Contract 2022-020ADocuSign Envelope ID: 8D6F2A1 E-8AF8-412B-95FF-49EODEA9FF6F
#2022-020A
THIRD AMENDMENT TO AGREEMENT BETWEEN
THE CITY OF CLERMONT AND TRAVERSE GROUP, INC.
This Addendum is to that certain agreement of August 13, 2019, No. 2019-55, (the
Agreement) between the CITY OF CLERMONT, FLORIDA, hereinafter referred to as "CITY"
and TRAVERSE GROUP, INC., hereinafter referred to as "CONTRACTOR".
WHEREAS, the parties entered into the Agreement as part of the City's Streetscape Project
as set forth in RFB 19-051;
WHEREAS, the Streetscape project was designed to be completed in three phases as set
forth in the project plans;
WHEREAS, Contractor has satisfactorily completed Phase II of the Streetscape project and
is willing, able, and mobilized to timely complete Phase III of the project; and
WHEREAS, it is in the best interest of the City of Clermont and the efficient and cost
effective completion of the Streetscape project, for the parties to expand the Scope of Work as set
forth in the Agreement.
NOW THEREFORE, the parties hereto, in and for the consideration as hereinafter set forth
in this Third Amendment and in the Agreement, do hereby agree and covenant as follows:
1. The above -stated recitals are hereby incorporated and made a part of this Third
Amendment.
2. This Amendment expressly modifies the Agreement and in the event of a conflict,
the terms and conditions of this Amendment shall prevail.
3. The terms of the Agreement and specifically the Scope of Work and compensation
shall be expanded to include the services to be provided as more particularly described in Exhibit
"A", attached hereto and incorporated herein. Contractor shall not be authorized to proceed until
such time as a Notice to Proceed has been issued by the City. The Scope of Work shall be
completed by the date set forth in the Notice to Proceed.
4. All other terms and conditions set forth in the Agreement shall remain in full force
and effect and unchanged as agreed to by the parties.
DocuSign Envelope ID: 8D6F2A1 E-8AF8-412B-95FF-49EODEA9FF6F
IN WITNESS WHEREOF, the parties hereto have executed this Amendment as of the
dates set forth below.
CITY OF CLERMONT
DocuSigned by:
2BA7692F758C492... DS
Tim Murry, Mayor
ATTEST:
EDocuSigned by:
t
cy plot
D7F34905B344A...
Tracy Ackroyd Howe,
TRAVERSE GROUP, INC.
DocuSigned by:
Q�iGia I°o�
396EE3AC046D48F_.
By:
(Signature)
Print Name: Alicia Roehn
Title: Corporate Secretary
Date: 3/9/2022
2
DocuSign Envelope ID: 8D6F2A1E-8AF8-412B-95FF-49EODEA9FF6F
Escalation Clause. In the event of significant delay or price increase of material, equipment, fuel or energy occurring
during the performance of the contract through no fault of the Contractor, the Contract Sum, time of completion or
contract requirements shall be equitably adjusted by Change Order in accordance with the procedures of previous
Change Orders and Contract Documents. A change in price of an item of material, equipment, fuel or energy will be
considered significant when the price of an item increases 5% between the date of the contract and the date of
installation.
Unit Price
Extended Price
100 - GENERAL $ 746,025.00
1.1
Mobilization / Demobilization
1
LS
$ 250,000.00
1.2
Payment and Performance Bond
1
LS
$ 169,412.00
1.3
Maintenance Bond
1
LS
$ 15,500.00
1.4
Silt Fence / Fence screening
2000
LF
$ 2.50 $ 5,000.00
1.5
Tree Protection
1
LS $ 2,500.00 $ 2,500.00
1.6
As Built Drawings
1
LS
$ 19,500.00
1.7
Building Permitting / Electric
1
LS
$ 3,500.00
1.8
Temporary Construction Fencing
1
LS
$ 27,750.00
1.10
MOT / Traffic Control
1
LS
$ 149,913.00
1.11
Survey (Stake) Layout
1
LS
$ 59,950.00
1.12
Testing - Density
1
LS
$ 39,500.00
1.14
Pre Construction Video
I 1
I LS
$ 3,500.00 $ 3,500.00
200 - DEMOLITION / CLEARING AND GRUBBING $ 983,307.00
2.1
NPDES (including submittal of monthly reports)
1
LS
$ 8,995.00
2.2
Silt Fence (incl. continuous maintenance)
1000
LF
$ 2.70
$ 2,700.00
2.3
Filter Fabric Inlet Protection
30
EA
$ 135.00
$ 4,050.00
2•4
Gravel Drive At Construction Yard Entrance (Incl.
Refresh Every Two Months)
50
SY
$ 135.00
$ 6,750.00
2.6
Remove And Dispose Existing Pavers
6797
SF
$ 4.95
$ 33,645.15
2.7
Remove And Dispose Existing Curb
3900
LF
$ 13.25
$ 51,675.00
2.10
Remove and Dispose Existing Header Curb
350
LF
$ 8.50
$ 2,975.00
2.11
Remove And Dispose Existing Asphalt
60881
SF
$ 1.55
$ 94,365.55
2.12
Remove And Dispose Existing Concrete Driveways
3140
SF
$ 5.50
$ 17,270.00
2.13
Remove And Dispose Existing Concrete
Walkways/Sidewalks
28495
SF
$ 4.55
$ 129,652.25
2.14
Remove And Dispose Existing Trees
21
EA
$ 1,995.00
$ 41,895.00
2.15
Remove and relocate Existing Bollards (Artwalk)
1
LS
$ 3,000.00
$ 3,000.00
DocuSign Envelope ID: 8D6F2A1E-8AF8-412B-95FF-49EODEA9FF6F
2.16
Remove and Dispose Existing Steps & Landings
200
SF
$ 12.00
$ 2,400.00
2.17
Remove And Dispose Existing Light Pole Bases
47
EA
$ 313.00
$ 14,711.00
2.18
Saw Cut Existing Asphalt
500
LF
$ 2.75
$ 1,375.00
2.19
Saw Cut Existing Concrete -Double Cut Along
Bilin
5000
LF
$ 8.95
$ 44,750.00
2.21
Remove Sidewalk Pavers
2558
SF
$ 5.00
$ 12,790.00
2.22
Remove / Deliver Site Furnishings
1
LS
$ 6,500.00
$ 6,500.00
2.23
Remove & Return Existing Street Signage to City
1
LS
$ 2,950.00
$ 2,950.00
2.24
Strip Existing Sod / Landscape Areas
14400
SF
$ 0.55
$ 7,920.00
2.25
Roll Off Dumpster / Dump Fees
35
EA
$ 750.00
$ 26,250.00
2.26
Remove Existing Concrete Road Base
65781
SF
$ 6.05
$ 397,975.05
2.27
Mini Mill Joints
6
EA
$ 795.00
$ 4,770.00
2.30
Remove Existing Roof Drains
11
EA
$ 3,313.00
$ 36,443.00
2.31
Relocate Mail Boxes
10
EA
$ 300.00
$ 3,000.00
2.32
Remove Concrete Intersections
4900
SF
$ 5.00
$ 24,500.00
300 - EARTHWORK AND GRADING $ 265,225.11
3.1
12" Stabilized Subgrade
8193
SY
$ 3.90
$ 31,952.70
3.3
Roadway Grading
7736
SY
$ 2.95
$ 22,821.20
3.4
Asphalt Trail Grading
457
SY
$ 6.00
$ 2,742.00
3.5
Curb Grading
4500
SY
$ 6.30
$ 28,350.00
3.6
Sidewalk/Driveway Grading
3515
SY
$ 5.35
$ 18,805.25
3.7
Landscape Area Grading
3500
SY
$ 2.25
$ 7,875.00
3.10
Excavate For Roadway
8059
CY
$ 7.69
$ 61,973.71
3.11
Excavate For Multi -Purpose Trail
275
CY
$ 7.69
$ 2,114.75
3.12
Excavate For Crosswalks
50
CY
$ 15.00
$ 750.00
3.17
Removal / Disposal Of Excess Fill Material
7590
TCY
$ 7.95
$ 60,340.50
3.18
Final Dressing And Finish Grading
1
LS
$ 27,500.00
400 - WATER SUPPLY $ 702,455.00
4.2
Remove And Install Water Meter And Box & Connect
To Existing Service (Connections)
61
EA
$ 995.00
$ 60,695.00
4.3
Remove Existing Water Service
2500
LF
$ 12.50
$ 31,250.00
4.4
New Water Service
1900
LF
$ 22.00
$ 41,800.00
4.7
Remove and Replace Fire Hydrant & Valve
5
EA
$ 4,750.00
$ 23,750.00
DocuSign Envelope ID: 8D6F2A1E-8AF8-412B-95FF-49EODEA9FF6F
4.10
Adjust Water Valve Boxes To Grade
61
EA
$ 150.00
$ 9,150.00
4.18
Connect 2" Poly Water Service To Existing Services
Or Meter
2
EA
$ 1,995.00
$ 3,990.00
4.24
10" PVC C900 Water Main
2200
LF
$ 69.93
$ 153,846.00
4.25
10" Gate Valve
24
EA
$ 2,950.00
$ 70,800.00
4.26
10" Cap
4
EA
$ 400.00
$ 1,600.00
4.27
Potholing / Soft Digs
1
LS
$ 35,000.00
$ 35,000.00
4.28
Pressure Testing
8
EA
$ 937.50
$ 7,500.00
4.29
Bacteriological Testing
8
EA
$ 687.50
$ 5,500.00
4.31
8x8 wet tap
2
EA
$ 9,939.00
$ 19,878.00
4.32
8" Sleeve
2
EA
$ 650.00
$ 1,300.00
4.33
8x10 Reducer
4
EA
$ 350.00
$ 1,400.00
4.34
8" Line Stop
2
EA
$ 11,500.00
$ 23,000.00
4.35
10x2-1 Taps
61
EA
$ 150.00
$ 9,150.00
4.38
8" DIP Mega Lug Kit
19
EA
$ 110.00
$ 2,090.00
4.39
10" Fittings (45 Bend, Sleeve)
19
EA
$ 755.00
$ 14,345.00
4.41
10" DIP Joint Restraint
75
EA
$ 400.00
$ 30,000.00
4.42
10" Mega lugs
123
EA
$ 157.00
$ 19,311.00
4.43
2" Poly
1900
LF
$ 17.50
$ 33,250.00
4.45
Remove/ Abandon existing water main
1800
LF
$ 20.00
$ 36,000.00
4.47
10x4 Tee for BF
1
EA
$ 600.00
$ 600.00
4.49
2" Jumper Assem
6
EA
$ 2,750.00
$ 16,500.00
4.50
3" Long Side Chase
2300
LF
$ 15.00
$ 34,500.00
4.51
Tie In existing
5
EA
$ 2,200.00
$ 11,000.00
4.52
ARV Complete (above ground)
1
EA
$ 5,250.00
$ 5,250.00
500 - STORM DRAINAGE $ 624,440.43
5.1
Remove Existing Inlet
10
EA
$ 1,750.00
$ 17,500.00
5.2
Remove Existing Manholes
8
EA
$ 1,750.00
$ 14,000.00
5.5
Remove Existing 12" RCP
340
LF
$ 21.00
$ 7,140.00
5.6
Remove Existing 15" RCP
10
LF
$ 25.00
$ 250.00
5.7
Remove Existing 18" RCP
762
LF
$ 30.00
$ 22,860.00
5.13
18" RCP
1875
LF
$ 59.95
$ 112,406.25
5.15
12" Neoplast Drain Basin With Standard Grate
1
EA
$ 950.00
$ 950.00
5.16
FDOT Type 9 Inlet
9
EA
$ 4,995.00
$ 44,955.00
DocuSign Envelope ID: 8D6F2A1E-8AF8-412B-95FF-49EODEA9FF6F
5.17
Storm Drainage Manholes
EA
$ 4,665.00
5
$ 23,325.00
5.18
Construct Modified YPE 6 Inlets
EA
$ 4,995.00
8
$ 39,960.00
5.20
Construct USF 5112 VG Inlet Frame & 6143 Grate
24
EA
$ 4,350.00
$ 104,400.00
5.20.1
Double 5112 inlet top
23
EA
$ 1,950.00
$ 44,850.00
5.25
Construct Doghouse Manhole Over Existing 15" RCP
2
EA
$ 6,750.00
$ 13,500.00
W/ Modified Type 6 Inlet
5.30
Adjust Existing Manholes To Grade
EA
$ 1,645.00
2
$ 3,290.00
5.32
Core Existing MH
1
EA
$ 4,500.00
$ 4,500.00
5.34
Tie In Existing MH & Inlet
1
EA
$ 950.00
$ 950.00
5.40
24" RCP
LF
$ 83.96
633
$ 53,146.68
5.41
Brick Plug 18" Stubout
EA
$ 950.00
2
$ 1,900.00
5.45
12" SDR 26 Side and Roof Drains
LF
$ 55.00
112
$ 6,160.00
5.46
10" SDR 26 Side and Roof Drains
LF
$ 50.00
84
$ 4,200.00
5.47
SDR 26 Side and Roof Drains
LF
$ 47.50
�8"
381
$ 18,097.50
5.48
6" SDR 26 Side and Roof Drains
LF
$ 40.00
200
$ 8,000.00
5.49
6" Clean Outs
EA
$ 500.00
21
$ 10,500.00
5.50
4" Clean Outs
EA
$ 450.00
15
$ 6,750.00
5.51
Connect to Existing Storm and Roof Systems
EA
$ 1,950.00
21
$ 40,950.00
5.52
Storm and Roof Drain Fittings
LS
$ 15,000.00
1
$ 15,000.00
5.53
15" SDR 26 Storm Drain
100
LF
$ 49.00
$ 4,900.00
600 - SANITARY SEWER $ 119,663.73
6.35
10" C900 Force Main Remove and Replace
100
LF
$ 95.00
$ 9,500.00
6.36
10" Hymax Adapter Connection
2
EA
$ 11250.00
$ 2,500.00
6.37
Install Sanitary Conflict Manhole on Trail
1
LS
$ 83,913.73
$ 83,913.73
6.38
6" SDR 26 Sewer Service Complete (7th Street)
5
EA
$ 4,750.00
$ 23,750.00
700 - STREET LIGHTING / ELECTRICAL $ 1,156,596.97
7.1
Remove Existing Street Light Poles And Circuitry
47
EA $ 500.00 $ 23,500.00
7.2
Remove Existing Conduit And Wire
1
LS
$ 12,728.00
DocuSign Envelope ID: 8D6F2A1E-8AF8-412B-95FF-49EODEA9FF6F
7.3
F&I TYPE "A" Fixture (Led, Acorn Light Fixture W/
TYPE I'i Dist, On 12'-0" Alum, Fluted Pole With GFI
40
$ 8,768.50
$ 350,740.00
7.4.1
F&I TYPE "B" Fixture
3
qEA
$ 8,768.50
$ 26,305.50
7 4 2
F&I TYPE "C" Fixture
4
$ 9,500.00
$ 38,000.00
7.5
F & I Pole Bases With Anchor Bolts For Sternberg
47
EA
$ 2,650.00
$ 124,550.00
7.6
F & I Pull Boxes (13"X24"X18")
8
EA
$ 995.00
$ 7,960.00
7.7
F & I Pull Boxes (12"X12"X12")
29
EA
$ 775.00
$ 22,475.00
7.8
F & I Fiber Pull Boxes
EA
$ -
$
7.9
F & I Pole Mounted GFCI Receptacle
43
EA
$ 200.00
$ 8,600.00
7.10
F & I In -Grade Weather Proof Power Box Per Det
28
EA
$ 2,037.75
$ 57,057.00
7.11
F & I In -Grade Weather Proof Event Power Box Per
16
EA
$ 2,319.20
$ 37,107.20
D t E1.2
& I Electrical Service Rack & Panel for Panel Ph
7.12
IF
31
1
EA
$ 21,995.13
$ 21,995.13
F & I Electrical Service Rack & Panel for Panel Ph
7.13
3.2
1
EA
$ 23,913.73
$ 23,913.73
Irrigation/Electrical Service/Time Clock Hook Up
7.14
1
LS
$ 19,950.00
F & I Conduit And Wire For A Complete Working
7.15
System
1
LS
$ 273,032.41
F&I Tree Pedestal Recepticals
7.22
31
EA
$ 913.00
$ 28,303.00
F&I GFCI Device Pedestals
7.23
10
EA
$ 913.00
$ 9,130.00
Duke Conduit Bore (7th)
7.20
�4"
250
LF
$ 55.00
$ 13,750.00
2" Duke Conduit Bore (7th)
7.21
500
LF
$ 45.00
$ 22,500.00
6" Duke Conduit Bore (7th)
7.22
500
LF
$ 70.00
$ 35,000.00
800 - CONDUIT, FRANCHISE UTILITY, AND FIBER OPTIC IMPROVEMENTS $ 623,160.00
F & 1 2-2 In. Sch 40 Conduits Per Clermont
8.1
2100
LF
$ 25.00
$ 52,500.00
F & 1 1-2 In. Sch 40 Conduits
8.2
6650
LF
$ 20.00
$ 133,000.00
F & 1 2-1 In. Sch 40 Conduits
8.3
7300
LF
$ 25.00
$ 182,500.00
F & 1 1-4 In. Sch 40 Conduits Per Duke Energy
8.4
Specifications
LF
$ 30.00
$ -
F & 1 1-6 In. Sch 40 Conduits Per Duke Energy
8.5
Specifications
LF
$ 35.00
$ -
F&I 2-2 In. HDPE Conduits Per City Specs
8.6
3600
LF
$ 25.00
$ 90,000.00
Connect 2-2 In. HDPE Conduits To Existing Hand
8.7
Holes
EA
$ 500.00
$ -
DocuSign Envelope ID: 8D6F2A1E-8AF8-412B-95FF-49EODEA9FF6F
Connect 2-2 In. HDPE Conduits To Existing Conduit
8.8
EA
$ 600.00
$ -
8.9
F & 12 In. HDPE Conduits Per City Specifications
LF
$ 25.00
$ -
Connect 2 In. HDPE Conduits To Existing Hand
Holes
8.10
EA
$ 300.00
$ -
8.11
Adjust Existing Cable Boxes To Grade
EA
$ 250.00
$ -
8.12
Relocate Existing Telecommunication Junction Box
EA
$ 250.00
$
-
8.13
Adjust Existing Utility Box To Grade
EA
$ 250.00
$ -
8.14
Relocate Existing Electrical Transformer Box
EA
$ 2,500.00
$ -
8.15
Adjust Foc Box To Grade
EA
$ 400.00
$ -
8.16
F & I Fiber Optic Conduit And Tracer Wire
LF
$ 18.00
$ -
8.17
F & 11.5" Conduit
LF
3105
$ 25.00
$ 77,625.00
8.18
F & 1 1.25" Conduit
LF
2935
$ 25.00
$ 73,375.00
8.22
1" Conduit Sweeps
EA
250
$ 17.00
$ 4,250.00
8.22
1.25" Conduit Sweeps
EA
40
$ 20.00
$ 800.00
8.22
1.5" Conduit Sweeps
EA
30
$ 22.00
$ 660.00
8.22
2" Conduit Sweeps
EA
70
$ 25.00
$ 1,750.00
8.22
3" Conduit Sweeps
EA
4
$ 75.00
$ 300.00
8.22
4" Conduit Sweeps
EA
4
$ 300.00
$ 1,200.00
8.23
6" Galn 36" Sweeps
EA
8
$ 650.00
$ 5,200.00
900 - ROADWAY/PARKING AREAS/MULTI-PURPOSE TRAIL/CURB $ 278,366.81
oTION
9.1
Mirafi 140n Geotextile Fabric For Paver Roadway
69624
SF
$ 0.79
$ 55,002.96
9.2
6" Recycled Concrete For Paver Roadway
7736
SY
$ 19.95
$ 154,333.20
6" Lime Rock Base For Multi -Purpose Trail And West
9•3
Avenue and Driveway
426
SY
$ 16.65
$ 7,092.90
9.4
12" Recycled Concrete for Cross walk
SY
$ 24.95
640
$ 15,968.00
1.5" Sp 9.5 Structural Asphalt (Multi -Use Trail)
9.5
395
SY
$ 15.65
$ 6,181.75
1" Sp 9.5 Asphalt Base Course
9.6
1120
SY
$ 9.95
$ 11,144.00
DocuSign Envelope ID: 8D6F2A1E-8AF8-412B-95FF-49EODEA9FF6F
1" Sp 9.5 Asphalt Overlay
9.6.1
1120
SY
$ 7.95
$ 8,904.00
Tack
9.7
1120
SY
$ 2.00
$ 2,240.00
Temp Road Patch/Tie ins
9.7A
1
LS
$ 17,500.00
$ 17,500.00
1000 - SIDEWALK/CONCRETE CURB CONSTRUCTION $ 849,183.87
10.1
4" Concrete Sidewalk
SF
$ 8.89
35113
$ 312,154.57
10.2
6" Driveway
SF
$ 13.95
7555
$ 105,392.25
10.5
6" Handicap Ramps
SF
$ 21.95
1100
$ 24,145.00
10.6
24" Valley Gutter
LF
$ 37.50
2495
$ 93,562.50
10.7
F Curb
LF
$ 36.75
1599
$ 58,763.25
10.8
12" Ribbon Curb
LF
$ 37.50
1291
$ 48,412.50
10.9
Handicap Ramp Curbs
LF
$ 33.00
320
$ 10,560.00
10.14
Curb Transitions
100
LF
$ 39.00
$ 3,900.00
10.15
Type D Curb
3626
LF
$ 37.55
$ 136,156.30
10.16
Remove and Replace Sidewalk (7TH) DUKE
2250
SF
$ 24.95
$ 56,137.50
1100 - BRICK PAVERS - INSTALLATION (City prepurchased pavers) $ 376,410.72
11.1
F & 12 1/4" Truncated Dome Mats
700
SF
$ 29.79
$ 20,853.00
11.2
Install 2 1/4" Roadway Brick Pavers - K&W Red 2
69232
SF
$ 3.96
$ 274,158.72
1/4"X4"X8" - Manuf. By Glen-Gery Corporation
11.3
F & 12 3/4" Crosswalk Brick Pavers
747
SF
$ 17.00
$ 12,699.00
11.5
F & 1 6" X 6" White Roadway Brick Pavers
SF
$ 37.50
160
$ 6,000.00
11.10
24" White Brick Stop Bar
SF
$ 33.00
1900
$ 62,700.00
1200 - VERTICAL ELEMENTS/SITE WALLS/STAIRS/RAMPS $ 44,700.00
12.1
F & I Ramp/Stairs Railing (Allowance)
LF
$ 450.00
Thickened Edge Concrete for Trail @ NW Corner Of
12.5
7th And Montrose
60
LF
$ 250.00
$ 15,000.00
FDOT Aluim Railing (Black coated)
12.5
60
LF
$ 495.00
$ 29,700.00
1300 - FURNISHINGS AND MISCELLANEOUS $ 29,925.00
13.5
Concrete Bench Pads
15
EA
$ 1,995.00
1 $ 29,925.00
1400 - PAVEMENT MARKINGS AND SIGNAGE (ALLAW,4NEE) $ 63,500.00
DocuSign Envelope ID: 8D6F2A1E-8AF8-412B-95FF-49EODEA9FF6F
14.1
Thermoplastic Striping
1
LS $ 8,500.00
14.2
Signage Package
1
LS $ 55,000.00
1500 - LANDSCAPING $ 169,840.04
15.1
Lily Of The Nile, #1; Full;3-4 PPP Min; 18" O.C.
327
$ 12.00
$ 3,924.00
15.2
African Iris, White, #3; Full; 5-6 PPP Min; 3' O.C.
36
qEA
$ 9.95
$ 358.20
15.4
Crinum Lily, Red, #15; 4'OA (In Lieu of Cirnum #15)
2$
165.00
$ 330.00
15.5
Crinum Lily, Red, #7; 3' OA (In Lieu of Cirnum Lily
#7
4
EA
$ 82.50
$ 330.00
15.6
Crape Myrtle, Cont. B&B, 9'+Ht X 4-5' Spr; 5' Ct Multi-
Trunk (In Lieu of Crape Myrtle Standards Trunk)
3
EA
$ 331.20
$ 993.60
15.7
Dwarf Confederate Jasmine, #1, Full; 15"+
Runner's 5-7 Runners Mina 12" OC
140
EA
$ 8.20
$ 1,148.00
15.8
Dwarf Yaupon Holly #3
41
EA
$ 12.55
$ 514.55
15.9
Dwarf Nandina #3 ; full 15" + spr 2' oc
74
EA
$ 85.00
$ 6,290.00
15.10
European Fan Palm
3
EA
$ 1,750.00
$ 5,250.00
15.11
Emerald Goddess Liriope, #1; Full; 5-7 PPP Min; 12"
OC Or As Noted (In Lieu of Society Garlic)
487
EA
$ 9.95
$ 4,845.65
15.13
Heavenly Bamboo
15
EA
$ 95.00
$ 1,425.00
15.16
Pringle Dwarf Japanese Yew
25
EA
$ 35.00
$ 875.00
15.17
Live Oak, Cont. B&B; 14-16'ht X 7-9'spr; 4" Cal. Min.
6
EA
$ 1,750.00
$ 10,500.00
15.20
Sabal Palm, B.R.; Root Enhanced, See Plan For CT
Heights (In Lieu of Wild Date Palm)
30
EA
$ 900.00
$ 27,000.00
15.27
Pine Straw Mulch 3" Depth
1
LS
$ 6,500.00
15.28
Argentine Bahia Sod
10000
SF
S 0.45
$ 4,500.00
15.31
1 Year Landscape Maintenance - Includes ongoing
maintenance from the start of landscaping, and 1
year beyond the substantial completion date
1
EA
$ 55,950.00
$ 55,950.00
15.32
Varigated Dwarf Schefflera #3 18-24" ht 14-18" 30"
oc (In Lieu of Indian Hawthorn White)
170
EA
S 65.65
$ 11,160.50
15.35
Azalea, Salmon "Fashion", #3
34
EA
S 21.79
$ 740.86
15.36
Azalea, White, "GG", #3
12
EA
S 21.79
$ 261.48
15.41
Coontie 18"
80
EA
$ 93.04
$ 7,443.20
15.42
Pine Bark Mulch 3" Depth
1
-
LS
$ 19,500.00
1600 - IRRIGATION $ 177,450.00
16.1
Irrigation System Complete (Including But Not
Limited To)
1 LS $ 169,950.00
DocuSign Envelope ID: 8D6F2A1E-8AF8-412B-95FF-49EODEA9FF6F
BLOCK AT A TIME, INCLUDING INTERSECTIONS
CITY/OTHERS TO LOCATION ALL IRRIGATION POINTS OF SERVICE
ROADWAY BRICK PAVERS WERE PRE -PURCHASED BY THE CITY OF CLERMONT
ANY FEES FOR DUKE AND DUKE SUBCONTRACTORS WILL BE RESPONSIBILITY OF THE CITY
ALL STREET SIGNAGE BY OTHERS EXCLUDING MOT
IT IS TRAVERSE'S INTENTION TO REMOVE SIDEWALKS IN FRONT OF BUSINESS AND FORM NEW SIDEWALKS ONE
ONE DAY AND POUR SAID SIDEWALKS THE FOLLOWING DAY OR TWO, IN MULTIPLE AREAS. WE WILL DO OUR
BEST TO NOT INTERFERE WITH BUSINESS BUT AT TIMES THAT MAY BE INEVITABLE. IT IS THE CITYS
RESPONSIBILTY TO NOTIFY BUSINESSES
DocuSign Envelope ID: 8D6F2A1 E-8AF8-412B-95FF-49EODEA9FF6F
iQ_
'
ft�hw -I-
DETAILS
DOWNTOWN STREETSCAPE PHASE 3
West Montrose Street — West Avenue to Lake Avenue
• Installing 10-inch water main pipes
• Installing 18 to 24-inch storm water pipes
• Installing 1 and 2-inch electrical conduit
for street lighting and event power
• Installing brick pavers
• Increasing on -street parking
• Resurfacing 7th Street and extending trail
to West Montrose Street
• Replacing sidewalk, curbs and driveways
• Relocating overhead power on 71h Street
to underground service by Duke Energy
x
WORK NOTES
• Monday— Friday, 7 a.m. to 5 p.m.
• Saturday work maybe necessary and
will require City approval.
RL,i
OVERVIEW
The project includes removing existing asphalt, sidewalk,
curb, driveways and landscape to install underground pipes
for utility upgrades and add brick pavers. Improvements to
parking, electricity, lighting and landscape will also be
completed as part of the Master Plan for
Clermont's Downtown -Waterfront District.
w
a V3 f
SECTION SCHEDULE *
WORK TO BEGIN 3/21/22, SECTION 1
Section 1- 7th Street (8 wrcKs)
Section 2 - 7th Street to City Hall (5 weeks)
Section 3 - City Hall to Lake Street (8 weeks)
Section 4 - intersection with Lake Street (4 weeks)
Section 5 -West Avenue to old PD (5 weeks)
Section 6 — Old PD to 8th Street (4 weeks)
Section 7 - 8th Street to mid -block (8 weeks)
Section 8 - Mid -block to 7th Street (6 weeks)
Section 9 - 7th Street intersection (4 weeks)
*This proposed construction schedule could be
impacted by weather, materials acquisition delays
or other unforeseen conditions.