Loading...
Contract 2022-020A.02DocuSign Envelope ID: 9D5D5337-AE1 4-44CD-8D33-D5D92F1 D0459 CHANGE ORDER FORM Contract / P.O. Number: 2019-55 Bid Number: 19-051 Change Order Number: 2 Change Order Date: June 30, 2022 Project Name: Streetscape Phase 3 Department: Public Services Job Location: 4th Street Boat Ramp VENDOR INFORMATION: Company Name: Traverse Group, Inc. Address: P.O. Box 121754 City, St., Zip: Clermont, FL 34712 Contact Name: Alicia Roehn Telephone:352-409-6630 DESCRIPTION OF CHANGE: Alteration, deviation, addition, or deletion caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary). No Cost Additive Change Order: Add a 30 day extension to incorporate the work described in Amendment 4 for the removal of the old boat ramp and associated structures within Lake Minneola at the old 4th Street Boat Ramp. ITEM AMOUNT A. ORIGINAL CONTRACT VALUE: $ 7,796,937.40 B. AMOUNT OF THIS CHANGE ORDER: $ Must be within the overall scope of services in accordance with contract specifications. C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): % 0.0% D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $ F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 10% Maximum % 0.0% G. NEW CONTRACT VALUE (A+E) $ 7,796,937.40 This Change Order is not valid without the following signatures: Ea DocuSigned by: ( 66L rbt,U,In, 396MAC046D48F... CONTRACTOR DocuSigned by: 014063B8FF4140F... 6/30/2022 Date PROJECT ARCHITECT / ENGINEER DS DocuSigned by: 6/30/2022� Eb15 8A394C8 Date 7/1/2022 DEPARTMENT DIRECTOR Date PROCUREMENT DIRECTOR / Date CITY MANAGER Council approval is required if change order(s): 1) exceeds $49,999; 2) exceeds the greater of $100,000 OR 10% of the original contract amount for construction projects; 3) the funds are not available in the approved budget for the department. CITY OF CLERMONT ATTEST: MAYOR Date CITY CLERK Date Rev. 1-1-2021