Contract 2019-55A.03 - COF 02.28.2020CHANGE ORDER FORM Contract/ P.O. Number: 2019-55 BId Number RFIa I4-09 Change Order Number: 3 Change Order Data: 2.28.20 Project Name: Streetscape Ph 1 Department: 0z 4vl YkoNt W T AL Job Location: West Ave and W Osceola St VENDOR INFORMATION: Company Name: Traverse Group, Inc. Address: PO Box 121754 City, St., Zip: Clermont FL 34712 Contact Name: Allan Roehn Telephone: 352.409.0630 DESCRIPTION OF CHANGE: Anlaratlo+a,ds�iatiorr,addPolon,ardeleHonCausodbyoonddlonaeneoutMrsddwinpGartaEryctia►notwviendb N+e r ���ois.nd dra►wnQaottheprglarx(a�HeadA'l�,.rp.�ssNrncsaawy). 71h Street Storm Revisions and Sewer additions along with miscellaneous credits due (see change order breakdown for details}. Addhional 30 days to contract. MEb! AMOUNT A. ORIGINAL CONTRACT VALUE $ 3,997,913A3 B. AMOUNT OF THIS CHANGE ORDER: awbe wiM the ovNeswe oiasndaaa lot scaordmoe VAN GGnbrtda vC0baoierU $ 85,812.08 C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B1A) % 2.1% D. AMOUNT OF PREVIOUS CHANGE ORDERS. 5 86,106.80 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D} PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E!A): 10% Maximum g 150,920.88 F. % 3* % G. NEW CONTRACT VALUE (A+E) $ 4,148,834.01 21 /�---6t!�j3 3 Zo a CONTRACTOR Date PROJECTARCH 1 GINrA Data (IS DEPART NT DIRECTOR Date RCHASINO J E CI R Date uGS. II C CITY OF CLERMONT ATTEST: Gail L. Ash, Mayor DWW Tracy A~ Ham. City Clerk Date �--.�� COUNGIt_ r4FPR�VAL tS a$4vtg� W C-WAiv4w a-Avmr OrXrruvs ``'Z' a xewtp S -roc Ce,awA' ot= #Ibo,000 DI(Z 1 olo trF TNT 0ILI e 061 N,A L. GON'1—T24GT A tt vvN T 'Fcrt CONS'T IZ04V'oxr pv%0Wwrs� 3' THE 'FvNv S A Rir MOT AV,A ItA SLcr 41. --ti } tF ,d 4'�It4yVi� $v�4gT T—'Q - 1-6 19 p BSA PiT I. Change Order Approval To avoid a delay in the progress of any project, the Purchasing Director, City Manager or designee may approve, without further Council action, a change order to an existing contract provided the change order is within the overall scope of the project, does not exceed the greater of ten percent (10%) of the original contract amount or $100,000 for construction projects, or does not exceed $49,999 for non -construction projects, and the funds are available in the approved budget for the Department. If the change order is in1k excess of the above threshold or if the increase in cost requires a budget amendment, the change order must be approved by the City Council. The Purchasing Director will ensure the scope of services is in accordance with the contract specifications. No oral statement of any person shall modify or otherwise change, or affect the terms, conditions or specifications stated in the resulting contract. All change orders must be approved in writing by the City prior to the work commencing unless the delay in receiving City approval causes serious threat to the public health, safety or welfare, or will result in significant additional cost to the City due to delay. Under any circumstance, work to be performed under the change order shall not begin until all written approvals have been received. Any work completed by the contractor without required written approvals will be the sole responsibility of the contractor, not the City. J. Contract Approval, Amendments, Renewal and Extension The Purchasing Director, City Manager or designee is authorized to approve and execute contracts if the total contract amount does not exceed the Purchasing Approval limit (see Section H) and funds are available in the approved budget for the Department. This includes, but is not limited to, service or maintenance agreements, awards on proposals, competitive negotiated agreements, and consultant services agreements. All contracts with a total value of $50,000 or greater, one-time or annual basis, shall require City Council approval. The Purchasing Director, City Manager or designee is authorized to approve any change to a contract that alters the terms and conditions or provides a change in the scope which total value does not exceed the Purchasing Approval limit (see Section H). Such changes must be signed and approved in a formal amendment. All amendments with total contract amount of $50,000 or greater shall require City Council approval. The Purchasing Director is authorized to renew approved contracts as long as such action is in accordance with the terms, conditions, and renewal period specified in the original contract and the total dollar amount of the contract is within the City's approved budget. Contract renewals beyond six (6) years from the date of the original contract shall require City Council approval. 10 Rev. 11/12/19 ORDER# a ADOMCM OF . DAYS 10 COW ty. Unit 169.O DIAL ■ i 70,iiY.W 1.01 I�IF�6irellon 1 LS i 3.500.00 S 3.50 IM 108 G-®ult Drawlrge 1 LS i i 1,500.00 1.10 MOT 1 LS 5,500 00 i 6,600 00 1.08 Temp Constnxtlon fence 1 LB 700.00 i 70 M 1.11 Survey Layout 1 LS i 1.500A0 i 1.500.00 1.12 Tm*o 1 LS i 2,500.00 i 2.50r W 21110.0I5111OLITION $11.987.50 2A8 Remove F Curb 60 LF S 5.00 $ 300.00 2.11 'TIO Ranovs and Dbpm of Asphal 1850 OF i 0.85 i 1.572.60 Saw Cut BON ASOM 50 OF $1.25 i 02.50 2.19 Saw Cut Concrete 50 OF i 125 i 02M 2M Remove and Dispose of ooncreie base 1551) 3F i 5.00 i 0.260.00 2Z7 Md mil Jo>nts 1 IS S 750.00 $ 750A0 300- Eerth"M WA &"Mq $1,770s00 3.01 12■ "Waft 205 SY i 3.00 i 815.00 3.03 Roedwaey Gradlq 205 SY $100 i 410.00 3.18 RM DMU 1 Ls i 760.00 7M w 00- STOM DRAINAGE i 27AM.00 5.01 RWww t M-V;Q 2 EA i 750.00 01,500.00 SM Remove Wd Top 2 EA $1, .00 $ 2,000 5.05 Remove sidng IF Rep 85 LF i 15 00 $ 975.00 5.08 Ranovs tft" IV RCP 70 LF i 7.50 i 825A0 5.13 Install IV RCP 140 LF $ 42.50 i 5.950. 5.17 storm DmNrapa Manhob 1 EA i 3,500 00 $ 3. 5.27 Can F� & H g Mwhole !Or 1V ACP 2 EA i 3,260.00 i 8j 529 Inlet Top w1h Type 0 Inlet Tap 1 EA i 3.600.00 i 3 521 Replace Inlet Top wkh Mod Type 5 Inlet Top 1 EA 3.500.00 $ M. SANITARY SEVM :70,,78M 6.01 Remove ard Replace Labral 2 EA i 1,Z50.00 $ 2,500.00 6A2 Instal NewB- Laleml 2 EA i 750A0 $1.500.00 6.03 budd V Clean outs 2 EA $160.00 i 300.00 8.08 InBtd 12■ PVC sewer (Cn Q 845 LF (625.00) (; 21.125.00) 8.09 Senitery Sewn Manhole CM cuq 2 EA 3AII100 $ 7.000.00 &IS Remove Exk&* Sw Manhole 2 EA i 1,250.00 $ Z500.00 9.20 hlatall 1&- PVC Sewer 13W LF i 30.13 i 50,6890D 6.21 metal 160 SOON Wyie prK mm iron 12") 7 EA i 25D.DD $1.750AD 6.22 SardMry Bypass 1 LS i lZ50 A0 $12,6aoAo 623 Care and Boat EWaft Ser-Rmy Manhole 4 EA s 1,2%w i 5,000.00 624 Renege BONN 12' MY Sewer Pipe 440 LF $10.0 i 4.40D.00 625 Sanitary 12' Sewer DeOwssd 240 LF i 12.83 i 3.031.20 5.26 Swftq Sewer Fff ps 1 LS $ 3.3M.B6 :9,386.66 627 Rwmw 6t *V 12' Clay Sewer Pipe 1 FA i .750.00 i %7I0A0 828 M ADADWAY Preaurc Test 1 ti' Llna 1 FA i 2.000A0 $2,000.00