Loading...
Contract 2020-067A.09DocuSign Envelope ID: 47F52677-DF6D-4056-B572-AEBOA7BO508E CHANGE ORDER FORM Contract / P.O. Number: 2019-55 Bid Number: RFB 19-051 Change Order Number: 9 Change Order Date: Aug 19, 2021 Project Name: Streetscape Phase 2 Department: Public Services Job Location: Minneola Ave. and Osceola Street VENDOR INFORMATION: Company Name: Traverse Group, Inc. Address: P.O. Box 121754 City, St., Zip: Clermont, FL 34712 Contact Name: Alicia Roehn Telephone:352-409-6630 DESCRIPTION OF CHANGE: Alteration, deviation, addition, or deletion caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary). Additive Change Order - Drainage Structure 4+61 R Revive bldg and P&P Bonds price increase. ITEM AMOUNT A. ORIGINAL CONTRACT VALUE: $ 4,310,565.37 B. AMOUNT OF THIS CHANGE ORDER: $ 6,618.03 Must be within the overall scope of services in accordance with contract specifications. C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): % 0.2% D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 102,804.99 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $ 109,423.02 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 10% Maximum % 2.5% G. NEW CONTRACT VALUE (A+E) $ 4,419,988.39 This Change Order is not valid without the following signatures: DocuSigned by: 396EE3AC046D48F... CONTRACTOR EDocuSigned by: fb" bVWA S6V1 014063B8FF414OF... DocuSigned by: 8/19/2021 97CC96F6EBA64F2... Date PROJECT ARCHITECT / ENGINEER DocuSigned by: 8/20/2021E° S 431F57D413554D6... Date 8/20/2021 DEPARTMENT DIRECTOR Date PROCUREMENT DIRECTOR / Date CITY MANAGER Council approval is required if change order(s): 1) exceeds $49,999; 2) exceeds the greater of $100,000 OR 10% of the original contract amount for construction projects; 3) the funds are not available in the approved budget for the department. CITY OF CLERMONT ATTEST: MAYOR Date CITY CLERK Date Rev. 1-1-2021 DocuSign Envelope ID: 47F52677-DF6D-4056-B572-AEBOA7B0508E GROUP,TRAVERSE OF • ORDERP CHANGE lu- N. General Description Qty. Unit Unit Price Extended Price Drainage Structure 4+61R Revive Bldg $ 6,618.03 5.13 18" HDPE 20 LF $ 42.50 $ 850.00 5.42 18" HDPE 45 Bend 2 EA $ 875.00 $ 1,750.00 5.18 Modified Type 6 Inlet 1 EA $ 3,750.00 $ 3,750.00 10.1 4" Concrete Sidewalk 30 SF $ 6.75 $ 202.50 $ 0.00 $ 0.00 1.2 Payment and Performance Bond - Increase due to bonding charge(s) by Bonding Company (1%) 1 LS $65.53 $ 65.53 TOTAL $ 6,618.03 CHANGE ORDER TOTAL $ 6,618.03