Loading...
Contract 2019-55A.17 - COF 06.04.2020DocuSign Envelope ID: C9D358D9-A22A-4945-8253-EB60DEAC1DCD CHANGE ORDER FORM Contract / P.O. Number: 2019-55 Bid Number: RFB 19-051 Change Order Number 17 Change Order Date: July 24, 2020 Project Name: Streetscapes Phase 1 Department: Public Services Job Location: Meet in the Middle Park VENDOR INFORMATION: Company Name: Traverse Group, Inc. Address: P.O. Box 121754 City, St., Zip: Clermont, FL 34712 Contact Name: Alicia Roehn Telephone: 352-409-6630 DESCRIPTION OF CHANGE: Alteration, deviation, addition, or deletion caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary). Railing for steps at Meet in the Middle Park stairs. ITEM AMOUNT A. ORIGINAL CONTRACT VALUE $ $ 4,866,278.23 B. AMOUNT OF THIS CHANGE ORDER: $ $ 10,750.00 Must be within the overall scope of services in accordance with contract specifications. C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A) % 0.221 D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 192,745.00 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D) $ 203,495.00 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 10% Maximum % 4.182 G. NEW CONTRACT VALUE (A+E) $ 5,069,773.23 This Change Order is not valid without the following signatures: �DocuSigned by: DocuSigned by: 7/24/2020 F Sfb" bl(WA,S6101 DEPARTMENT DIRECTOR Date 7/30/2020 Date Fi PUF ECT / ENGINEER s m" 7/28/2020 Date 7/30/2020 RECTOR / CITY MANAGER Date Council approval is required if change order(s): 1) exceeds $49, 999; 2) exceeds the greater of $100, 000 OR 10% of the original contract amount for construction projects; 3) the funds are not available in the approved budget for the department. CITY OF CLERMONT ATTEST: Gail L. Ash, Mayor Date Tracy Ackroyd Howe, City Clerk Date Rev. 3-30-2020 DocuSign Envelope ID: C9D358D9-A22A-4945-8253-EB60DEAC1DCD Unit Price Extended Price $ 10,750.00 7Allowance Fabricate 30' of 2" diameter aluminum pipe two strand railing with 6x4 base plates 1 LS $ 7,800.00 $ 7,800.00 Instal Railing 1 LS $ 1,950.00 $ 1,950.00 for Powder Coating 1 LS $ 1,000.00 $ 1,000.00 $ 10,750.00