2017-46 Orlando Office T 407.423.8398 4 618 East South Street F 407.843.1070 Suite 700 Orlando,Florida 32801 gai consultants March 13, 2017 Revised April 12, 2017 Mr. James Kinzler Director of Capital Planning, Grants and Projects City of Clermont, Florida 685 W. Montrose Street Clermont, Florida 34711 Proposal for CEI Services Victory Pointe— Development Improvements Project No. A151186.02 Dear Mr. Kinzler: Thank you for the opportunity to allow GAI Consultants, Inc. to assist the City of Clermont by providing CEI Services for the above referenced project. Project Understanding This project consists of hardscape and landscape improvements for Victory Pointe and improvements to W. Minneola Avenue, West Avenue, and W. Osceola Street as shown in the Victory Pointe Project Construction Plans, dated January 31, 2017. Scope of Services Based on our understanding of the project requirements/criteria provided by the City of Clermont, GAI will perform the following described Scope of Services: ► 1.0 Contract Administration • Attend the Pre-Construction Meeting, and chair and document progress meetings. • Review, analyze, and provide comments to the Contractor's baseline schedule for contract compliance. • Analyze problems and contractor proposals as required and provide recommendations. • Route and coordinate the review of material submittals and work plans. • Review and provide comments to the Contactor's Traffic Control Plan and coordinate lane closure requests. • Route and document Requests for Information and responses. • Assist in the processing of monthly pay estimates. ► 2.0 Inspection Services • Provide daily on-site inspection services. Monitor and keep detailed accurate reports of the Contractor's daily operations and significant events that affect the work, which Mr.James Kinzler Page 2 April 12,2017 Victory Pointe—Development Improvements will include earthwork, drainage, sheet pile walls, and boardwalks. The City will be providing inspection services for all utilities and roadway construction (embankment, base, asphalt, etc.). • Respond to Requests for Information (RFI's) from the contractor. • Review and approve or deny submitted shop drawings, TV Reports, product data and/or samples as required by the Contract Documents. • Provide on-site inspections from GAI's project design engineers and landscape architects at appropriate project milestones for detailed inspection of paving,drainage, and site features (boardwalks, specialty paving, landscaping, irrigation, etc.). • GAI's sub-consultant architect, geotechnical engineer, structural engineer and electrical engineer will provide site visits to observe the construction of their related disciplines. Understanding that the city will be providing in-house inspection of these elements, the architect, geotechnical, electrical and structural engineers will only perform a site inspection upon the request of the city, and will do so on an hourly basis at the rates described below and included in the total fee. • Based on the noted on-site inspections and observations, prepare certifications to FDEP for the sanitary sewer and potable water systems and the S]RWMD for the stormwater management systems. • Provide reports outlining the progress of the work to date and any deficiencies encountered based upon the site visitations. • Monitor and inspect the implementation of the Contractor's Traffic Control Plan to verify it meets the City's requirements. • Coordinate with the Geotechnical Engineer of Record during sheet pile and timber pile installation and regarding all unsuitable removal to ensure all operations comply with contract specifications. • Coordinate sampling and testing by the City's testing laboratory, review results to verify that the work complies with the contract requirements. Asphalt paving, utilities, and building inspections excluded, to be performed by City staff. • Verify the Contractor is conducting inspections, preparing reports, monitoring, and maintaining all storm water pollution prevention measures associated with the project. GAI will report deficiencies to the City. • Produce reports (source documents), verify quantity calculations, and make field measurements for payment purposes. • Provide pre-construction and progress photographic and video documentation. Schedule Services and costs are based on a Construction Contract duration of 12 Calendar Months. Compensation gaiconsultants.com Mr.Kinzler Page 3 April 12,2017 Victory Pointe—Development Improvements Compensation for services described above is on a hourly rate and cost basis limited by the Total amount below as follows: TASK NO. TITLE PMT. TYPE FEE Task 1.0 Contract Administration Hourly Rates $121,315.00 Task 2.0 Inspection Services Hourly Rates $165,405.00 TOTAL $286,720 Fees are based on the following man-hour rates: ROLE NAME RATE/HR Senior Project Engineer Greg Aldrich, P.E. $215.00 Senior Engineering Manager Keith Haugdahl $175.00 Senior Lead Project Engineer Nick Leyva $170.00 Senior Lead Designer Mike Curry $115.00 Project Administrator Dominic Fiandra $120.00 Senior Inspector John Powell $100.00 Inspector Aaron Palumbo $75.00 Contract Support Specialist Kelly Barrett $87.00 Dir. Landscape Architecture Frank Bellomo $225.00 Landscape Architect Ryan Seacrist $105.00 Architect Jeff Powell $180.00 Electrical Engineer Darius Adams $140.00 Sr. Structural Engineer Gary Krueger $175.00 Proj. Engineer, Structural Cathy Tiedge $150.00 Structural Eng. Specialist Stewart Scott $120.00 Grad. Structural Eng., Amin. Daniele Eberhardt $95.00 Payment Payments will be made based on the hourly listed above. Laboratory testing costs will be reimbursable at our actual cost. GAI will prepare invoices monthly and payment will be due within thirty 30 days of the date of the invoice. gaiconsultants.com Mr.James Kinzler Page 4 April 12,2017 Victory Pointe—Development Improvements Please do not hesitate to contact me at (321) 319-3066 if you have any questions or wish to discuss this Proposal. If this Proposal is acceptable, please sign where indicated below and return one copy for our file. This also will serve as authorization for GAI to proceed. REQUESTED AND AUTHORIZED BY: Sincerely, City of Clermont GAI Consultants, Inc. BY: �Ca4✓ P PRINTED NAME: ata / . A� h Greg Aldrich, P.E. Central Florida CEI Manager TITLE: pcbcjOr DATE: 4/1/52.5—("IC/��"' gaiconsultants.com