Loading...
Contract 2019-55A.22 - COF 09.02.2020DocuSign Envelope ID: CC4A8B69-6BCC-4BOE-8368-E466685F6903 CHANGE ORDER FORM Contract / P.O. Number: 2019-55 Bid Number: RFB 19-051 Change Order Number 22 Change Order Date: Sept. 2, 2020 Project Name: Streetscapes Phase 1 Department: Public Services Job Location: West Ave. and W. Osceola VENDOR INFORMATION: Company Name: Traverse Group, Inc. Address: P.O. Box 121754 City, St., Zip: Clermont, FL 34712 Contact Name: Alicia Roehn Telephone: 352-409-6630 DESCRIPTION OF CHANGE: Alteration, deviation, addition, or deletion caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary). Additive change order to run electrical conduit underground to Victory Pointe. ITEM AMOUNT A. ORIGINAL CONTRACT VALUE $ $ 4,866,278.23 B. AMOUNT OF THIS CHANGE ORDER: $ $ 9,315.00 Must be within the overall scope of services in accordance with contract specifications. C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A) % 0.191 D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 386,537.55 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D) $ 395,852.55 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 10% Maximum % 8.135 G. NEW CONTRACT VALUE (A+E) $ 5,262,130.78 This Chanae Order is not valid without the followina sianatures: ,—DocuSigned by: DocuSigned by: &A-6. 96t,U,la, 9/3/2020 F 9/3/2020 C�AbbTG beTQ:R Date JR&TdARCHITECT/ NBFwddby: Date Sfbn bVWAS6W 9/3/2020 '4"Ald' Sk'" PAWt,ln, 9/8/2020 DE XMIONYDIRECTOR Date PU AX91V&DIRECTOIZ_/dfWUAW6ER Date Council approval is required if change order(s): 1) exceeds $49, 999; 2) exceeds the greater of $100, 000 OR 10% of the original contract amount for construction projects; 3) the funds are not available in the approved budget for the department. CITY OF CLERMONT ATTEST: Gail L. Ash, Mayor Date Tracy Ackroyd Howe, City Clerk Date Rev. 3-30-2020 DocuSign Envelope ID: CC4A8B69-6BCC-4BOE-8368-E466685F6903 General Description QtY. Unit Unit Price Extended Price $ 9,315.00 7.21 2" Conduit Bore 80 LF $ 33.00 $ 2,640.00 15.28 Argentine Bahia Sod 1500 SF $ 0.45 $ 675.00 F & 1 2-2 In. Sch 40 Conduits Per Duke Energy 8.1 Specifications 300 LF $ 20.00 $ 6,000.00 $ 9,315.00