Loading...
Contract 2020-067A.04DocuSign Envelope ID: 5705EEOA-37F6-4EF6-876D-ED53D4D4DA43 CHANGE ORDER FORM Contract / P.O. Number: 2019-55 Bid Number: RFB 19-051 Change Order Number: 4 Change Order Date: Apr 21, 2021 Project Name: Streetscape Phase 2 Department: Public Services Job Location: Minneola Ave. and Osceola Street VENDOR INFORMATION: Company Name: Traverse Group, Inc. Address: P.O. Box 121754 City, St., Zip: Clermont, FL 34712 Contact Name: Alicia Roehn Telephone:352-409-6630 DESCRIPTION OF CHANGE: Alteration, deviation, addition, or deletion caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary). Additice change order - 7th Street trail ramps & crosswalk; structure D214 18-inch stormdrain; 2-inch water service Minneola Ave. STA 11+00. ITEM AMOUNT A. `ORIGINAL CONTRACT VALUE: $ 4,310,565.37 B. AMOUNT OF THIS CHANGE ORDER: $ 12,307.41 Must be within the overall scope of services in accordance with contract specifications. C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): % 0.3% D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 56,794.62 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $ 69,102.03 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 10% Maximum % 1.6% G. NEW CONTRACT VALUE (A+E) $ 4,379,667.40 This Change Order is not valid without the following signatures: �— DocuSigned by: DocuSigned by: M6& �Ot _ 4/23/2021 L 4/23/2021 sDae�.- CONTRACTOR Date PROJECT ARCHITECT / ENGINEER Date DocuSigned by: Docuftned by: Sl bVWA Sbin, 4/26/2021 4UMI S 4/26/2021 DEPARTMENT DIRECTOR Date PROCUREMENT DIRECTOR / Date CITY MANAGER Council approval is required if change order(s): 1) exceeds $49,999; 2) exceeds the greater of $100,000 OR 10% of the original contract amount for construction projects; 3) the funds are not available in the approved budget for the department. CITY OF CLERMONT NOT REQUIRED ATTEST: MAYOR Date CITY CLERK Date Rev.1-1-2021 DocuSign Envelope ID: 5705EEOA-37F64EF6-876D-ED53D4D4DA43 Un1t Price Extended Price 7th Street Trail Ramps and Crosswalk 1.6 Asbuilts 1 LS $ 50.00 $ 50.00 2.7 Remove and Dispose of Existing Curb 50 LF $ 10.00 $ 500.00 2.13 Remove and Dispose of Existing Concrete 225 SF $ 1.95 $ 438.75 3.5 Curb Grading 10 SY $ 5.00 $ 50.00 3.6 Sidewalk/Driveway Grading 34 SY $ 4.00 $ 136.00 10.2 6" Concrete 304 SF $ 10.95 $ 3,328.80 10.6 24" Valley Gutter 30 LF $ 35.00 $ 1,050.00 10.9 Handicap Ramp Curbs 36 LF $ 27.00 $ 972.00 1.2 Payment and Performance Bond - Increase due to bonding 1 LS $65.26 $ 65.26 TOTAL $ 6,590.81 Structure D-21418" Stormdrain Subout $1,626.10 1.6 Asbuilts 1 LS $ 50.00 $ 50.00 5.13 18" RCP 32 LF $ 42.50 $ 1,360.00 5.41 Brick Plug 18" Stubout 1 EA $200.00 $ 200.00 1.2 Payment and Performance Bond - Increase due to bonding 1 LS $16.10 $ 16.10 TOTAL $1.626.10 2" Water Service Minneola Ave STA 11+00 $ 4,090.50 1.6 Asbuilts 1 LS $ 50.00 $ 50.00 4.3 Remove Existing Water Service 80 LF $ 10.00 $ 800.00 4.4 New Water Service 80 LF $ 20.00 $ 1,600.00 4.17 2" Poly Water Service 90 LF $ 10.00 $ 900.00 7.20 4" Bore 20 LF $ 35.00 $ 700.00 1.2 Payment and Performance Bond - Increase due to bonding charge(s) by Bonding Comp an ( 1 %) 1 LS $40.50 $ 40.50 TOTAL $ 4,090.50 CHANGE ORDER TOTAL $ 12,307.41