approved to perform these type of repairs. If the Contractor's facility is not U.L. approved to perform repair of explosion proof motors, the City will have the option to: (1) Arrange for the repairs under a separate order. (2) Allow the Contractor to utilize a explosion proof motor U.L. approved subcontractor, upon approval by the City. III. PUMPS A. GENERAL: 1. The Contractor shall repair pumps in accordance with the manufacturers technical data (including tolerances,calibrations and specifications)and industry standards. 2. All replacement parts or materials shall meet or exceed the manufacturers specifications and, when possible, shall be OEM parts and materials, unless specified otherwise by the City. Procurement and Contracts Division Page: 14 Electric Motor and Pump Repair IFB15-0030 3. All work,materials,and work methods shall conform with the latest NEMA Standards. 4. Insulation shall be to the insulation standards of the nameplate, unless specified otherwise by the City. 5. All 0-Rings exposed through dismantling of equipment shall be replaced with new 0- rings. Use of silicon or similar type caulking is not acceptable. B. SERVICE REQUIREMENTS(ELECTRIC PUMP): 1. Disassemble and clean all components. 2. Overhaul the components repairing and replacing defective assemblies or parts as required. 3. Dynamic balance below two(2)mils of vibration. 4. Machining as required. 5. Test overhauled pumps under maximum design load conditions when feasible to assure satisfactory operation. The Contractor shall specify in Attachment "A"to this solicitation, which electric pumps can be tested under maximum design load conditions at their facility or which subcontractors will be utilized. 6. Paint all external surfaces to match existing color or the color specified by the City. 7. Field disconnection and reconnection as required for repairs and inspection, to include mechanical and electrical,when Contractor performs work at City facilities. 8. Generator engines and drive units are not included in the scope of this Contract. END OF SECTION Procurement and Contracts Division Page: 15 Electric Motor and Pump Repair IFB15-0030 ADDENDUM ACKNOWLEDGMENT FORM: The undersigned acknowledges receipt of the following addenda to the Documents(Give number and date of each): Addendum No. N/A Dated N/A Addendum No. N/A Dated N/A Addendum No. N/A Dated N/A Addendum No. N/A Dated N/A Addendum No. N/A Dated N/A Failure to submit acknowledgment of any Addendum that affects the Bid prices is considered a major irregularity and will be cause for rejection of the bid. Stewart's Electric Motor Works Company /01/& /a 6/— Signature Vice President Title Procurement and Contracts Division Page: 50 Electric Motor and Pump Repair EXHIBIT, B IFBI5-0030 Bidder's Name: BID PRICE FORM You are invited to Bid on the following: Electric Motor and Pump Repair The bidder, having carefully examined the specifications and Terms and Conditions herein, proposes to furnish all labor, materials, equipment and other items without exception for the proper execution and completion of the work, and if awarded the contract,to complete the said work within time limits as specified for the following bid prices. Item .Estimated Unit Unit Price Total No. Quantity Description LABOR RATES (SHOP) 1. 6,000 Hours Straight Time Hours $ 25.00 $150,000.00 Straight time is defined as being between the hours of 8:00 a.m. through 5:00 p.m. Monday through Friday. 2. 2,000 Hours Overtime Hours $ 25.90 $ 51.800.00 Overtime is defined as being between the hours of 5:01 p.m. through 7:59 a.m., Monday through Friday and any time Saturday, Sunday or during the holidays defined herein. LABOR RATES(FIELD) 3. 200 Hours Straight Time Hours $ 25.00 $ 5.000.00 Straight time is defined as being between the hours of 8:00 a.m. through 5:00 p.m. Monday through Friday. 4. 100 Hours Overtime Hours $ 25.90 $ 2,590.00 Overtime is defined as being between the hours of 5:01 p.m. through 7:59 a.m., Monday through Friday and any time Saturday, Sunday or during the holidays defined herein. INSPECTION CHARGES(SHOP) 5. 200 Hours The fixed price to inspect an electric motor or $ 0.00 $ 0.00 pump to develop a cost estimate for its repair. Sub-total(this page)$ 209 0.00 Bidder Initials • • 4 Procurement and Contracts Division Page: 41 Electric Motor and Pump Repair IFB15-0030 Bidder's Name: BID PRICE FORM You are invited to Bid on the following: Electric Motorand Pump Repair Item Estimated Unit Unit Price Total No. Quantity Description INSPECTION CHARGES(FIELD) 6. 200 EA The fixed price to inspect an electric motor or pump $ 0.00 $ 0.00 to develop a cost estimate for its repair. 7. $200 XX PARTS AND ADDITIONAL ITEMS 120% $240.00 Parts and additional items furnished by the (100%+your (Estimated Contractor shalt be at Contractor's actual cost plus a mark-up%= Quantity x Unit Puce=Total,see percentage mark-up. Evidence of actual costs may Unit price,see be required through,submittal of actual invoices. example) example) This mark-up percent is shown in the Unit Price column. The Total column is the Estimated Quantity multiplied by the Unit Price. FOR EXAMPLE:If your mark-up is 10%,the LIDA Price would be 100%+ 10%=110%.The Total would be$200.00 x 110%=$220.00 NOTE: Holidays:The days listed below are considered holidays: New Years Day Memorial Day Independence Day Labor Day Thanksgiving Day Christmas Day GRAND TOTAL(ALL PAGES)$ 209.630.00 Bidder Initials .X/` 1. FOB Point Destination 2. Discount Payment Terms(if any): 0 %, if paid within N/A days after receipt of invoice. 3. Is your company willing to accept the VISA ePayable solution for payment of all invoices? Yes X No 4. Is your company willing to serve as a secondary supplier in the event your company is not selected for primary award? X Yes No Recheck your quotations prior to submission.Bids may not be changed after being opened. Procurement and Contracts Division Page: 42 Electric Motor and Pump Repair IFB15-0030 $IDDER'S CERTIFICATION FORM: I have carefully examined the Invitation for Bid, Instructions to bidders, General, Standard and Special Conditions,Specifications,Contract and Acceptance Form and any other documents accompanying or made a part of this Invitation for Bid. I hereby propose to furnish the goods or services specified in the Invitation for Bid at the prices or rates quoted in my bid. I agree that my bid will remain firm for a period of up to ninety(90)days in order to allow the City adequate time to evaluate the bids. I agree to abide by all conditions of this bid and understand that a background investigation may be conducted by the Orlando Police Department prior to award. I certify that all information contained in this bid is truthful to the best of my knowledge and belief. I further certify that I am duly authorized to submit this bid on behalf of the bidder as its act and deed and that the vendor/contractor is ready,willing and able to perform if awarded the bid. I certify, under oath,that this bid is made without prior understanding,agreement, connection, discussion, or collusion with any other person, firm or corporation submitting a bid for the same product or service. I further certify that no officer,employee or agent of the City of Orlando or of any other Proposer has a financial interest in this bid. I further certify that the undersigned executed this Bidder's Certification with full knowledge and understanding of the matters therein contained and was duly authorized to do so. State of 7J r� '�^� Stewart's Electric Motor Works County of ore Iw l('2C NAME OF BUSINESS / Sworn to(or affirmed)and subscribed before me BY: day of J(.�l'l,UOA' ,20 Iby 1 SIG ATURE Paul Stewart—Vice President /� NAME&TITLE,TYPED OR PRINTED �_� Q0P Lill!I Signature of Nota , I 8951 Trussway Blvd Notary Public,State of -FL 0 e i O/a T MAILING ADDRESS Personally Kno--W71 Orlando,FL,32824 CITY, STATE,ZIP CODE Produced Identification (407)859-1837 Type: TELEPHONE NUMBER (407)859-2584 Company Tax ID# FAX NUMBER (The City only requires Company Tax ID numbers. The City is not requesting individual social security numbers.) Paul@semw.net E-MAIL ADDRESS :if, i. �,t REBECCA V KEOGH • r� •' MY COMMISSION*FF027891 � 4 Vie' EXPIf88Juno 18.2017 Oen oes Olba F1®fidaNelary@ervke.com Procurement and Contracts Division Page:43 Electric Motor and Pump Repair IFB15-0030 CONTRACT AND ACCEPTANCE FORM FOR SOLICITATION NO.JFB15-9030: Upon execution of this contract below by the City of Orlando ("City"),the undersigned hereby agrees to provide all goods and services set forth in its bid in response to the above referenced solicitation ("Solicitation")in accordance with, and subject to, all terms, conditions,and provisions of the Solicitation at the prices set forth in the undersigned's bid for the items and work awarded to it by the City. This Contract and Acceptance Form together with the (i) Solicitation, including all addenda, and (ii) the undersigned's bid in response to the Solicitation, including all schedules and forms submitted with the bid, all of which are hereby incorporated herein by this reference, shall constitute the formal written contract between the Ci and the undersigned. State of De) plel- SIGNATURE County of Oieh,/V 6E- Paul 'aE- Paul Stewart—Vice President Swo to(or aff ��ed)and subscribed before me NAME&TITLE,TYPED OR PRINTED io s /. da o _ `�, ,2015, by ._..rr — `�)rz , Stewart's Electric Motor Works ./ / ,rj NAME OF BUSINESS ignature of No . / / 8951 Trussway Blvd Notary Public,State of cl 0 1J MAILING ADDRESS Personally Know)(cycle if applicable) Orlando,FL,32824 fi cle. CITY, STATE,ZIP CODE -OR- s: REBECCA Y KEOGH 1 MY COMMISSION#FF027691 PHONE.(407)859-1837 Produced Identifi �$?an EXPIRES June 16,2017 13YWOT59 FlorldallolaryServlca corn FAX:(407)859-2584 Type of Identification: E-MAIL: Paul@semw.net • FOR USE BY THE CITY OF ORLANDO ONLY This contract is awarded to the party listed above as a: Primary Supplier: Secondary Supplier: x This contract is for: All Item Numbers: K or Item Numbers: INITIAL CONTRACT TERM: �/i 7/?t 1 S to 1 k6142d/$' ACCEPTANCE,: APPROVED AS TO FORM AND LEGALITY CITY OF ORLANDO,FLORIDA for the use and reliance of the City of Orlando,Florida,only. By: �2 O Chief Procurement Officer Assistant City Attorney ORLANDO,FLORIDA DAVID BILLINGSLEY.CPSM,C.P.M. Date: 1".``v u'"y C. ,2015 Date: Oru 23U ,2015 Procurement and Contracts Division Page: 44