2016-98 • gai consultants
transforming ideas into reality®
December 2, 2016
GAI Project No. A150494.01
Mr. James Kinzler
Assistant City Manager
City of Clermont
685 West Montrose Street
Clermont, Florida 34711
Proposal for Professional Services
8th Street Gateway FDOT Right of Way Approval and Coordination
And Construction Observation Services
Clermont, Florida
•
Dear Mr. Kinzler:
GAI Consultants, Inc. ("GAI"or"the Consultant") is pleased to submit this proposal for Professional
Services to The City of Clermont("the Client"or"the City")for the above-referenced project. This
proposal reflects the anticipated Scope, and related costs for services to be provided based on our
knowledge of the project.
Project Understanding
GAI Consultants, under separate agreement with the City, prepared design and contract documents for
the downtown gateway located at the intersection of 8th Street and SR 50. The project was publicly bid
and a general contractor was selected to build the project. The City now seeks the assistance of GAI
during the construction of the project to review the progress of the work as it is completed by the
general contractor. In addition, GAI will assist with coordinating approvals between the Florida
Department of Transportation and the City to allow work to be completed within the FDOT right of way.
Scope of Services
Based on our understanding of the project requirements/criteria provided to date by the City, GAI will
perform the following described Scope of Services:
1.0—FDOT Coordination
1.1 GAI will prepare a written response to comments received from FDOT Transportation Operations
Engineers regarding the plans completed to date. The comments were received via email from
Mr. Logan Land, Permits Manager of FDOT, on November 23, 2016.
1.2 GAI will respond to up to one additional series of comments/questions from FDOT in addition to
the response noted in 1.1, above.
2.0—Traffic Signal Plan
2.1 GAI will prepare a traffic signal plan for the intersection. This plan will indicate the signal
detection method which may consist of a video or a radar system. The plans will be prepared
meeting all FDOT requirements and will indicate the placement of all equipment as well as the
relocation of the signal heads as required by FDOT.
2.2 GAI will respond to comments received from FDOT regarding the plans, and will make one (1)
revised re-submittal to the department for approval.
Orlando Office 618 East South Street,Suite 700 Orlando,FL 32801 T 407.423.8398 F 407.843.1070 www.gaiconsultants.com
Mr.James Kinzler Page 2
December 2,2016
GAI Project No.A150494.01
3.0—Construction Phase Services
3.1 Respond to up to six(6) Requests for Information (RFI's)from the contractor.
3.2 Review and approve or deny submitted shop drawings, product data and/or samples as required
by the Contract Documents.
3.3 GAI will provide up to four(4) site visits to observe and become familiar with the progress and
quality of the work completed to determine if the work is generally being performed in
accordance with the Construction Documents.
3.4 Provide reports outlining the progress of the work to date and any deficiencies encountered
based upon the site visitations.
3.5 GAI's architectural sub-consultant will provide up to two(2) site visits to observe the construction
of the feature tower.
3.6 GAI will only visit the project site upon the request of the Client.
GAI will not be required to make exhaustive or continuous on-site inspections/observations to check the
quality or quantity of work or redesign/remodel and revise construction drawings due to unknown field
conditions encountered during construction. GAI shall neither have control over or charge of, nor be
responsible for, the construction means, methods, techniques, sequences or procedures, or for safety
precautions and programs in connection with the work, since these are solely the Contractor's rights and
responsibilities under the contract document.
Schedule
GAI will begin work upon receipt of a copy of this Proposal executed and authorized below. GAI will
endeavor to complete its Scope of Services and deliver the project deliverable subject to excused delay
occasioned by factors beyond GAI's reasonable control.
Compensation
The total estimated cost of GAI's services under this proposal is itemized accordingly:
Section Description Method of Total Fee
Payment
1.0 FDOT Coordination Lump Sum $1,300
2.0 Traffic Signal Plans Lump Sum $6,500
3.0 Construction Phase Services Hourly Not $6,000
To Exceed
Total Contract Estimate (less reimbursables) $13,800
Reimbursable Expenses
Reimbursable expenses may include in house and out of house projected costs required to perform and
deliver design documents, permit phase services, and construction phase services such as postage,
courier services, overnight deliveries and mileage. General reproduction will be provided by the Client or
the Architect for progress printing and permit submittals.
Reimbursable expenses will be Invoiced separately on an actual cost basis.
4gai consultants
transforming Ideas Into reality®
©2013 GAI Consultants,Inc.
•
Mr.James Kinzler Page 3
December 2,2016
GAI Project No.A150494.01
Payment
Unless otherwise specified in the GAI Standard Terms and Conditions for Professional Services, attached
hereto as Exhibit A, GAI will prepare invoices monthly and payment will be due within thirty(30) days of
the date of the invoice. All other payment terms will be in accordance with Exhibit A.
Services Not Included
The proposed scope of services and cost(s) assume the following items are excluded from this scope of
services:
+ Construction Phase Testing (compaction tests, pressure tests, bacteriological tests, concrete and
asphalt testing, etc.).
+ Geotechnical Engineering (coordination of these efforts for civil related items only).
+ As-built Certification Drawings(surveyed).
+ Excavation to determine underground features/utilities (i.e. soft digs). Underground Exploration
will be required for this project and are under a separate contract
+ Public involvement coordination for notification of commencement of construction, flyers, and
utility outage reports, traffic rerouting reports, etc.
+ LEED Certification
+ Site visits to landscape nurseries or suppliers of project materials or equipment.
Additional Services
Any services not specifically provided for in the above scope will be considered additional services.
Additional services we can provide include, but are not limited to, the following:
+ The MOT design and permitting shall be provided by a licensed professional engineer as a
requirement of the selected contractor's scope of work. MOT design and permitting for contractor
phasing/logistics will be considered an additional service and is not included in this scope of
service.
+ Boundary and Tree Surveys or Development of Cross Access Easement Documents or
Agreement Exhibits, Sketch and/or Legal Descriptions or Re-platting and associated Recording
Fees,Title Search Review, or Construction Easements.
•
+ Permit Application Fees (unless specifically noted otherwise).
+ Structural Design/Inspections.
+ Additional meetings and associated expenses.
+ Additional Phased expansion scope, design, and/or permitting.
+ Cost of Major Reproduction of Documents (it is anticipated that the Architect/Owner will mass
produce documents for permit submittals, resubmittals, project team distribution, and bid and
award).
+ Public/private improvements cost estimates or cost estimating.
+ NPDES NOI Permitting
+ Redesign/remodel and/or revise construction drawings due to unknown field conditions
encountered during construction.
+ Maintenance Guidelines
• gai consultants
transforming ideas Into reality®
©2013 GAI Consultants,Inc.
Mr.James Kinzler Page 4
December 2,2016
GAI Project No.A150494.01
+ Record Drawings.
+ Certifications or construction observation other than those listed in this scope of services.
+ On-Site Client Meetings not noted in the above scope.
+ Green/Sustainable Design Services
Assumptions and Understandings
GAI's Scope of Services, Schedule and Compensation as set forth above have been prepared on the basis
of the following assumptions and understandings:
1. Access to the project site(s)or other land upon which GAI is to conduct any field work will be
available to GAI personnel in a timely manner.
2. Client has provided all its requirements for GAI's scope of services and all criteria and/or
specifications that GAI should utilize at the time this Proposal is authorized. This includes any
requirement for any statement of professional opinion or certification.
3. Client has provided all available information pertinent to GAI's scope of services, including
previous reports/drawings; utility information; topographic information, etc. at the time this
Proposal is authorized. Unless otherwise noted, GAI may rely upon such information.
4. Client will give GAI prompt notice whenever it observes or otherwise becomes aware of any
development that affects the scope or timing of GAI's performance.
5. Client will examine and provide comments and/or decisions with respect to any GAI interim or
final deliverables within a period mutually agreed upon.
6. Any of Client's other consultant(s)/contractor(s) will cooperate and coordinate with GAI in a timely
and efficient manner.
7. GAI's proposed compensation and schedule are based on receipt of authorization to proceed
within thirty(30) calendar days of the date of this Proposal. GAI reserves the right to adjust its
compensation if authorization to proceed is not received within thirty(30)calendar days.
Please do not hesitate to contact me at(407) 423-8398 x 3038 if you have any questions or wish to
discuss this Proposal. If this Proposal is acceptable, please sign where indicated below and return one
copy for our file. This also will serve as authorization for GAI to proceed. GAI's performance of the
Scope of Services will be governed by the Terms and Conditions of the Master Agreement for Continuing
Engineering Services between the City of Clermont and GAI Consultants.
REQUESTED AND AUTHORIZED BY:
Sincerely, City of Clermont
GAI Consultants, Inc. By:
Printed Name: /- rye s Z f�
• gai consultants
transforming Ideas Into reality®
©2013 GAI Consultants,Inc.