Contract 2022-020ADocuSign Envelope ID: 8D6F2A1 E-8AF8-412B-95FF-49EODEA9FF6F #2022-020A THIRD AMENDMENT TO AGREEMENT BETWEEN THE CITY OF CLERMONT AND TRAVERSE GROUP, INC. This Addendum is to that certain agreement of August 13, 2019, No. 2019-55, (the Agreement) between the CITY OF CLERMONT, FLORIDA, hereinafter referred to as "CITY" and TRAVERSE GROUP, INC., hereinafter referred to as "CONTRACTOR". WHEREAS, the parties entered into the Agreement as part of the City's Streetscape Project as set forth in RFB 19-051; WHEREAS, the Streetscape project was designed to be completed in three phases as set forth in the project plans; WHEREAS, Contractor has satisfactorily completed Phase II of the Streetscape project and is willing, able, and mobilized to timely complete Phase III of the project; and WHEREAS, it is in the best interest of the City of Clermont and the efficient and cost effective completion of the Streetscape project, for the parties to expand the Scope of Work as set forth in the Agreement. NOW THEREFORE, the parties hereto, in and for the consideration as hereinafter set forth in this Third Amendment and in the Agreement, do hereby agree and covenant as follows: 1. The above -stated recitals are hereby incorporated and made a part of this Third Amendment. 2. This Amendment expressly modifies the Agreement and in the event of a conflict, the terms and conditions of this Amendment shall prevail. 3. The terms of the Agreement and specifically the Scope of Work and compensation shall be expanded to include the services to be provided as more particularly described in Exhibit "A", attached hereto and incorporated herein. Contractor shall not be authorized to proceed until such time as a Notice to Proceed has been issued by the City. The Scope of Work shall be completed by the date set forth in the Notice to Proceed. 4. All other terms and conditions set forth in the Agreement shall remain in full force and effect and unchanged as agreed to by the parties. DocuSign Envelope ID: 8D6F2A1 E-8AF8-412B-95FF-49EODEA9FF6F IN WITNESS WHEREOF, the parties hereto have executed this Amendment as of the dates set forth below. CITY OF CLERMONT DocuSigned by: 2BA7692F758C492... DS Tim Murry, Mayor ATTEST: EDocuSigned by: t cy plot D7F34905B344A... Tracy Ackroyd Howe, TRAVERSE GROUP, INC. DocuSigned by: Q�iGia I°o� 396EE3AC046D48F_. By: (Signature) Print Name: Alicia Roehn Title: Corporate Secretary Date: 3/9/2022 2 DocuSign Envelope ID: 8D6F2A1E-8AF8-412B-95FF-49EODEA9FF6F Escalation Clause. In the event of significant delay or price increase of material, equipment, fuel or energy occurring during the performance of the contract through no fault of the Contractor, the Contract Sum, time of completion or contract requirements shall be equitably adjusted by Change Order in accordance with the procedures of previous Change Orders and Contract Documents. A change in price of an item of material, equipment, fuel or energy will be considered significant when the price of an item increases 5% between the date of the contract and the date of installation. Unit Price Extended Price 100 - GENERAL $ 746,025.00 1.1 Mobilization / Demobilization 1 LS $ 250,000.00 1.2 Payment and Performance Bond 1 LS $ 169,412.00 1.3 Maintenance Bond 1 LS $ 15,500.00 1.4 Silt Fence / Fence screening 2000 LF $ 2.50 $ 5,000.00 1.5 Tree Protection 1 LS $ 2,500.00 $ 2,500.00 1.6 As Built Drawings 1 LS $ 19,500.00 1.7 Building Permitting / Electric 1 LS $ 3,500.00 1.8 Temporary Construction Fencing 1 LS $ 27,750.00 1.10 MOT / Traffic Control 1 LS $ 149,913.00 1.11 Survey (Stake) Layout 1 LS $ 59,950.00 1.12 Testing - Density 1 LS $ 39,500.00 1.14 Pre Construction Video I 1 I LS $ 3,500.00 $ 3,500.00 200 - DEMOLITION / CLEARING AND GRUBBING $ 983,307.00 2.1 NPDES (including submittal of monthly reports) 1 LS $ 8,995.00 2.2 Silt Fence (incl. continuous maintenance) 1000 LF $ 2.70 $ 2,700.00 2.3 Filter Fabric Inlet Protection 30 EA $ 135.00 $ 4,050.00 2•4 Gravel Drive At Construction Yard Entrance (Incl. Refresh Every Two Months) 50 SY $ 135.00 $ 6,750.00 2.6 Remove And Dispose Existing Pavers 6797 SF $ 4.95 $ 33,645.15 2.7 Remove And Dispose Existing Curb 3900 LF $ 13.25 $ 51,675.00 2.10 Remove and Dispose Existing Header Curb 350 LF $ 8.50 $ 2,975.00 2.11 Remove And Dispose Existing Asphalt 60881 SF $ 1.55 $ 94,365.55 2.12 Remove And Dispose Existing Concrete Driveways 3140 SF $ 5.50 $ 17,270.00 2.13 Remove And Dispose Existing Concrete Walkways/Sidewalks 28495 SF $ 4.55 $ 129,652.25 2.14 Remove And Dispose Existing Trees 21 EA $ 1,995.00 $ 41,895.00 2.15 Remove and relocate Existing Bollards (Artwalk) 1 LS $ 3,000.00 $ 3,000.00 DocuSign Envelope ID: 8D6F2A1E-8AF8-412B-95FF-49EODEA9FF6F 2.16 Remove and Dispose Existing Steps & Landings 200 SF $ 12.00 $ 2,400.00 2.17 Remove And Dispose Existing Light Pole Bases 47 EA $ 313.00 $ 14,711.00 2.18 Saw Cut Existing Asphalt 500 LF $ 2.75 $ 1,375.00 2.19 Saw Cut Existing Concrete -Double Cut Along Bilin 5000 LF $ 8.95 $ 44,750.00 2.21 Remove Sidewalk Pavers 2558 SF $ 5.00 $ 12,790.00 2.22 Remove / Deliver Site Furnishings 1 LS $ 6,500.00 $ 6,500.00 2.23 Remove & Return Existing Street Signage to City 1 LS $ 2,950.00 $ 2,950.00 2.24 Strip Existing Sod / Landscape Areas 14400 SF $ 0.55 $ 7,920.00 2.25 Roll Off Dumpster / Dump Fees 35 EA $ 750.00 $ 26,250.00 2.26 Remove Existing Concrete Road Base 65781 SF $ 6.05 $ 397,975.05 2.27 Mini Mill Joints 6 EA $ 795.00 $ 4,770.00 2.30 Remove Existing Roof Drains 11 EA $ 3,313.00 $ 36,443.00 2.31 Relocate Mail Boxes 10 EA $ 300.00 $ 3,000.00 2.32 Remove Concrete Intersections 4900 SF $ 5.00 $ 24,500.00 300 - EARTHWORK AND GRADING $ 265,225.11 3.1 12" Stabilized Subgrade 8193 SY $ 3.90 $ 31,952.70 3.3 Roadway Grading 7736 SY $ 2.95 $ 22,821.20 3.4 Asphalt Trail Grading 457 SY $ 6.00 $ 2,742.00 3.5 Curb Grading 4500 SY $ 6.30 $ 28,350.00 3.6 Sidewalk/Driveway Grading 3515 SY $ 5.35 $ 18,805.25 3.7 Landscape Area Grading 3500 SY $ 2.25 $ 7,875.00 3.10 Excavate For Roadway 8059 CY $ 7.69 $ 61,973.71 3.11 Excavate For Multi -Purpose Trail 275 CY $ 7.69 $ 2,114.75 3.12 Excavate For Crosswalks 50 CY $ 15.00 $ 750.00 3.17 Removal / Disposal Of Excess Fill Material 7590 TCY $ 7.95 $ 60,340.50 3.18 Final Dressing And Finish Grading 1 LS $ 27,500.00 400 - WATER SUPPLY $ 702,455.00 4.2 Remove And Install Water Meter And Box & Connect To Existing Service (Connections) 61 EA $ 995.00 $ 60,695.00 4.3 Remove Existing Water Service 2500 LF $ 12.50 $ 31,250.00 4.4 New Water Service 1900 LF $ 22.00 $ 41,800.00 4.7 Remove and Replace Fire Hydrant & Valve 5 EA $ 4,750.00 $ 23,750.00 DocuSign Envelope ID: 8D6F2A1E-8AF8-412B-95FF-49EODEA9FF6F 4.10 Adjust Water Valve Boxes To Grade 61 EA $ 150.00 $ 9,150.00 4.18 Connect 2" Poly Water Service To Existing Services Or Meter 2 EA $ 1,995.00 $ 3,990.00 4.24 10" PVC C900 Water Main 2200 LF $ 69.93 $ 153,846.00 4.25 10" Gate Valve 24 EA $ 2,950.00 $ 70,800.00 4.26 10" Cap 4 EA $ 400.00 $ 1,600.00 4.27 Potholing / Soft Digs 1 LS $ 35,000.00 $ 35,000.00 4.28 Pressure Testing 8 EA $ 937.50 $ 7,500.00 4.29 Bacteriological Testing 8 EA $ 687.50 $ 5,500.00 4.31 8x8 wet tap 2 EA $ 9,939.00 $ 19,878.00 4.32 8" Sleeve 2 EA $ 650.00 $ 1,300.00 4.33 8x10 Reducer 4 EA $ 350.00 $ 1,400.00 4.34 8" Line Stop 2 EA $ 11,500.00 $ 23,000.00 4.35 10x2-1 Taps 61 EA $ 150.00 $ 9,150.00 4.38 8" DIP Mega Lug Kit 19 EA $ 110.00 $ 2,090.00 4.39 10" Fittings (45 Bend, Sleeve) 19 EA $ 755.00 $ 14,345.00 4.41 10" DIP Joint Restraint 75 EA $ 400.00 $ 30,000.00 4.42 10" Mega lugs 123 EA $ 157.00 $ 19,311.00 4.43 2" Poly 1900 LF $ 17.50 $ 33,250.00 4.45 Remove/ Abandon existing water main 1800 LF $ 20.00 $ 36,000.00 4.47 10x4 Tee for BF 1 EA $ 600.00 $ 600.00 4.49 2" Jumper Assem 6 EA $ 2,750.00 $ 16,500.00 4.50 3" Long Side Chase 2300 LF $ 15.00 $ 34,500.00 4.51 Tie In existing 5 EA $ 2,200.00 $ 11,000.00 4.52 ARV Complete (above ground) 1 EA $ 5,250.00 $ 5,250.00 500 - STORM DRAINAGE $ 624,440.43 5.1 Remove Existing Inlet 10 EA $ 1,750.00 $ 17,500.00 5.2 Remove Existing Manholes 8 EA $ 1,750.00 $ 14,000.00 5.5 Remove Existing 12" RCP 340 LF $ 21.00 $ 7,140.00 5.6 Remove Existing 15" RCP 10 LF $ 25.00 $ 250.00 5.7 Remove Existing 18" RCP 762 LF $ 30.00 $ 22,860.00 5.13 18" RCP 1875 LF $ 59.95 $ 112,406.25 5.15 12" Neoplast Drain Basin With Standard Grate 1 EA $ 950.00 $ 950.00 5.16 FDOT Type 9 Inlet 9 EA $ 4,995.00 $ 44,955.00 DocuSign Envelope ID: 8D6F2A1E-8AF8-412B-95FF-49EODEA9FF6F 5.17 Storm Drainage Manholes EA $ 4,665.00 5 $ 23,325.00 5.18 Construct Modified YPE 6 Inlets EA $ 4,995.00 8 $ 39,960.00 5.20 Construct USF 5112 VG Inlet Frame & 6143 Grate 24 EA $ 4,350.00 $ 104,400.00 5.20.1 Double 5112 inlet top 23 EA $ 1,950.00 $ 44,850.00 5.25 Construct Doghouse Manhole Over Existing 15" RCP 2 EA $ 6,750.00 $ 13,500.00 W/ Modified Type 6 Inlet 5.30 Adjust Existing Manholes To Grade EA $ 1,645.00 2 $ 3,290.00 5.32 Core Existing MH 1 EA $ 4,500.00 $ 4,500.00 5.34 Tie In Existing MH & Inlet 1 EA $ 950.00 $ 950.00 5.40 24" RCP LF $ 83.96 633 $ 53,146.68 5.41 Brick Plug 18" Stubout EA $ 950.00 2 $ 1,900.00 5.45 12" SDR 26 Side and Roof Drains LF $ 55.00 112 $ 6,160.00 5.46 10" SDR 26 Side and Roof Drains LF $ 50.00 84 $ 4,200.00 5.47 SDR 26 Side and Roof Drains LF $ 47.50 �8" 381 $ 18,097.50 5.48 6" SDR 26 Side and Roof Drains LF $ 40.00 200 $ 8,000.00 5.49 6" Clean Outs EA $ 500.00 21 $ 10,500.00 5.50 4" Clean Outs EA $ 450.00 15 $ 6,750.00 5.51 Connect to Existing Storm and Roof Systems EA $ 1,950.00 21 $ 40,950.00 5.52 Storm and Roof Drain Fittings LS $ 15,000.00 1 $ 15,000.00 5.53 15" SDR 26 Storm Drain 100 LF $ 49.00 $ 4,900.00 600 - SANITARY SEWER $ 119,663.73 6.35 10" C900 Force Main Remove and Replace 100 LF $ 95.00 $ 9,500.00 6.36 10" Hymax Adapter Connection 2 EA $ 11250.00 $ 2,500.00 6.37 Install Sanitary Conflict Manhole on Trail 1 LS $ 83,913.73 $ 83,913.73 6.38 6" SDR 26 Sewer Service Complete (7th Street) 5 EA $ 4,750.00 $ 23,750.00 700 - STREET LIGHTING / ELECTRICAL $ 1,156,596.97 7.1 Remove Existing Street Light Poles And Circuitry 47 EA $ 500.00 $ 23,500.00 7.2 Remove Existing Conduit And Wire 1 LS $ 12,728.00 DocuSign Envelope ID: 8D6F2A1E-8AF8-412B-95FF-49EODEA9FF6F 7.3 F&I TYPE "A" Fixture (Led, Acorn Light Fixture W/ TYPE I'i Dist, On 12'-0" Alum, Fluted Pole With GFI 40 $ 8,768.50 $ 350,740.00 7.4.1 F&I TYPE "B" Fixture 3 qEA $ 8,768.50 $ 26,305.50 7 4 2 F&I TYPE "C" Fixture 4 $ 9,500.00 $ 38,000.00 7.5 F & I Pole Bases With Anchor Bolts For Sternberg 47 EA $ 2,650.00 $ 124,550.00 7.6 F & I Pull Boxes (13"X24"X18") 8 EA $ 995.00 $ 7,960.00 7.7 F & I Pull Boxes (12"X12"X12") 29 EA $ 775.00 $ 22,475.00 7.8 F & I Fiber Pull Boxes EA $ - $ 7.9 F & I Pole Mounted GFCI Receptacle 43 EA $ 200.00 $ 8,600.00 7.10 F & I In -Grade Weather Proof Power Box Per Det 28 EA $ 2,037.75 $ 57,057.00 7.11 F & I In -Grade Weather Proof Event Power Box Per 16 EA $ 2,319.20 $ 37,107.20 D t E1.2 & I Electrical Service Rack & Panel for Panel Ph 7.12 IF 31 1 EA $ 21,995.13 $ 21,995.13 F & I Electrical Service Rack & Panel for Panel Ph 7.13 3.2 1 EA $ 23,913.73 $ 23,913.73 Irrigation/Electrical Service/Time Clock Hook Up 7.14 1 LS $ 19,950.00 F & I Conduit And Wire For A Complete Working 7.15 System 1 LS $ 273,032.41 F&I Tree Pedestal Recepticals 7.22 31 EA $ 913.00 $ 28,303.00 F&I GFCI Device Pedestals 7.23 10 EA $ 913.00 $ 9,130.00 Duke Conduit Bore (7th) 7.20 �4" 250 LF $ 55.00 $ 13,750.00 2" Duke Conduit Bore (7th) 7.21 500 LF $ 45.00 $ 22,500.00 6" Duke Conduit Bore (7th) 7.22 500 LF $ 70.00 $ 35,000.00 800 - CONDUIT, FRANCHISE UTILITY, AND FIBER OPTIC IMPROVEMENTS $ 623,160.00 F & 1 2-2 In. Sch 40 Conduits Per Clermont 8.1 2100 LF $ 25.00 $ 52,500.00 F & 1 1-2 In. Sch 40 Conduits 8.2 6650 LF $ 20.00 $ 133,000.00 F & 1 2-1 In. Sch 40 Conduits 8.3 7300 LF $ 25.00 $ 182,500.00 F & 1 1-4 In. Sch 40 Conduits Per Duke Energy 8.4 Specifications LF $ 30.00 $ - F & 1 1-6 In. Sch 40 Conduits Per Duke Energy 8.5 Specifications LF $ 35.00 $ - F&I 2-2 In. HDPE Conduits Per City Specs 8.6 3600 LF $ 25.00 $ 90,000.00 Connect 2-2 In. HDPE Conduits To Existing Hand 8.7 Holes EA $ 500.00 $ - DocuSign Envelope ID: 8D6F2A1E-8AF8-412B-95FF-49EODEA9FF6F Connect 2-2 In. HDPE Conduits To Existing Conduit 8.8 EA $ 600.00 $ - 8.9 F & 12 In. HDPE Conduits Per City Specifications LF $ 25.00 $ - Connect 2 In. HDPE Conduits To Existing Hand Holes 8.10 EA $ 300.00 $ - 8.11 Adjust Existing Cable Boxes To Grade EA $ 250.00 $ - 8.12 Relocate Existing Telecommunication Junction Box EA $ 250.00 $ - 8.13 Adjust Existing Utility Box To Grade EA $ 250.00 $ - 8.14 Relocate Existing Electrical Transformer Box EA $ 2,500.00 $ - 8.15 Adjust Foc Box To Grade EA $ 400.00 $ - 8.16 F & I Fiber Optic Conduit And Tracer Wire LF $ 18.00 $ - 8.17 F & 11.5" Conduit LF 3105 $ 25.00 $ 77,625.00 8.18 F & 1 1.25" Conduit LF 2935 $ 25.00 $ 73,375.00 8.22 1" Conduit Sweeps EA 250 $ 17.00 $ 4,250.00 8.22 1.25" Conduit Sweeps EA 40 $ 20.00 $ 800.00 8.22 1.5" Conduit Sweeps EA 30 $ 22.00 $ 660.00 8.22 2" Conduit Sweeps EA 70 $ 25.00 $ 1,750.00 8.22 3" Conduit Sweeps EA 4 $ 75.00 $ 300.00 8.22 4" Conduit Sweeps EA 4 $ 300.00 $ 1,200.00 8.23 6" Galn 36" Sweeps EA 8 $ 650.00 $ 5,200.00 900 - ROADWAY/PARKING AREAS/MULTI-PURPOSE TRAIL/CURB $ 278,366.81 oTION 9.1 Mirafi 140n Geotextile Fabric For Paver Roadway 69624 SF $ 0.79 $ 55,002.96 9.2 6" Recycled Concrete For Paver Roadway 7736 SY $ 19.95 $ 154,333.20 6" Lime Rock Base For Multi -Purpose Trail And West 9•3 Avenue and Driveway 426 SY $ 16.65 $ 7,092.90 9.4 12" Recycled Concrete for Cross walk SY $ 24.95 640 $ 15,968.00 1.5" Sp 9.5 Structural Asphalt (Multi -Use Trail) 9.5 395 SY $ 15.65 $ 6,181.75 1" Sp 9.5 Asphalt Base Course 9.6 1120 SY $ 9.95 $ 11,144.00 DocuSign Envelope ID: 8D6F2A1E-8AF8-412B-95FF-49EODEA9FF6F 1" Sp 9.5 Asphalt Overlay 9.6.1 1120 SY $ 7.95 $ 8,904.00 Tack 9.7 1120 SY $ 2.00 $ 2,240.00 Temp Road Patch/Tie ins 9.7A 1 LS $ 17,500.00 $ 17,500.00 1000 - SIDEWALK/CONCRETE CURB CONSTRUCTION $ 849,183.87 10.1 4" Concrete Sidewalk SF $ 8.89 35113 $ 312,154.57 10.2 6" Driveway SF $ 13.95 7555 $ 105,392.25 10.5 6" Handicap Ramps SF $ 21.95 1100 $ 24,145.00 10.6 24" Valley Gutter LF $ 37.50 2495 $ 93,562.50 10.7 F Curb LF $ 36.75 1599 $ 58,763.25 10.8 12" Ribbon Curb LF $ 37.50 1291 $ 48,412.50 10.9 Handicap Ramp Curbs LF $ 33.00 320 $ 10,560.00 10.14 Curb Transitions 100 LF $ 39.00 $ 3,900.00 10.15 Type D Curb 3626 LF $ 37.55 $ 136,156.30 10.16 Remove and Replace Sidewalk (7TH) DUKE 2250 SF $ 24.95 $ 56,137.50 1100 - BRICK PAVERS - INSTALLATION (City prepurchased pavers) $ 376,410.72 11.1 F & 12 1/4" Truncated Dome Mats 700 SF $ 29.79 $ 20,853.00 11.2 Install 2 1/4" Roadway Brick Pavers - K&W Red 2 69232 SF $ 3.96 $ 274,158.72 1/4"X4"X8" - Manuf. By Glen-Gery Corporation 11.3 F & 12 3/4" Crosswalk Brick Pavers 747 SF $ 17.00 $ 12,699.00 11.5 F & 1 6" X 6" White Roadway Brick Pavers SF $ 37.50 160 $ 6,000.00 11.10 24" White Brick Stop Bar SF $ 33.00 1900 $ 62,700.00 1200 - VERTICAL ELEMENTS/SITE WALLS/STAIRS/RAMPS $ 44,700.00 12.1 F & I Ramp/Stairs Railing (Allowance) LF $ 450.00 Thickened Edge Concrete for Trail @ NW Corner Of 12.5 7th And Montrose 60 LF $ 250.00 $ 15,000.00 FDOT Aluim Railing (Black coated) 12.5 60 LF $ 495.00 $ 29,700.00 1300 - FURNISHINGS AND MISCELLANEOUS $ 29,925.00 13.5 Concrete Bench Pads 15 EA $ 1,995.00 1 $ 29,925.00 1400 - PAVEMENT MARKINGS AND SIGNAGE (ALLAW,4NEE) $ 63,500.00 DocuSign Envelope ID: 8D6F2A1E-8AF8-412B-95FF-49EODEA9FF6F 14.1 Thermoplastic Striping 1 LS $ 8,500.00 14.2 Signage Package 1 LS $ 55,000.00 1500 - LANDSCAPING $ 169,840.04 15.1 Lily Of The Nile, #1; Full;3-4 PPP Min; 18" O.C. 327 $ 12.00 $ 3,924.00 15.2 African Iris, White, #3; Full; 5-6 PPP Min; 3' O.C. 36 qEA $ 9.95 $ 358.20 15.4 Crinum Lily, Red, #15; 4'OA (In Lieu of Cirnum #15) 2$ 165.00 $ 330.00 15.5 Crinum Lily, Red, #7; 3' OA (In Lieu of Cirnum Lily #7 4 EA $ 82.50 $ 330.00 15.6 Crape Myrtle, Cont. B&B, 9'+Ht X 4-5' Spr; 5' Ct Multi- Trunk (In Lieu of Crape Myrtle Standards Trunk) 3 EA $ 331.20 $ 993.60 15.7 Dwarf Confederate Jasmine, #1, Full; 15"+ Runner's 5-7 Runners Mina 12" OC 140 EA $ 8.20 $ 1,148.00 15.8 Dwarf Yaupon Holly #3 41 EA $ 12.55 $ 514.55 15.9 Dwarf Nandina #3 ; full 15" + spr 2' oc 74 EA $ 85.00 $ 6,290.00 15.10 European Fan Palm 3 EA $ 1,750.00 $ 5,250.00 15.11 Emerald Goddess Liriope, #1; Full; 5-7 PPP Min; 12" OC Or As Noted (In Lieu of Society Garlic) 487 EA $ 9.95 $ 4,845.65 15.13 Heavenly Bamboo 15 EA $ 95.00 $ 1,425.00 15.16 Pringle Dwarf Japanese Yew 25 EA $ 35.00 $ 875.00 15.17 Live Oak, Cont. B&B; 14-16'ht X 7-9'spr; 4" Cal. Min. 6 EA $ 1,750.00 $ 10,500.00 15.20 Sabal Palm, B.R.; Root Enhanced, See Plan For CT Heights (In Lieu of Wild Date Palm) 30 EA $ 900.00 $ 27,000.00 15.27 Pine Straw Mulch 3" Depth 1 LS $ 6,500.00 15.28 Argentine Bahia Sod 10000 SF S 0.45 $ 4,500.00 15.31 1 Year Landscape Maintenance - Includes ongoing maintenance from the start of landscaping, and 1 year beyond the substantial completion date 1 EA $ 55,950.00 $ 55,950.00 15.32 Varigated Dwarf Schefflera #3 18-24" ht 14-18" 30" oc (In Lieu of Indian Hawthorn White) 170 EA S 65.65 $ 11,160.50 15.35 Azalea, Salmon "Fashion", #3 34 EA S 21.79 $ 740.86 15.36 Azalea, White, "GG", #3 12 EA S 21.79 $ 261.48 15.41 Coontie 18" 80 EA $ 93.04 $ 7,443.20 15.42 Pine Bark Mulch 3" Depth 1 - LS $ 19,500.00 1600 - IRRIGATION $ 177,450.00 16.1 Irrigation System Complete (Including But Not Limited To) 1 LS $ 169,950.00 DocuSign Envelope ID: 8D6F2A1E-8AF8-412B-95FF-49EODEA9FF6F BLOCK AT A TIME, INCLUDING INTERSECTIONS CITY/OTHERS TO LOCATION ALL IRRIGATION POINTS OF SERVICE ROADWAY BRICK PAVERS WERE PRE -PURCHASED BY THE CITY OF CLERMONT ANY FEES FOR DUKE AND DUKE SUBCONTRACTORS WILL BE RESPONSIBILITY OF THE CITY ALL STREET SIGNAGE BY OTHERS EXCLUDING MOT IT IS TRAVERSE'S INTENTION TO REMOVE SIDEWALKS IN FRONT OF BUSINESS AND FORM NEW SIDEWALKS ONE ONE DAY AND POUR SAID SIDEWALKS THE FOLLOWING DAY OR TWO, IN MULTIPLE AREAS. WE WILL DO OUR BEST TO NOT INTERFERE WITH BUSINESS BUT AT TIMES THAT MAY BE INEVITABLE. IT IS THE CITYS RESPONSIBILTY TO NOTIFY BUSINESSES DocuSign Envelope ID: 8D6F2A1 E-8AF8-412B-95FF-49EODEA9FF6F iQ_ ' ft�hw -I- DETAILS DOWNTOWN STREETSCAPE PHASE 3 West Montrose Street — West Avenue to Lake Avenue • Installing 10-inch water main pipes • Installing 18 to 24-inch storm water pipes • Installing 1 and 2-inch electrical conduit for street lighting and event power • Installing brick pavers • Increasing on -street parking • Resurfacing 7th Street and extending trail to West Montrose Street • Replacing sidewalk, curbs and driveways • Relocating overhead power on 71h Street to underground service by Duke Energy x WORK NOTES • Monday— Friday, 7 a.m. to 5 p.m. • Saturday work maybe necessary and will require City approval. RL,i OVERVIEW The project includes removing existing asphalt, sidewalk, curb, driveways and landscape to install underground pipes for utility upgrades and add brick pavers. Improvements to parking, electricity, lighting and landscape will also be completed as part of the Master Plan for Clermont's Downtown -Waterfront District. w a V3 f SECTION SCHEDULE * WORK TO BEGIN 3/21/22, SECTION 1 Section 1- 7th Street (8 wrcKs) Section 2 - 7th Street to City Hall (5 weeks) Section 3 - City Hall to Lake Street (8 weeks) Section 4 - intersection with Lake Street (4 weeks) Section 5 -West Avenue to old PD (5 weeks) Section 6 — Old PD to 8th Street (4 weeks) Section 7 - 8th Street to mid -block (8 weeks) Section 8 - Mid -block to 7th Street (6 weeks) Section 9 - 7th Street intersection (4 weeks) *This proposed construction schedule could be impacted by weather, materials acquisition delays or other unforeseen conditions. A # e; L • A �.