Contract 2020-045A#2020-45-A KINZ CONSILTINS, LLC May 22, 202o Mr. Darren Gray City Manager City of Clermont 685 W. Montrose Street Clermont, FL 24711 Subject: Task Order #1-Proposal for Community Water System Risk and Resilience Assessment in Compliance with America's Infrastructure Act of 2018 Dear Mr Gray: Kinz Consulting, LLC is pleased to provide this proposal for professional consulting services to complete the City of Clermont's Community Water System Risk and Resilience Assessment. On October 23, 2018, America's Water Infrastructure Act (AWIA) was signed into law. AWIA Section 2013 requires community (drinking) water systems serving more than 3,300 people to develop or update risk assessments and emergency response plans (ERPs). The law specifies the components that the risk assessments and ERPs must address, and establishes deadlines by which water systems must certify to EPA completion of the risk assessment and ERR Each community water system serving more than 3,300 persons shall submit to the EPA Administrator a certification that the system has conducted a risk and resilience assessment in accordance with the Act prior to- • March 31, 2020, in the case of systems serving a population of 100,000 or more; • December 31, 2020, in the case of systems serving a population of 50,000 or more, but less than 100,000; and • June 39. 2021, in the case of systems serving a pmulation greater than 3.300—IM less thaw 50.000. Each community water system serving more than 3,300 persons is also required to certify its completion of an emergency response plan as soon as reasonably possible, but no later than six months after certifying completion of its risk and resilience assessment. Clermont's projected population is approximately 40,000, with a utility service area of approximately 43,000. Therefore the completion date is mandated as June 30, 2021 for the risk and resilience assessment and December 31, 2021 for the ERP. It is the intent of this proposal that ERP compliance be addressed at a later date and task order, 1 Task order #1 Task 1a - Risk and ResilienceAssessments Section 1433(a) of the Safe Drinldng Water Act (SDWA) outlines the requirements for risk and resilience assessments as follows: Such an assessment must include— (1) the risk to the system from malevolent acts and natural hazards; (2) the resilience of the pipes and constructed conveyances, physical barriers, source water, water collection and intake, pretreatment, treatment, storage and distribution facilities, electronic, computer, or other automated systems (including the security of such systems) which are utilized by the system; (3) the monitoring practices of the system; (4) the financial infrastructure of the system; (5) the use, storage, or handling of various chemicals by the system; and (6) the operation and maintenance of the system. The assessment may also include an evaluation of capital and operational needs for risk and resilience management for the system. To assist utilities, the AWIA directs the EPA to provide baseline information on malevolent acts of relevance to community water systems no later than August 1, 2019. This information must include consideration of acts that may— (1) substantially disrupt the ability of the system to provide a safe and reliable supply of drinking water; or (2) otherwise present significant public health or economic concerns to the community served by the system. Kinz Consulting will visit and assess all major components of the Cary of Clermont's two Public Water Systems (PWS) — City of Clermont 3350215 and City of Clermont East 3354779. Components include: All active potable raw water wells Both Water Plants and Elevated Storage tanks Water system Interconnect locations Chemical and Fuel storage sites Review of Major transmission pipes SCADA, Security and IT Networks Administrative and Financial Installations Other major assets and vulnerabilities as identified by staff. 2 Task order #i Each community water system serving a population of 3,301 people or greater, mast certify the completion of its risk and resilience assessment for every individual PWSID number - City of Clermont 33SO215 and Cit of Clermont East 3354779, either collectively or individually as required by EPA. Exclus,nns- No later than six months after certifying completion of its risk and resilience assessment, each system must prepare or revise, where necessary, an emergency response plan that incorporates the findings of the assessment. This scope does not include services to prepare the emergency response plan. Fees for Service - Professional Fees for consulting services detailed in Task la & 1b for a total of $45,000 lump sum to be billed monthly based on percentage of project completion. We appreciate the opportunity to serve the Clermont Community and will provide the exceptional service that is expected and deserved by the City, Sincerely, Kinz Consulting, LLLC JamhVA Ile 3 ibsk oraer#n Authorized by: City of Clermont