Contract 2023-023ADocuSign Envelope ID: B2BFAE97-42D0-4B37-B019-E27B8C4EFB47
CHANGE ORDER FORM
2023-023
Contract / P.O. Number: 2018-29 Bid Number: RFQ 18-015
Change Order Number: 1 Change Order Date: Feb 15, 2023
Project Name: 8th Street Pier Replacement Department: City Manager
Job Location: 8th Street at Waterfront Park
VENDOR INFORMATION:
Company Name: HALLF Associates, Inc.
Address: 902 North Sinclair Ave. City, St., Zip: Tavares, FL 32778
Contact Name: Duane K. Booth Telephone:352-343-8481
DESCRIPTION OF CHANGE:
Alteration, deviation, addition, or deletion caused by conditions encountered during construction not covered by the specifications and
drawings of the project (attach additional pages if necessary).
Additive change order to provide additional engineering services as particularly described in Attachment "A".
Approved by City Council on February 14, 2023, agenda item 4.
ITEM
AMOUNT
A.
ORIGINAL CONTRACT VALUE:
$ 104,690.00
B.
AMOUNT OF THIS CHANGE ORDER:
$ 33,116.00
Must be within the overall scope of services in accordance with contract specifications.
C.
PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A):
% 31.6%
D.
AMOUNT OF PREVIOUS CHANGE ORDERS:
$ 0.00
E.
TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D):
$ 33,116.00
F.
PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 10% Maximum
% 31.6%
G.
NEW CONTRACT VALUE (A+E)
$ 137,806.00
This Change Order is not valid without the following signatures:
CONTRACTOR
Date
EDocuSigned by:
E 2/15/2023
97CC96F6EBA64F2...
PROJECT ARCHITECT / ENGINEER Date
DS
DocuSigned Eby:
�A� bI S 2/15/2023
534781168A394C8...
DEPARTMENT DIRECTOR Date PROCUREMENT DIRECTOR / Date
CITY MANAGER
Council approval is required if change order(s): 1) exceeds $49,999; 2) exceeds the greater of $100,000 OR 10% of the original
contract amount for construction projects; 3) the funds are not available in the approved budget for the department.
CITY OF CLERMONT
DocuSigned by:
2/15/2023
MAYOR Date
ATTEST:
DocuSigned by:
T'""� Ad ► ,d f4wc 2/20/2023
3AD7F3490SR344A
CITY CLERK Date
Rev. 1-1-2021
DocuSign Envelope ID: B2BFAE97-42D0-4B37-B019-E27B8C4EFB47
f CITY OF CLERMONT
CLER 10NT
�no�earcnamp�s AGENDA ITEM
Paqe 1 of 1
Tuesday, February 14, 2023
Task Order Change Order
.0 . • • of
Requesting approval for additional services to a previously approved Task Order for the 8th Street Pier replacement
with Halff Associates, Inc. to provide surveying services for the amount of $33,116.00.
..
On August 23, 2022, in Agenda Item 3, the City Council approved a Task Order for the 8th Street Pier replacement
in the total amount of $104,690 to provide civil engineering and surveying services. In order to complete the work, it
was found that additional surveys and site evaluations were needed. The cost of the additional work is $33,116
making the total cost of the engineering services $137.806.
This Task Order includes surveying services to replace the 8th Street pier. This will include a Bathymetric and
Topographic Survey. The limits of the survey will include Lake County Property Appraiser alternate key 1616913 to
the South right-of-way line of Osceola Street, the existing dock at 8th Street, and will extend approximately 300 feet
into the lake. The existing dock, retaining walls, hardscape, trees, above -ground evidence of utilities, and
sanitary/storm structures with inverts will be located and shown in the survey. The completed Bathymetric and
Topographic Survey will include spot elevations to determine 1-foot contour intervals. Two (2) Site Benchmarks will
be established as a part of the Topographic Survey.
The On -Call Professional Civil Engineer Services contract was approved on April 24, 2018, No. 2018-29.
The fiscal impact of $33,116 for the additional services is included in the current year's approved budget.
Department Account Code: 60552-66900-72129
Fiscal .. d Number and Description AvailableBudget
Mato"
1. Halff Survey Submittal Letter & Proposal 2-2-23 Halff Survey Submittal Letter & Proposal 2-2-23.pdf
DocuSign Envelope ID: B2BFAE97-42D0-4B37-B019-E27B8C4EFB47
HALFF
VIA EMAIL sdavidoff(a),clermontfl.org
February 2, 2023
Scott Davidoff, CPRP
Deputy City Manager
City of Clermont
685 W. Montrose Street
Clermont, FL 34711
RE: AGREEMENT/PROPOSAL FOR SURVEYING SERVICES
8T" STREET PIER REPLACEMENT WITH NEW MARINA (REVISED), CLERMONT,
FLORIDA, LAKE COUNTY
(HALFF AVO 043826.295)
Dear Mr. Davidoff:
Please find enclosed our proposal for surveying services necessary to complete the above
referenced project as requested. Please be sure to sign, date, and complete the Client Information
Form for billing purposes and return to our office.
We look forward to working with you on this project. Should you have any questions with regards
to this matter, please feel free to contact our office at 352-343-8481.
Sincerely,
HALFF
Suzanne Osborne, P.S.M.
Survey Team Leader
sosborne(o)halff.com
SO:am
Enclosure
HALFF ASSOCIATES, INC.
902 NORTH SINCLAIR AVENUE TEL (352) 343-8481 WWW.HALFF.COM
TAVARES, FL 32778
DocuSign Envelope ID: B2BFAE97-42D0-4B37-B019-E27B8C4EFB47
.;; HALFF
VIA EMAIL sdavidoff(@clermontfl.org
February 2, 2023
Scott Davidoff, CPRP
Deputy City Manager
City of Clermont
685 W. Montrose Street
Clermont, FL 34711
RE: AGREEMENT/PROPOSAL FOR SURVEYING SERVICES
8TH STREET PIER REPLACEMENT WITH NEW MARINA (REVISED),
CLERMONT, FLORIDA, LAKE COUNTY
(HALFF AVO 043826.295)
Dear Mr. Davidoff:
Scope of Services — Halff Associates, Inc.
PHASE 100 TOPOGRAPHIC AND BATHYMETRIC SURVEY
Prepare a Bathymetric and Topographic Survey for the area depicted below. Limits of survey
will include Lake County Property Appraiser alternate key 1616913 to the South right of way line
of Osceola Street, the existing dock at 8th Street and will extend approximately 300' into the
lake (see exhibit below). The existing dock, retaining walls, hardscape, trees, above ground
evidence of utilities and sanitary/storm structures with inverts will be located and shown on
survey. The completed Bathymetric and Topographic Survey will include spot elevations to
determine 1-foot contour intervals. Two (2) Site Benchmarks will be established as a part of the
Topographic Survey. The deliverable will be a Civil 3D base file only.
FEE: $24,720.00
DocuSign Envelope ID: B2BFAE97-42D0-4B37-B019-E27B8C4EFB47
GENERAL SCOPE AERIAL
r
Estimated comaletion time:
Phases 100 will take an estimated 60-75 business days to complete upon receipt of signed
contract. Remaining phases are dependent upon engineering and governmental agency
approvals.
PHASE 200 ENVIRONMENTAL SITE EVALUATION
Halff biologists will conduct a field review of the project site for the purpose of evaluating the
onsite habitats and the potential occurrence of any species considered Endangered,
Threatened, or of Special Concern by the Florida Fish and Wildlife Conservation Commission
(FWC) under Chapter 58A-27.003-005 F.A.C. or the US Fish and Wildlife Service (USFWS)
under C.F.R. 17.11-12. Specific tasks included with this effort are as follows:
DocuSign Envelope ID: B2BFAE97-42D0-4B37-B019-E27B8C4EFB47
a. Prior to the field review, conduct a comprehensive desktop review of government
and other publicly available databases to determine whether occurrences of State
and/or Federal listed plant or animal species may occur or have been documented
in areas with similar habitat within or immediately adjacent to the Project Site.
Databases to be reviewed will include, but not be limited to the US Fish and Wildlife
Service (USFWS), Florida Fish and Wildlife Conservation Commission (FWC), and
Florida Natural Areas Inventory (FNAI), including the FWC bald eagle (Haliaeetus
leucocephalus) nest database and the FWC wading bird rookery database.
b. Review the project area to map and assess the extent and condition of the onsite
habitats. Each habitat type will be mapped using the Florida Land Use, Cover,
and Forms Classification System (FLUCFCS: Florida Department of
Transportation, 1999).
C. Evaluate the project area for the presence of submerged aquatic vegetation (SAV)
and emergent vegetation. The proposed docking facility area will be assessed
utilizing a frotus along belt transects distributed across the project area. All
observed resources will be mapped using GPS for use in the permitting effort and
assessing any impacts to the wetland resources.
d. Conduct meandering pedestrian transect surveys for listed species on the project
site. All habitats within the project boundary will be surveyed in general
accordance with the Florida Wildlife Conservation Guide (2011) as developed by
the USFWS, FWC, and FNAI.
e. Complete a summary report detailing the findings of the site review and listed
species surveys conducted on the project site. If listed species are encountered,
their approximate locations will be depicted on an aerial photograph of the project
site. If there are any regulatory constraints to development of the project due to
wetlands or listed species, detailed recommendations on how to resolve the
constraints prior to initiating development activities will be provided to the CLIENT.
FEE: $4,382.00
PHASE 300 WETLAND DELINEATION
a. Review the project area to locate and flag the boundaries of all wetlands and
surface waters that may exist on the site. The landward extent of wetlands and
surface waters will be located per the wetland delineation methodology provided
in Chapter 62-340, F.A.C., Delineation of the Landward Extent of Wetlands and
Surface Waters and the 1987 Corps of Engineers Wetlands Delineation Manual.
b. Review a draft copy of the wetland delineation survey for conformance with the
field review and regulatory agency survey criteria.
EXCLUDED:
FEE: $3,014.00
This scope does not include formal, comprehensive listed species assessments in
accordance with the Florida Wildlife Conservation Guide (2011). If any listed or
protected species are identified on the project parcels, additional comprehensive,
species -specific surveys may be required by the permitting agencies.
DocuSign Envelope ID: B2BFAE97-42D0-4B37-B019-E27B8C4EFB47
2. Agency coordination for wildlife or wetland related matters not specifically stated
in this Scope of Services. The services to obtain approvals for the incidental take
or relocation of any listed species of flora and fauna are not included in this Scope
of Services.
3. Boat usage and associated boater surveys are not included in the Scope.
4. The agencies requiring permits will only request information considered normal
and necessary for this type of permit. This proposal considers quantitative
sampling for water quality, benthos, sediment, flora or fauna to be examples of
extraordinary work beyond our proposed Scope of Services.
PHASE 9999 REIMBURSABLES
Costs for reimbursables, including printing, copying, blueprints, binding, mileage, etc., shall be
billed at the rates shown in the below Rate Schedule, or at cost.
FEE: $1,000.00 (BUDGET, TO BE BILLED AT COST)
DocuSign Envelope ID: B2BFAE97-42D0-4B37-B019-E27B8C4EFB47
Our fees for the described services are outlined in the following table. We have provided "Lump
Sum Fees" for the services identified in the Scope of Work. Lump Sum Fees do not include
Reimbursable Expenses directly associated with the project (travel, mileage, reproduction,
supplies, and other non -labor reimbursable costs.) Our fee schedule is as follows:
FEE SUMMARY
TASK
AMOUNT
PHASE 100
$
24,720.00
PHASE 200
$
4,382.00
PHASE 300
$
3,014.00
PHASE 9999
$
1,000.00
IF- TOTAL
$
33,116.00
THIS PROPOSAL DOES NOT INCLUDE THE FOLLOWING ITEMS:
1. Boundary Survey
2. Offsite Right -of -Way survey for utilities.
3. Reimbursables to be billed based upon direct expense incurred by HALFF for
blueprints, copies, mylars, reproductions, postage, etc.
DocuSign Envelope ID: B2BFAE97-42D0-4B37-B019-E27B8C4EFB47
Standard Hourly Rate Schedule
Engineers
Principal/Officer - Professional Engineer $250.00
Senior Professional Engineer $220.00
Professional Engineer $175.00
Project Manager $130.00
Engineer Intern $100.00
Technicians
Senior Technician $125.00
Design Technician $85.00
1AW
Principal Officer - Senior Spatial Analyst $165.00
Senior Spatial Analyst $135.00
Spatial Analyst $100.00
GIS Specialist $60.00
Landscape Architects
Principal/Officer - Professional Landscape Architect $200.00
Senior Professional Landscape Architect $150.00
Project Manager Landscape Architect $130.00
Professional Landscape Architect $110.00
Senior Landscape Designer $110.00
Landscape Designer $80.00
Planners
Principal/Officer - Land Planner
$225.00
Senior Planner
$150.00
Professional Planner
$110.00
Project Planner
$85.00
Environmental Scientists
Senior Environmental Scientist
$200.00
Environmental Project Manager
$145.00
Environmental Scientist
$90.00
Inspection and Plans Review
Licensed Plans Examiner, Residential and/or $85.00
Commercial
Inspection Services Residential and/or Commercial $85.00
Survey
Survey Department Manager - P.S.M.
$175.00
Professional Surveyor- P.S.M.
$150.00
2 Man Field Crew
$135.00
3 Man Field Crew
$160.00
4 Man Field Crew
$190.00
Senior Survey Technician
$105.00
Survey Technician
$85.00
Administration
Administrative Assistant $75.00
DocuSign Envelope ID: B2BFAE97-42D0-4B37-B019-E27B8C4EFB47
Reimbursable Expenses
Reimbursable expenses include, but are not limited to:
Courier Service Government Permitting Fees
Maps/GIS Data Prints, Copies, Plots, Plans
Mileage, Parking, Tolls Subconsultant Fees
Postage and Overnight Mail Travel (lodging, rental car, per diem)
Miscellaneous Services
DocuSign Envelope ID: B2BFAE97-42D0-4B37-B019-E27B8C4EFB47
CLIENT INFORMATION FORM
To assist Halff Associates, Inc., to prepare the requested proposal, please complete the information below:
PRINT NAME & TITLE:
COMPANY NAME:
BILLINGADDRESS:
PHONE:
FAX:
E-MAIL:
BILLING CONTACT NAME & TITLE:
BILLING CONTACT EMAIL:
BILLING CONTACT PHONE:
CLIENT REPRESENTATIVE:
IS CLIENT THE OWNER OF THE SUBJECT
PROPERTY? YES: NO:
(If no, Halff Associates, Inc., reserves the right to require a retainer prior to commencing services.)
Is the property accessible?
If gated/locked, who shall Halff Associates, Inc. contact to gain access to the property?
NAME AND PHONE NUMBER:
I HEREBY CERTIFY THAT THE ABOVE INFORMATION IS TRUE TO THE BEST OF MY KNOWLEDGE.
SIGNATURE:
DATE: