Contract 2023-047ADocuSign Envelope ID: 7848F668-5FE4-4F20-9392-20C7991A649E
2023-047
FIRST AMENDMENT TO AGREEMENT FOR
READY -MIX CONCRETE
THIS AMENDMENT is entered into as of this 181h day of April 2023 and is to that certain
Agreement No. 2020-39 dated June 16, 2020, hereinafter "the Agreement", by and between the
CITY OF CLERMONT, FLORIDA, a municipal corporation under the laws of the State of Florida
whose address is: 685 W. Montrose Street, Clermont, Florida, hereinafter referred to as "CITY'
and SOUTHERN CONCRETE PUMPING, INC. d/b/a SILVERBACK CONCRETE, whose
address is: 6480 Southeast FL 26, Trenton, FL 32693 hereinafter referred to as "CONTRACTOR".
The parties, in exchange for the mutual covenants contained herein and in the Agreement, agree
as follows:
1. This Amendment expressly modifies the Agreement and in the event of a conflict,
the terms and conditions of this Amendment shall prevail.
2. The Compensation Schedule referred to and incorporated into the Agreement is
hereby amended to reflect the new price changes as more particularly described in Attachment "A"
attached hereto and incorporated herein.
3. All other terms and conditions set forth in the Agreement shall remain in full force
and effect and unchanged as agreed to by the parties.
IN WITNESS WHEREOF, the parties hereto have executed this Amendment as of the
dates set forth below.
CITY OF CLERMONT
[DocuSigned by:
4 -(�"At,, — DS
431 F57D413554D6...
Freddy L. Suarez, Procurement $ervi(
ATTEST:
DocuSigned by:
T Aaw► y-4 Howe
3AD7F34905B344A...
Tracy Ackroyd Howe, City Clerk
DocuSign Envelope ID: 7848F668-5FE4-4F20-9392-20C7991A649E
SOUTHERN CONCRETE PUMPING, INC.
d/b/a SILVERBACK CONCRETE
DocuS ig^�.�
n`edb.�y:.�
'"N1�16w
By: E 9278D654BO
(Signature)
Print Name: Cree Nettleton
Title: Plant Manager
Date: 4/20/2023
2
DocuSign Envelope ID: 7848F668-5FE4-4F20-9392-20C7991A649E
Silverback
April 12, 2023
Mr. Suarez,
This is the pricing we talked about on the phone. The new pricing be low reflects the
increased cost of inputs. Please review and get back to me with your thoughts.
Thanks,
Cree Nettleton
Plant Manager
Silverback Concrete
3000 PSI CONCRETE Delivered/ Volumetric Truck
3000 PSI W/FIBER Delivered/ Volumetric Truck
3500 PSI CONCRETE Delivered/ Volumetric Truck
CY
$149.00
CY
$154,00
CY
$159.00
4000 PSI
Delivered/ Volumetric Truck
CY
$159.00
Flowable Fill Concrete (Excavatable)
Delivered/ Volumetric Truck
CY
$169.00
Flowable Fill Concrete (NON -
Excavatable) Delivered/ Volumetric Truck CY
2" Puma Mix Concrete Delivered/Volumetric Truck CY
$179.00
$154.00
ACCELERATE
Per 1%
$4.00
#89 Drain Field Rock 3/8"
picked up price
TN
$72.50
#57 Drain Field Rock 3/4"
picked up price
TN
$65.00
Concrete Sand
picked up price
TN
$50.00
1/4" #2 Rebar in 20 Foot Sections
Per FT
call for price
3/8" #3 Rebar in 20 Foot Sections
Per FT
call for price
1/2" #4 Rebar in 20 Foot Sections
Per FT
call for price
5/8" #5 Rebar in 20 Foot Sections
Per FT
call for price
1/2" x 4"x 10' Expansion Joint
Per
Section
call for price
Silverback Concrete
6480 Southeast FL 26 Trenton, Florida 32693
352 350 1185
si Iverbackconcrete. co
We've Got Your Back.
DocuSign Envelope ID: 7848F668-5FE4-4F20-9392-20C7991A649E
Delivery Fee per load
each
$110
Fiber 1.5/c
CY
$8.00
Fuel Surcharge per load
each
$50
Environmental Fee per load
each
$25
Minimum Load Fee 2.5c s
*Loads under 2.5cys will be
charged for 2.5c s
Extra Truck Time over 2 hours
$100
Weekend Loads Extra Charge per load
$250
Escalation 8/1/23
CY
TBD
Escalation 1/1/24
CY
TBD
Sales Tax Excluded from all pricing
Terms Net 30
Silverback Concrete
6480 Southeast FL 26 Trenton, Florida 32693
352 350 1185
si Iverbackconcrete. co
We've Got Your Back.