Loading...
Contract 2019-55A.30 - COF 12.10.2020CHANGE ORDER FORM Contract / P.O. Number: 2019-55 Bid Number: RFB 19-051 Change Order Number: 30 Change Order Date: Oct 27, 2020 Project Name: Streetscapes Phase 1 Department: Public Services T Job Location: West Ave. and W. Osceola VENDOR INFORMATION: Company Name: Traverse Group, Inc. Address: P.O. Box 121754 City, St., Zip: Clermont, FL 34712 Contact Name: Alicia Roehn Telephone:352-409-6630 DESCRIPTION OF CHANGE: Alteration, deviation, addition, or deletion caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary). Additive change order for additional parking spots on West Ave., sewer replacement and post office drainage. ITEM AMOUNT A. ORIGINAL CONTRACT VALUE: $ 4,423,889.23 B. AMOUNT OF THIS CHANGE ORDER: $ 36,132.60 Must be within the overall scope of services in accordance with contract specifications. C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): % 0.8% D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 488,707.90 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $ 524,840.50 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 10% Maximum % 11.9% G. NEW CONTRACT VALUE (A+E) $ 4,948,729.73 This Change Order is not valid without the following signatures: CONTRACTOR Date PROJECT ARCHITECT / ENGINEER Date DEPARTMENT DIRECTOR Date PROCUREMENT DIRECTOR / Date CITY MANAGER Council approval is required if change order(s): 1) exceeds $49,999; 2) exceeds the greater of $100,000 OR 10% of the original contract amount for construction projects; 3) the funds are not available in the approved budget for the department. CITY OF CLERMONT ATTEST: .'::� - lal?12-0- Timothy Mur ayor Date Tracy Ackroyd Howe, City Clerk Date Rev.9-23-2020 Extended Price STA 12+90 LT 2 Parking Spots $ (937.40) 10.2 6" Concrete Driveway (CREDIT) 401 LF $ (10.95) $ (4,390.95) 10.7 Type F Curb 60 LF $ 32.00 $ 1,920.00 9.3 6" Limerock Base 39 SY $ 12.50 $ 487.50 3.1 12" Stabilized Subgrade 58 SY $ 3.00 $ 174.00 9.6 2" SP 9.5 Asphalt 39 SY $ 15.95 $ 622.05 1.11 Survey/ Layout 1 LS $ 250.00 $ 250.00 8" SDR 26 SEWER REPLACEMENT STA 11+20 $ 3,500.00 8" SDR 26 San Sewer 70 LF $ 40.00 $ 2,800.00 E6.5 6.14 San Sewer Removal 70 LF $ 10.00 $ 700.00 Post Office Drain STA 13+15 right $ 3,500.00 6.23 Core existing Manhole 1 EA $ 1,250.00 $ 1,250.00 5.12 10" HDPE Storm Pipe 35 LF $ 50.00 $ 1,750.00 5.15 12" Nyoplast Drain 1 EA $ 500.00 $ 500.00 Duke Additions $ 30,070.00 7.20 4" Conduit Bore 290 LF $ 35.00 $ 10,150.00 185 LF$ 33.00 $ 6,105.00 ncrete 12 EA$ 75.00 $ 900.00 a t 21 EA $ 25.00 $ 525.00 Sweeps with Concrete 42 EA $ 295.00 $ 12,390.00 ADDITIONAL 12 DAYS TO CONTRACT $ 36,132.60