Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
2015-73 • gai consultants
transforming Ideas into reality®
September 4, 2015
GAI Project No. A151309.00
Mr. James Kinzler
Assistant City Manager
City of Clermont
685 West Montrose Street
Clermont, Florida 34711
Proposal for Professional Services
Clermont ARC Center Signage Design
Clermont, Florida
Dear Mr. Kinzler:
GAI Consultants, Inc. ("GAI"or"the Consultant") is pleased to submit this Scope of Services/Fee Proposal
for Professional Services to the City of Clermont, Florida ("the Client"or"the City") for the above-
referenced project. This proposal reflects the anticipated Scope and fees for services to be provided
based on GAI's understanding of the project.
Project Understanding
The City of Clermont owns and operates a large Arts and Recreation Center(ARC) located at 3700 South
Highway 27. It is the city's desire to develop an identifiable sign located at the ARC along Highway 27,
which would incorporate the City's new brand and logo.
The Scope of Work includes the completion of conceptual design documents for the project sign and any
associated hardscape or landscape improvements that may be deemed appropriate.
In addition to the specific services detailed below (the"Services"), GAI will monitor the project schedule
as it relates to the scope contained herein, and provide timely invoicing and reporting of project progress.
Scope of Services
Based on our understanding of the project requirements/criteria provided to date by the Client, GAI will
perform the following described Scope of Services:
Task I —Conceptual Design
1.1 Site Analysis—GAI will visit the site in order to develop an understanding of the site's opportunities
and constraints.
1.2 GAI will utilize publically available aerial photographs and/or GIS information to create a base plan
for the project area.
1.3 Develop a project schedule based on our knowledge of the required design, and the fabrication and
construction process.
1.4 Prepare three color Conceptual Design elevations of proposed sign designs, which will indicate the
proposed layout, color, materials and any associated and related hardscape and landscape
Orlando Office 618 East South Street,Suite 700 Orlando,FL 32801 T 407 423 8398 F 407 843 1070 www galconsuitants corn
Mr James Kinzler
September 4,2015 Page 2
GAI Project No A151309 00
improvements. Hardscape improvements may include masonry, bnck or other signage base
treatments, in addition to the fabricated sign itself.
1.5 A Conceptual Design Plan(s)will also be prepared indicating the sign location, hardscape and
landscape improvements.
1.6 The proposed designs will adhere to the City's Brand Standards regarding logo, colors, etc.
1.7 Statement of Probable Cost-GAI will prepare a statement of probable cost for all elements detailed
in the Schematic Design Documents.
1.8 Client Review Meeting #1-GAI will meet with the Client to review the Conceptual Designs and the
statement of probable cost and will subsequently generate a consolidated set of review comments
from the meeting.
1.9 As a result of Client Review Meeting #1, GAI will modify the Conceptual Design plans into a single
color elevation and plan view of the project.
Additional Services
GAI will provide Additional Services as mutually agreed between GAI and the Client. An equitable
adjustment to GAI's Scope of Services and Compensation will be made through a Supplement to this
Work Order for any Additional Services. These may include but are not limited to:
• Completion of Design Development or Construction Drawings.
• Revise the drawings or other documents when such revisions are:
- Inconsistent with approval or instructions previously given by the Client, including
revisions made necessary by adjustments in the Client's program or project budget
- Required by the enactment or revision of codes, laws or regulations subsequent to the
preparation of such documents
- Due to changes required as a result of the Client's failure to render decisions in a timely
manner
- Due to a phased design approach determined after execution of this Proposal
• Significant changes to the overall project size
Schedule
GAI will begin work upon receipt of a copy of this Proposal executed and authorized below. GAI will
endeavor to complete its Scope of Services within the timeframe of the Client's schedule to complete the
project, subject to excused delay occasioned by factors beyond GAI's reasonable control.
Compensation
Compensation for services rendered by GAI will be on a lump sum basis in accordance with the rates
agreed to in the Master Agreement for Professional Services between GAI and the City of Clermont dated
December 9, 2014. GAI will perform the above described professional services for the fee summarized
below.
Description Method of Payment Fee
1.0 Conceptual Design Lump Sum $6,030
Total (not including reimbursab/es) $6,030
4gai consultants
transforming Ideas Into reality®
©2015 GAI Consultants,Inc
Mr James Klnzler
September 4,2015 Page 3
GAI Project No A151309 00
Sub-consultants
No sub-consultant firms are proposed for this project.
Reimbursable Expenses
Reimbursable expenses may include in-house and out-of-house projected costs required to perform and
deliver the Conceptual Design documents, such as postage, courier services, overnight deliveries, and
mileage. General reproduction will be provided by the Client for progress printing and permit submittals.
Reimbursable Expenses are estimated at$120.00.
Reimbursable expenses will be invoiced separately on an actual cost basis.
Payment
Unless otherwise specified in the GAI Standard Terms and Conditions for Professional Services, attached
hereto as Exhibit A, GAI will prepare invoices monthly and payment will be due within 45 days of the date
of the invoice. All other payment terms will be in accordance with Exhibit A.
Assumptions and Understandings
GAI's Scope of Services, Schedule and Compensation as set forth above have been prepared on the basis
of the following assumptions and understandings:
1. Access to the project site(s)or other land upon which GAI is to conduct any field work will be
available to GAI personnel in a timely manner.
2. Client has provided all its requirements for GAI's scope of services and all criteria and/or
specifications that GAI should utilize at the time this Proposal is authorized. This includes any
requirement for any statement of professional opinion or certification.
3. Client has provided all available information pertinent to GAI's scope of services, including
previous reports/drawings; utility information, etc. at the time this Proposal is authorized. Unless
otherwise noted, GAI may rely upon such information.
4. Client will give GAI prompt notice whenever it observes or otherwise becomes aware of any
development that affects the scope or timing of GAI's performance.
5. Client will examine and provide comments and/or decisions with respect to any GAI interim or
final deliverables within a period mutually agreed upon.
6. PURSUANT TO FLORIDA STATUTE 558.0035(1)(C), TO THE FULLEST
EXTENT PERMITTED BY LAW, CLIENT AGREES THAT AN INDIVIDUAL
EMPLOYEE OR AGENT MAY NOT BE HELD INDIVIDUALLY LIABLE
FOR NEGLIGENCE.
Please do not hesitate to contact me at 407.423.8398 if you have any questions or wish to discuss this
Proposal. If this Proposal is acceptable, please sign where indicated below and return one copy for our
file. This also will serve as authorization for GAI to proceed. GAI's performance of the Scope of Services
gai consultants
4
transforming Ideas into reality®
©2015 GAI Consultants,Inc
ti
Mr James Kinzler
September 4,2015 Page 4
GAI Project No A151309 00
will be governed by the Terms and Conditions outlined in the Master Agreement for Professional Services
between GAI and the City of Clermont dated December 9, 2014 for Professional Services.
REQUESTED AND AUTHORIZED BY:
Sincerely, City of Clermont
GAI Consultants, Inc. BY:
:1,
4111 PRINTED NAME: Oarre re.
1 TITLE:
Robert Schanck, P.E. 1
Director of Engineering
DATE: 7//6/
riff '
Frank Bellomo, PLA
Senior Director of Landscape Architecture
chitecture
RAS/FB/dro
• gai consultants
transforming ideas into reality,
©2015 GAI Consultants,Inc
IliHHhI3 I
1IIIIIhII!Fi
7.. 0
.,
Fi 11
p
a 1c
a
N
t 1111111111
O
s
I
H
N
. .
,..,
C
A
J
0
O
a
0
N
C
A
J
O
a
h
N
N N
N b 10 b N O 1T0 e2r1 0
O Yl •+ h t0 O n
u
3 T. N 10 e
O o
a a
> 0
N N1
Q Q
O 0
N N N N N VN VI N N N N
N n''
0 0 0
N N m ti w Qf
u N
N N N N N N N
m m N a N 'v1 .Q.
x
00 0 0 0 0
n a 1R v
e
.- N N
Q �'
M
O
N N N N N
N 10 O O N
+ N
2
O N O O O O O
0D N 100 O o
a N
0
N N N N N N N
N .. m .. m N r--
4)
u S _
0 79
u O O
H
O a
I
^ a u
C .M[ O
00 U Y1 6
h
u
C
Q
c
FO
C N
V0l N
T
L
6
c e
.. N
y 'd 8 r O E c o c
E a ro EwEz3 . q - > '2 wfZ z E o o wW N
d 1 iv u . S o y °1
H N g N N0A V 88 KV
a .. N m O Vf 10 N 00 01
— 8 N N N N N N N N N
H