Loading...
Contract 2023-047ADocuSign Envelope ID: 7848F668-5FE4-4F20-9392-20C7991A649E 2023-047 FIRST AMENDMENT TO AGREEMENT FOR READY -MIX CONCRETE THIS AMENDMENT is entered into as of this 181h day of April 2023 and is to that certain Agreement No. 2020-39 dated June 16, 2020, hereinafter "the Agreement", by and between the CITY OF CLERMONT, FLORIDA, a municipal corporation under the laws of the State of Florida whose address is: 685 W. Montrose Street, Clermont, Florida, hereinafter referred to as "CITY' and SOUTHERN CONCRETE PUMPING, INC. d/b/a SILVERBACK CONCRETE, whose address is: 6480 Southeast FL 26, Trenton, FL 32693 hereinafter referred to as "CONTRACTOR". The parties, in exchange for the mutual covenants contained herein and in the Agreement, agree as follows: 1. This Amendment expressly modifies the Agreement and in the event of a conflict, the terms and conditions of this Amendment shall prevail. 2. The Compensation Schedule referred to and incorporated into the Agreement is hereby amended to reflect the new price changes as more particularly described in Attachment "A" attached hereto and incorporated herein. 3. All other terms and conditions set forth in the Agreement shall remain in full force and effect and unchanged as agreed to by the parties. IN WITNESS WHEREOF, the parties hereto have executed this Amendment as of the dates set forth below. CITY OF CLERMONT [DocuSigned by: 4 -(�"At,, — DS 431 F57D413554D6... Freddy L. Suarez, Procurement $ervi( ATTEST: DocuSigned by: T Aaw► y-4 Howe 3AD7F34905B344A... Tracy Ackroyd Howe, City Clerk DocuSign Envelope ID: 7848F668-5FE4-4F20-9392-20C7991A649E SOUTHERN CONCRETE PUMPING, INC. d/b/a SILVERBACK CONCRETE DocuS ig^�.� n`edb.�y:.� '"N1�16w By: E 9278D654BO (Signature) Print Name: Cree Nettleton Title: Plant Manager Date: 4/20/2023 2 DocuSign Envelope ID: 7848F668-5FE4-4F20-9392-20C7991A649E Silverback April 12, 2023 Mr. Suarez, This is the pricing we talked about on the phone. The new pricing be low reflects the increased cost of inputs. Please review and get back to me with your thoughts. Thanks, Cree Nettleton Plant Manager Silverback Concrete 3000 PSI CONCRETE Delivered/ Volumetric Truck 3000 PSI W/FIBER Delivered/ Volumetric Truck 3500 PSI CONCRETE Delivered/ Volumetric Truck CY $149.00 CY $154,00 CY $159.00 4000 PSI Delivered/ Volumetric Truck CY $159.00 Flowable Fill Concrete (Excavatable) Delivered/ Volumetric Truck CY $169.00 Flowable Fill Concrete (NON - Excavatable) Delivered/ Volumetric Truck CY 2" Puma Mix Concrete Delivered/Volumetric Truck CY $179.00 $154.00 ACCELERATE Per 1% $4.00 #89 Drain Field Rock 3/8" picked up price TN $72.50 #57 Drain Field Rock 3/4" picked up price TN $65.00 Concrete Sand picked up price TN $50.00 1/4" #2 Rebar in 20 Foot Sections Per FT call for price 3/8" #3 Rebar in 20 Foot Sections Per FT call for price 1/2" #4 Rebar in 20 Foot Sections Per FT call for price 5/8" #5 Rebar in 20 Foot Sections Per FT call for price 1/2" x 4"x 10' Expansion Joint Per Section call for price Silverback Concrete 6480 Southeast FL 26 Trenton, Florida 32693 352 350 1185 si Iverbackconcrete. co We've Got Your Back. DocuSign Envelope ID: 7848F668-5FE4-4F20-9392-20C7991A649E Delivery Fee per load each $110 Fiber 1.5/c CY $8.00 Fuel Surcharge per load each $50 Environmental Fee per load each $25 Minimum Load Fee 2.5c s *Loads under 2.5cys will be charged for 2.5c s Extra Truck Time over 2 hours $100 Weekend Loads Extra Charge per load $250 Escalation 8/1/23 CY TBD Escalation 1/1/24 CY TBD Sales Tax Excluded from all pricing Terms Net 30 Silverback Concrete 6480 Southeast FL 26 Trenton, Florida 32693 352 350 1185 si Iverbackconcrete. co We've Got Your Back.