Loading...
Contract 2019-55A.14 - COF 04.27.2020CHANGE ORDER FORM Contract / P.O. Number: 2019-55 Bid Number: Change Order Number 14 Change Order Date: 4.27.2020 Project Name: STREETSCAPE PH 1 Department: Job Location: WEST AVE AND W OSCEOLA ST VENDOR INFORMATION: Company Name: TRAVERSE GROUP, INC. Address: PO BOX 121754 City, St., Zip: CLERMONT, FL 34712 Contact Name: ALICIA ROEHN Telephone: 352.409.6630 DESCRIPTION OF CHANGE: AReratlon, deviation, addition, or deletion caused by conditions encountered during construction not cowered by the spectiications and drewings of the project (attach ad&ftal pages y necesseryj. UPGRADE FROM 18" HDPE TO 24" RCP ALONG WEST AVE (W OSCEOLA ST TO MONTROSE) SEE INDIVIDUAL BREAKDOWN ITEM AMOUNT A. ORIGINAL CONTRACT VALUE $ 3,997,913.13 B. AMOUNT OF THIS CHANGE ORDER: $ ' Must be within the overed soope of services in accordance wHh contract specllkations C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A) 96 ..:: 04% D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 411,630.61 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (8+0) $ 425,976.10 CouncNapprovelregqviredhYover$49,999($100,000for construction)oforiginal conbactpriceORif funds are not available in theapproved budget for die Depsiftwat. F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 10% Maximum G. NEW CONTRACT VALUE (A+E) $ 4,423,889.23 IDLI� - 47"I-Pul /*1 itsi Vzo CONTRACTOR Date PROJECT ARCHITECT / ENGINEER Date bEPARTMtNT DIRECTOR Date PURCHASING DIRECTOR / CITY MANAGER Date Change Orders over 10%, not to exceed $49, 99g ($100, 000 for construction projects) of the original contract OR not budgeted, require the fallowing signatures: CITY OF RMONT ,\ ATTEST: Gail L. Ash, Mayor Date Tracy Ackroyd H e, City Clerk Date Rev. 12-6-19 Streets cape Phase 1- 18" to 24" RCP alafig West Ave (YV.Osceola Lo.Montrose] CHANGE ORDER # 14 L.N General t]esrriplion ❑ly Unit