Loading...
Contract 2019-55A.26 - COF 09.02.2020DocuSign Envelope ID: CC4A8B69-6BCC-4BOE-8368-E466685F6903 CHANGE ORDER FORM Contract / P.O. Number: 2019-55 Bid Number: RFB 19-051 Change Order Number 26 Change Order Date: Sept. 2, 2020 Project Name: Streetscapes Phase 1 Department: Public Services Job Location: West Ave. and W. Osceola VENDOR INFORMATION: Company Name: Traverse Group, Inc. Address: P.O. Box 121754 City, St., Zip: Clermont, FL 34712 Contact Name: Alicia Roehn Telephone: 352-409-6630 DESCRIPTION OF CHANGE: Alteration, deviation, addition, or deletion caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary). Deductive change order for credit balances and landscape maintenance. ITEM AMOUNT A. ORIGINAL CONTRACT VALUE $ $ 4,866,278.23 B. AMOUNT OF THIS CHANGE ORDER: $ -$ 23,290.30 Must be within the overall scope of services in accordance with contract specifications. C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A) % -0.479 D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 450,972.55 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D) $ 427,682.25 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 10% Maximum % 8.789 G. NEW CONTRACT VALUE (A+E) $ 5,293,960.48 This Change Order is not valid without the following stures: �DocuSignedby: ocu Igoe y: &A-6. 96t,U,la, 9/3/2020 9/3/2020 C�AbbTG beTQ:R Date WEEGI TeARCHITECT / 6 �dby: Date Sfbn bVWA S6W 9/3/2020 v - - ' ''k" I VAYn & S , �n 9/8/2020 DE I N DIRECTOR Date PURCHASING DIRECTOR / I AGER Date Council approval is required if change order(s): 1) exceeds $49, 999; 2) exceeds the greater of $100, 000 OR 10% of the original contract amount for construction projects; 3) the funds are not available in the approved budget for the department. CITY OF CLERMONT ATTEST: Gail L. Ash, Mayor Date Tracy Ackroyd Howe, City Clerk Date Rev. 3-30-2020 DocuSign Envelope ID: CC4A8B69-6BCC-4BOE-8368-E466685F6903 Unit Price I Extended Price $ (23,290.30) 11.3 CREDIT Midblock at Epic/Lillys 100 SF $ (17.45) $ (1,745.00) 11.3 CREDIT Ladder to Striping 8th St Crosswalk 182 SF $ (17.45) $ (3,175.90) 4.14 CREDIT Grout Fill 8" WM - Partial 1 LS $ (5,000.00) $ (5,000.00) 4.15 CREDIT Grout Fill 2" WM 1 LS $ (4,080.00) $ (4,080.00) CREDIT Blocks (5@$154) Caps (1@$150) 1 LS $ (920.00) $ (920.00) 6.18&6.28 CREDIT Sewer Line Testing Adjustment 1 LS $ (3,000.00) $ (3,000.00) CREDIT Bypass Adjustments 1 LS $ (7,000.00) $ (7,000.00) Temp Trail Bypass at West Ave and Minneola Ave - Constructed with Intersection - $13745.60 2.12 Remove And Dispose Existing Asphalt 560 SF $ 0.85 $ 476.00 2.13 Remove And Dispose Existing Concrete Walkways/Sidewalks 560 SF $ 1.95 $ 1,092.00 2.14 Remove And Dispose Existing Trees 1 EA $ 1,500.00 $ 1,500.00 3.1 12" Stabilized Subgrade 72 SY $ 3.00 $ 216.00 3.11 Excavate For Multi -Purpose Trail 69 CY $ 7.50 $ 517.50 9.3 6" Lime Rock Base For Multi -Purpose Trail And West Avenue 62 SY $ 12.50 $ 775.00 9.6 2" Sp 9.5 Asphaltic Concrete (West Avenue) 62 SY $ 15.95 $ 988.90 10.2 6" Driveway 516 SF $ 10.95 $ 5,650.20 10.6 24" Valley Gutter 26 LF $ 35.00 $ 910.00 10.7 F Curb 45 LF $ 32.00 $ 1,440.00 15.28 Argentine Bahia Sod 400 SF $ 0.45 $ 180.00 15.30 CREDIT Landscape/Potting Soil 1 LS $ (19,500.00) $ (19,500.00) 15.31 Landscape Maintenance -Start 5/31/2020 thru 9/30/2021 1 LS $ 12,385.00 $ 12,385.00 12.10 CREDIT Railing 1 LS $ (5,000.00) $ (5,000.00) $ (23,290.30)