1993-02
~-
t
'JI
8
8
......~
~ Rorida
øa~~
~
AGREEMENT FOR ELECTRIC SERVICE
BETWEEN
FLORIDA POWER CORPORATION (the "UTILITY")
AND
The City of Clermont
(the "APPLICANr')
WHEREAS,the Utility owns and operates an electric distribution system In
Florida, in which the Applicant owns a real property development to be known as
Station
(the "Development"), on which the Applicant has constructed or proposes to construct certain Improvements; and
Lake County,
~lty of ~l~rmont Poli~~
WHEREAS, the Utility desires to cooperate with the Applicant and to Install an electric distribution system for the Develop-
ment as described In the Utility's electric service proposal dated October 14. 1992 ,Including the various
attachments specified therein, (the "Proposal"), which Is Incorporated herein and made a part hereof by this reference;
NOW. THEREFORE, In consideration of the premises and of the mutual agreements hereinafter set forth, the parties hereby
agree as follows:
1 Upon cpmpliance by the Applicant with all of the provisions of the Proposal, In a manner acceptable to the Utility, the
Utility shall Install, operate and maintain an electric distribution system consisting of facilities and related equipment for pro-
viding electric service In accordance with the Proposal. Facilities will be provided for single phase service only, except as
otherwise InQlcated In the Proposal.
2. The Applicant agrees to pay to the Utility the charge set forth In the Proposal to aid In the construction of the distribution
system, which amount Is to be paid before construction by the Utility commences.
3. In the event the Applicant makes or causes to be made, any changes In the distribution system shown In the Proposal, the
Applicant agrees to pay the Utility all additional costs Incurred by It as a result of such changes. The Applicant further agrees
to pay the Utility for any damages to Its equipment or facilities caused by the Applicant, Its employees, agents, or sub-
contractors.
4. The Applicant agrees to convey to the Utility, without cost, all easement rights, Including Ingress and egress, necessary
and convenient to the Utility for the purpose of constructing, operating, maintaining, and removing the distribution system,
5. The Applicant shall provide service entrance facilities In accordance with the Proposal and the Rules and Regulations of
the Utility, including the current published "Requirements for Electric Service and Meter Installations".
\
6. Nothing In this Agreement shall be construed to have the effect of vesting In the Applicant any right, title or Interest in or
to any distribution facilities, all of which shall be and remain the exclusive property of the Utility.
7. This agreement Is subject to the regulatory Jurisdiction of the Florida Public Service Commission and the terms and
charges hereof are contingent upon any applicable changes approved or directed by the Commission to the Rules and
Regulations or the Rate Schedules contained In the Utility's tariff. No other changes to this agreement shall be effective
unless agreed to In writing.
8. This agreement Incorporates all prior agreements between the Applicant and the Utility concerning the subject develop-
ment and all other representations or understandings not set forth herein are superseded and Ineffective.
::: I ttC~(APPllc.ntJ
FLORIDA POWER CORPORATION
Byr¿)~¿rL!j)oJ ~~
Title
Supervisor. Distribution Englneering
Date
1/6/93
Date
\olao{qC)..
, I
Rev 1/80
1104 415(S)
'"
~
.,...
.......
.-.......
:. -... .,
... ...
,. ..- .:
..-...-..
......-
Florida 8
Power
8
CORPORATION
October 16, 1992
Seacoast Construction
775 Kirkman Road, unit 110
Orlando, Florida 32811
Attn: Mr. Bill Anderson
ELECTRIC SERVICE PROPOSAL/AGREEMENT
Re:
Florida Power Corporation's work order number C-92-01230H/UG
Proposed distribution system for city of Clermont Pol ice
station
Dear Mr. Bill Anderson:
Our proposed system is based upon load information and building
plans submitted to Florida Power Corporation. Any changes in
building design, project layout, service requirements, or project
scheduling, may affect this system.
service within the project will
facilities as shown on the drawing.
be
provided
by
underground
Service voltage for the project will be 120/208 volts, three phase,
four wire.
Under the terms of Florida Power corporation's
Commercial/Industrial Underground Distribution policy on file with
the Florida Public Service commission, there will be a charge of
$3181.00 to be paid by the customer in advance, to aid in the
construction of this underground system. This charge represents
the cost differential for installing underground as opposed to
overhead facilities.
In the event that you request or cause any changes to be made to
this distribution system, you will be charged for all additional
costs that Florida Power incurs because of the changes. You will
also be charged for all costs resulting from damages to our
equipment or facilities caused by you, your employees, agents or
subcontractors.
BUENA VISTA ENGINEERING DEPARTMENT POBox 417. Winter Park. Florida 32790-0417. (407) 827-1250
^ A Florida Progress Company
... Pnntad on 'acyc/ad papa'
,..
.. .
.
8
8
It will be your responsibility to have all trench routes and
transformer locations cleared, with final grade established, prior
to the installation of our facilities. All pertinent lot corners,
street locations and underground utilities shall be staked. You
will be responsible for any damage to underground utilities
resulting from your failure to accurately locate and mark such
utilities prior to the installation of our facilities and for any
costs incurred due to your failure to comply with the other
responsibilities described herein. No paving or sodding shall be
done on the trench routes until all necessary cables or conduits
have been installed. Florida Power will not be responsible for any
repaving or resodding made necessary by the installation of the
facilities shown in this proposal.
For further information regarding meter requirements, please refer
to the current issue of our booklet, "Requirements for Electric
Service and Meter Installation", which can be obtained from your
District Representative.
It will be the responsibility of Florida Power Corporation to
provide, install and maintain all primary and secondary conductors,
ducts, transformers, and other facilities necessary to provide
service to the designated points of delivery as indicated on the
drawing. We will also provide all necessary easement documents,
authorization forms, billing invoices, and contracts for execution
by the customer.
All terms and charges of this proposal are valid for ninety days
from the date of this letter, after which time they are subject to
change in accordance with our rates and tariffs as filed with the
Florida Public Service Commission. Installation of our system will
proceed relative to the scheduled and actual completion of the
project. In the event that the installation of our system cannot
be completed within six months of the date of this letter as a
direct result of the progress of the entire project, that portion
of our system which has not been installed may be subject to change
in accordance with our filed rates and tariffs.
If this proposal is acceptable to you, please sign one copy of the
enclosed Agreement for Electric Service form and return it to this
office as soon as possible, along with the other documents and
payment previously discussed. One copy of each document may be
retained for your records. If there are any questions about this
proposal, please do not hesitate to call John Minor, Clermont
District, 407/646-8275 or 904/394-3892.