Loading...
2004-21 . . . ENGINEERING PROPOSAUAGREEMENT FOR CITY OF CLERMONT DOWNTOWN DRAINAGE IMPROVEMENTS ENGINEERS: FARNER, BARLEY & ASSOCIATES, INC. 350 North Sinclair Avenue Tavares, Florida 32778 (352) 343-8481 - Phone (352) 343-8495 - Fax CLIENT: CITY OF CLERMONT C/O Tamara Richardson 685 W. Montrose Street Clermont, Florida 34711 (352) 241-7337 - Phone (352) 394-3542 - Fax 1 . . . PROJECT: CLIENT: DATE: DOWNTOWN DRAINAGE IMPROVEMENTS CITY OF CLERMONT April 27, 2004 ENGINEERING/SURVEYING SERVICES PROPOSAUAGREEMENT SCOPE OF SERVICE: Provide engineering and surveying services to design drainage improvements for the southeast corner of Montrose and West Avenue and the alley lying between Montrose and Desoto. east of 8th Street, at the intersection of Desoto and 8th Avenue, and along 8th Street to Center Lake. TASK I ROUTE SURVEY Field locate right-of-way. pavement grades, underground utilities, and existing stormwater structures. Locate existing above ground features such as buildings. sidewalks, and parking areas within the limits as shown on the attached aerial photograph. Fee: $21,575.00 TASK II STORMWATER SYSTEM DESIGN A. Design of a stormwater conveyance system to intercept stormwater runoff on the south side of Montrose Street draining westerly towards West Avenue adjacent to the police station in order to intercept stormwater and drain or convey south into the police station parking lot ultimately through the stormwater pond south of the police station. The drainage design will also consider the sidewalk and driveway grades north of the auto repair shop and landscape island and curb grade for the southeast corner of the intersection of Montrose and West Avenue. B. Design of a stormwater collection and conveyance system to collect stormwater runoff from the alley way lying between Montrose and Desoto conveying stormwater through a proposed easement to Desoto to tie into proposed inlets on Desoto east of 8th Street intersection then southerly along 8th Street to Center Lake and modification of 8th Street and drainage system at 8th Street and Center Lake north of Junata Street. C. Construction plans shall include construction details and specifications. Fee: $6,800.00 TASK III PROJECT ADMINISTRATION The scope of services shall include administrative services necessary to coordinate all aspects of the project through the planning, design and permitting phase. These services shall include project scheduling with all regulatory agencies and public utility companies during the design and permitting phase of the project. Bid documents preparation and bid coordination with site work contractors. Fee: $1,800.00 2 . . . PROJECT: CLIENT: DATE: DOWNTOWN DRAINAGE IMPROVEMENTS CITY OF CLERMONT April 27, 2004 TASK IV CONSTRUCTION ADMINISTRATION All necessary inspections, final certifications and as-builts as required by permit conditions which consist of the following: A. Farner, Barley & Associates. Inc., will advise and consult with Owner and act as its representative during construction. Farner, Barley & Associates, Inc., will make one weekly visit to the site to observe the progress and quality of the executed site work and to determine in general if the work is proceeding in accordance with the construction drawings. Farner, Barley & Associates, Inc., will review and approve shop drawings, results of tests and inspections and other data that the contractor is required to submit. Based upon the on-site observations and a signed and sealed as-built survey provided by the contractor, Farner, Barley & Associates, Inc. shall prepare and submit as-built construction drawings and certifications of completions to the owner and the following State and local agencies as required: 1. City of Clermont Fee: $3,500.00 THIS PROPOSAUAGREEMENT DOES NOT INCLUDE THE FOLLOWING: 1. 2. 3. 4. 5. Environmental Assessment. St. Johns River Water Management District Permit. Application/Permitting Fees. Geotechnical Investigation. Reimbursable expenses (includes mylars, blueprints, copies, mailing. etc.) 3 . . . PROJECT: CLIENT: DATE: DOWNTOWN DRAINAGE IMPROVEMENTS CITY OF CLERMONT April27,2004 SUMMARY FEE SCHEDULE TASK I $ 21,575.00 TASK II $ 6.800.00 TASK III $ 1,800.00 TASK IV $ 3.500.00 I TOTAL Is 33,675.00 I 4 . . . PROJECT: CLIENT: DATE: DOWNTOWN DRAINAGE IMPROVEMENTS CITY OF CLERMONT April 27, 2004 HOURLY RATE SCHEDULE (2004 ) Professional Services outside the scope of contract shall be charged at the following rate schedule: ENGINEERING PROFESSIONAL ENGINEER (PRINCIPAL) $150.00/HOUR PROFESSIONAL ENGINEER $110.00/HOUR PROJECT ENGINEER $105.00/HOUR ENGINEER TECHNICIAN I $90.00/HOUR ENGINEER TECHNICIAN II $70.00/HOUR PLANNER $90.00/HOUR PLANNING TECHNICIAN $70.00/HOUR .--- Cl:An nn/~rh IR 1 :1 INS 1 KIIC: IIC1N SURVEYING PROFESSIONAL SURVEYOR (PRINCIPAL) $125.00/HOUR PROFESSIONAL SURVEYOR $95.00/HOUR 3 MAN FIELD CREW $125.00/HOUR 2 MAN FIELD CREW $110.00/HOUR CREW UTILIZING GLOBAL POSITIONING $150.00/HOUR SYSTEM SURVEY TECHNICIAN I $75.00/HOUR ~IIR\It-y !-'c:HNlîl""f\.11I Ct~~ nn/l-lf)1 IR 5 . . . PROJECT: CLIENT: DATE: DOWNTOWN DRAINAGE IMPROVEMENTS CITY OF CLERMONT April 27, 2004 All printing for this project shall be billed out at the following rate schedule. MYLARS/SEPIA @ COST BLUE PRINTS @ COST COPIES @ COST FAX $1.00/COPY FED EX @ COST CONCRETE MONUMENTS $7.50/EACH REBAR $2.00/EACH MILEAGE (T/M PROJECTS ONLY) $O.30/MILE 6 . . . PROJECT: CLIENT: DATE: II. III. DOWNTOWN DRAINAGE IMPROVEMENTS CITY OF CLERMONT April 27, 2004 GENERAL CONDITIONS A. TERMINATION: The agreement may be terminated by either party upon thirty (30) days written notice. B. REQUEST FOR SERVICE: Any request to replace or repair existing work such as survey control points shall be complied within a reasonable time period of twenty-four (24) hours. C. DOCUMENTS: All original drawings. computations, details, design calculations, and electronic media that result from Farner, Barley & Associates, Inc.. services are the property of Farner, Barley & Associates, Inc. Upon payment if full for services completed. client may at his expense, obtain copies of any documents or reproducible copies of drawings. In doing so. client agrees that no additions. deletions. changes or revisions shall be made to same without the express written approval of Farner, Barley & Associates. Inc. D. RENEGOTIATION: The hourly rates given in this contract are applicable through January 1, 2005, and are subject to renegotiation on January 1. each year, thereafter (contract prices shall remain as quoted). E. REGULATORY REQUIREMENTS: The fees quoted herein are quoted based on all regulations, state and or local that are presently in effect as of this date. If regulations change during the permitting and design phase of this project, Farner. Barley & Associates, Inc.. reserves the right to renegotiate fees for services that may be affected by regulatory changes. F. PERMIT ACQUISITION Farner, Barley & Associates, Inc., cannot guarantee the acquisition of all permits/approvals. However, we will strive toward this end. Client is responsible for payment of all consulting fees due Farner, Barley & Associates. Inc.. regardless of agency/governmental actions. COMPENSATION A. ADDITIONAL SERVICES: Farner, Barley & Associates, Inc., will be compensated for additional services, such as: 1. Changes in scope of services defined in this contract at the client's request. 2. Revisions caused by changes of governmental requirements after the date of this agreement. 7 . . . þ . . . PROJECT: CLIENT: DATE: DOWNTOWN DRAINAGE IMPROVEMENTS CITY OF CLERMONT April27,2004 3. Redesign per client after preliminary design has been submitted to the approving agency. B. OUT-OF-POCKET EXPENSES: In addition to the fee schedule and any additional services, Farner, Barley & Associates, Inc., shall be reimbursed for out-of-pocket expenses for actual cost, such as: blueprints, copies, plots, aerials. express deliveries, specialized postage. and travel outside of the Central Florida area. C. ACCEPTANCE: Billing shall be sent on a bi-monthly basis and each shall reflect the percentage of work completed during the billing period. All invoices shall be paid within fourteen (14) days. All unpaid balances after fourteen (14) days shall be subject to a finance charge of 1.5% interest. Farner, Barley & Associates. Inc., reserves the right to withhold submittal of applications until such time that all unpaid balances have been satisfied. The undersigned will pay all costs and expenses, including a reasonable attorney's fee, incurred or paid by Farner, Barley & Associates, Inc., in the collection of this obligation by suit or otherwise. Farner, Barley & Associates, Inc.. reserves the right to stop work on the above agreed scope of services if any invoice remains unpaid in its entirety for more than 60 days. Any and all outstanding balances shall be paid or brought current before submittal of Final Improvement Drawings and or Final Plat for approval by state and local agencies. Thank you for your time and consideration. THIS PROPO- AU AGREEMENT ACCEPTED THIS ø DAY OF 0 7-ð~ 2004. BY .... .~. TITLE~. BY 'd12- Duane K. Booth, P.E. Director of Engineering. Tavares office Farner. Barley & Associates. Inc. C:\Documents and Settings\amy\My Documents\WordPerfect-9.0lplOposals & P,O.s\CITY OF ClERMONT\Downtown Drainage Imps\Proposal.wpd 8