2002-30
.' .
.
.
.
..
.
5~
SUBAQUEOUS
~l:r\'I((~,i!~(.
.
Via fax
352-394-3542
March 14,2002
Ms. Tamara Richardson
CITY OF ClERMONT
Engineering Department
I Wesqaœ Plaza
Clermont. FL 34712
HE:
CENTER LAKE MUCK REMOVAL
Dear Ms. Tamara Richardson:
Please find attached a signed agreement for the Center Lake Muck Removal ProjeCt. Please sign and fax
back.
Also attached are the: results of the soil sample from Center Lake for you information.
We look forward to working for you.
~-
LANCE W. YOUNG
Vice-President
lWY/lkm
Enclosures
5:\lIID5 A MAIhCO1NG\IIIOS OII'I\100z\CIIy '" a.:m-t. 0- 1M.. Muck R--'\aIl'K1l1.AICF. MUCIC R~M()VAl FINAI..)'OI"O2.
'flUI 1(,::'1" I\n:11I 1 r'llfl bllll.'n,bk. fl,lHH 11,154 5tU 28W 1 h\x' 95't 5t\'1 rOil
-;:~¿¡,? ~
..'
.
.
.
..
.
.
BID FOR THE CITY OF CLERMONT, CENTER LAKE MUCK REMOVAL
Date: February 26, 2002
SUBMITTED TO:
Ms. Tamara Richardson
City of Cermont
1 Westgate Plaza
Clermont, FI 34712
lMcnoiption of Work
Subaqueous Services, Inc., (hereinafter SSI) will perform the scope of work as outlined
in the Customer's Request for Proposal, and Sea Systems Corporation Drawings dated
February 25,2002, attached hereto and Incorporated herein. The dredging will be
performed utilizing a hydraulic excavator and a flexi-float barge system. All dredged
material will be loaded into the barge's hopper and transported to re-handling areas,
where the material will be stored and maintained at a location approved by the Owner
on the Lake's adjacent shoreline. At these locations, the dredged material will be re-
handled into trucks to be transported to a final destination site. The final destination
site may be either a site that is located on SR SO approximately three (3) miles from the
Lake and is owned by Fox Hill Builders, Inc., or a site to be provided by the City of
Clermont within five (5) miles of Center Lake. ,In the event that the CIty of Clermont
provided disposal site is used, the dredged material will become the Oly of Clermont's
responsibility once deposited.
Identification of any I all Subcontractors
No subcontractors will be utilized at this time.
Insurance lJeQuiremenls
Certificates of Insurance evidencing our coverage are attached hereto; wherein, we have
named the Customer as certifICate holders to our current policies.
Written F.y~S
l.
2.
The owner will provide all necessary permits.
In the event of a misunderstanding or conflitt betWeen the terms and
conditions stated in the plans and specifications, this contract shall govern.
.
3.
551 shall .prOVided with suitable access to .WOrk area. 551 shall
undertake its work within 30 days and proceed continually through prOject
completion. SSI shall not be liable for any failure to undertake or complete
work due to causes beyond Its control, including but not limited to: fire;
flood, or other casualty; labor diSputes; accidents; and the Acts of God,
whether indirectly affecting this work or other operations in which SSI is
involved.
It is expressly agreed that there are no promises, agreements or
understandings not set out in this agreement. Any subsequent cancellatiOns,
or modifications, must be mutually agreed upon in writing.
The dty reserves the right to cancel the contract if it becomes apparent that
the objective of the project cannot be met. The contractor will be paid in a
prorated basis for work completed.
The contractnr will maintain roadlway access on west Avenue and St1l Street
throughout the projeCt duration.
Access to the site shall be at the intersection of Juanita and west Avenue.
4.
s.
6.
7.
References. Illustrations
A list of multiple references, completed projects and/or illustrations will be given to
Customer upon request.
ØØBJI ~anON
SSI will mobilize dredging equipment and barges thirty (30) days after reœipt of Notice to
Proceed from Owner.
.
ImA., ~TED 1IME 10 COMPLETE PROJECT:
Option i: 90 Calendar Days
.
.
.
.
.
$C:HEDULE OF BID PRICES
.
OP110N 1
112m Item Description Est. Qty. Unit UnltPrtce Total Priœ
No.
Collect, Haul and Disposal of ..
1 all dredged material to reduce 35,000 CY $10.00 $350,000.00
the final lake bottom elevation
to 83.7 feet.
Re-grading and restoration of
2 previously stDdcplled maœrial, 1 L5 $25,000.00 $25,000.00
as-builts, surveying, ~nd re-
enalneerina.
TOTAL PROPOSAL AMOUNT $375,000.00
-.
PAYMENT SCHEDULE
The customer will be billed on the 2'1" of each month, with payment due for billing on the 10'"
of the following month.
For. City of Cermont
o?-
rQ I IlArvnJe. -MD.¿j ~í
03 ~/'-oJ...
DATE
DATE
5;\11105 'I'IAIUŒ:TING\IIIOS ~ øI aø- . ow ~ MUaI-.-alfTfII LNæ P!UCt 1IfI'IOVAI. nlW.J-eHI2.CIOC
.
.
Envirodyne Inc.
Page -L- 01 L c»
.-
.
4805 NW 2nd AV8ß1.9 . SOC, Ralon, Fl 33431 f
(56f) 9(19.5225' Flit (56'J 919-6204 g
....
CHAIN OF CUSTODY RECORD
AND
ANALYSIS REQUEST
PROJECT NUtABER PROJECT NAME P'Q NUMBER SAMPLE PRESEfN'TNE /
C ~l1f~,. Lo..ke. T'tPE IIIIIII
PROJECT LOCA'TION l/!jj ~~/ ï:i ïiiJ !::_w..,
C'1-"i of C lermON+ FL
OLIEHT NAME' CLIENT ADDFE8S '
~u~ «~.o&.t J 0((1 F, ~ IE. /~~o/!~¡,Ir//~. ~
PHONE 791.. f/tN-s,~r
Servttes fA)(
SAMPLE INFORMATION
I
1 31111o~ Dt-e ctlf .e MQIerA.1 r/ .I Ii r/./ V ~" O(A.~
2 3/1 '1-/0 Z
3 ~W" I1j
4 1fJ1l/(
5 AI ~~~~..,
.. "'~"...
- ~... ~
6
7
8
I
10
&l.E COlLECfEÐ ev ARE THESE SAMPLES LISTED OR OfARACTERlST1C HAZARDOUS WASTE? eYES (J NO . TOTAL OF ALL
ARE THESE SAMPLES FROM () PETROLEUM 0 DRY CLEANER OR a cmtER SITE? COlfI'AßtERS
s 9Ð "E~RT 'R) (pEflSON) .~HEO frf '. Dl'1£ TIME . RECEIVED By . DQ'"E' m,E
LaNte. MI. Vfu.a"¡' 3AJ/6~ 1'--;;;;/ L- d ~ ~ 3hJÆz. 10.'00
1 10: (JD
BAMl'lES COHaTIO" I
tNT7tet" 8 4
L.OQ MAoIBM
<002/0322.4 5 6
.
.
8.
-
....
a
þ
!E
ì
-<
i!r
~
...
~
.
-
-
,.
Jt:
2
(S)
UJ
"-
...
:-
"-
(S)
N
...
...
:-
111
])
.....
.
==
...
"
(S)
~
""l1lI
C8
a
S
-
'"
J:
~
.
; ..
.
.
03-14-2002 II :ZIAU
FROHNV I RODYNE
5&1-8.8-5204
T-&25 P.OO3/00S Hr.
.
Envirodyne Inc"
48D6 N. W. 2nd A.,...
IIM:."" R. 33U 1
567-sB9-ti2Z6
....~net
CERTIFICATE OF ANALYSIS
&IÞaq\Ico1lS Sav1ca [O)IR1AIfY Report: 2002103224
42011Ceaa RoI4
Fe. LawScnIalc, FL !œl' Sample No: 2002103224- 1
Attaation: LaDce W. YOllllC PÞtJaI: cear.er L8Iœ
a--. PI.
CoIkœJd by: Yaar 1tqIracaIIdw: ~ em: 03/11102
SAMPLE ID: DraIce M8terial R.ccciYcId aD: 03/13102
p A1tA1IBTBR RESULT ftiU. DOl) DL URrl'S DATE ADLYS'l'
"Solids 1.8 D221e ,., 03/1 3/02 MHA
Arsenic, T.C.loP. BDr. 1311/6010B 0.d60 mGIL 03/14/02 MHA
Barium, T.C.L.P. DOL 1311/60108 2.0 mglL 03/14/02" MHA
Cadmium. T.C.L.P. BDL 1311/60108 0.0050 mg/L 03/14102 MHA
. Chromium, T.C.loP. BDL 1311180108 0.10 mg/l 03/14/02 MHA
Lead, T.C.L.P. BÐL 1311160108 0.015 mglL 03/14102 MHA
Selenium. T.C.l.P. BDL 1311/60108 0.050 mglL 03/14/02 MHA
Silver. T.C.L.P. BDL 1311160108 0.10 maIL 03/14102 MHA
Mercury, T.C.loP. ""0 1311n474 0.00050 mgIL
Copper "5.8 80108 5.8 mg/kg DSn 3JO2 YJC
Nickel BDL 6O10B 5.6 mgllca 03/1 3102 VJC
pH 5.7 90458 DH Units 03/13102 JMJ
.
Analysis PerfOJmed ja ACCOI'daDÐe WIt E.P.A.. Mc:dIods
LåoI8ry CatiIiadoø No. 8861a
OAIOC am
-~ -~ '-IIIIH
DL-Df8aIen .....
1
SØØ'd ~SÞ:TT ZØ/ÞT/EØ
'. ;
.
.
03-14-2002 II :ZIAM
F ROHNY I RODYNE
561-881-5204
T -625 p. 004/005 F-174
.
Envirodyne Incø
4BIJ5 No W. 2IId A-
IIf1W .... FL 3343 1
561.989-5225
.".,...061111 utll."",
CERTIPICA TB OF ANALYSIS
Sub8queous Semces
4201 KcaD Road
Ft. Uudcrdalc. FL 33314
[Q)IPaAlFli
Prqioct: CeaIIr lab
aem.cmt. PI.
~R: 2002103224
Sample No: 2002J0322A- I
Attention: LaDee W. Y OIIIIC
SAMPLE ID: Dredp Maf8i81
I'AlI.-... bJ: YOIIJ' D I
--:we
ean...t am œn llG2
ItIahaI em: œ/13/œ
DIU: of ADIlylÌl: 01/1!11O2
DIIe of EmzåoD: O3/13m
8310 POL YNUaEAR AROMATIC HYDROCARBONS
P ARAIŒ"rKR 1ŒBt1LT DL uau. :nJ A8L yft
Acenaphthene BDL 3 . 3 1£9/kg SJM
Acenaphthylenc BDL 3.3 p.g/kg SJM
Anthracene BDL 3.3 p.g/kg SJM
Bet\z.o(atanthracene ~L J.3 JlS/kg SJM
. Benzo(b)fluor8nrhent 1m%, 3.3 ¡lg/kg SJM
Benzo(g,h,i)perylene BDL 3.3 ¡lg/ks SJM
Benzo(k)ffuoranthene am. 3.3 l.g/kg SJM
8enzo(a)pyrene JmL 3.3 ugl~ SJM
Chrysene JmL 3.3 ¡lg/kg SJM
Dibenzo(a.h)amhracene BDL 3.3 l.g/kg SJM
Fluoranthene Eœ 3 . 3 £g/kg SJM
Ruorene Jm. 3.3 p.g/kg SJM
Indenot1 ,2,3-c.d)øvrene BDL 3.3 Jig/kg s.JM
1-MethyinaphthaJene 120 3.3 1l9/kg SJM
2-Methylnaphthalene 88 3.3 l.g/kg SJM
Naphthalene 19 3.3 lg/kg SJM
Phenanthrene BDL 3.3 p.g/kg SJM
Pyrene BDL 3.3 l9/kg SJM
.
Au1}'1Ï1 Pertonœd in A.ccoIdIIIœ \Vida EoP.A. MCIbDck
1..\110,." CcnIIcadoII No. _la
2
~ ~ eA- &.I8IIf
DL-OI8cdI8 LIIIIIc
LØØ'd ~s~:tt ZØ/~t/EØ
.
.
.
\
. .
.
.
03-14-2002 II :21AY
FROIHNV I RODVNE
661-888-5204
T-'25 P.OD5/0DS F-m
En virodyne Inc.
4IJØ5 N. W. 2nd AVWIW
BIICII .fØII, R. 33431
561-SIJ9.5225
ødynø@lalnxrtll..IJ8f
CERTIFICATE OF ANALYSIS
SUbaqueous Services
4201 Kam Road
Pt.1.IudcrdaIe. FL 33314
[õ)(Rl~[¡sf
RqxHt: 2002103Z1A
Sample No: 200210322.4- 1
AttendaD: Laaœ W. Yoaug
Project: Cea. Lab
CImmmt. R.
Co11a:ted by: Yaar RqxaaIadvc
CoD~"" œ: 03/11102
ReceMd on: 03/13102
SAMPLE JD: DraIce Material
Daa: of AIIal)'IÌS: 03113102
Dare of ExtøaioD: O3/131œ
FL.PIlO TOTAL RECOVERABLE PETROLEUM HYDROCARBONS
PARAKB'I'BR
Petroleum Range Organics
Hydroc8rbon Runge
USOLT
110
C8-C40
DL~B
AIDLL YS'!'
10 nø/kø
MLD
MLD
Analysis containød herein conform to EPA. SlandðrCl Me1hodl and DEP approV8d method. per Envirodyne
Comprehensi'lO Quality Assurance Plan No. 890041. SuÞeomneted analyses 118 denol8d by aeniflcatfon
numÞ8r in the analyst COlUmn. AD relevam quality aiSUrll1C8 samples were wilhin specified contrOl
limits unless otherwise ..ted. Uncertainties for œst results are avlllable upon rsquat..
Envirodyne certifies its 1IeSt results meet III requirements of the NElAC Standards, ~ applicable.
For questions. pl8ÆIse caD tfte ptOject mlNlge' It the numb., nated /IboV8.
This is the last peg. 011118 reporr.. See Þoaam at ..... for toI8I .......
Project Manager
QualIty Assun nee Director
ADalysis &:'fuuaal hi Aamd8Dœ Øh E.P.A. MCIIhock
WIIonlGl7 C8nif1GMio8 No. ,.h..
OAIOC RLYiew
ìbt.~8I1awn -.~
!L- DI8cdn I.I8k
3
A~.rl H~~:TT 7~/~T/Ç~