Contract 2022-009A CODocuSign Envelope ID: EABCD365-620E-4CAC-835E-6A624C6lD338 CHANGE ORDER FORM Contract / P.O. Number: 2022-009 / 20231577 Change Order Number: 19 Project Name: Construction of Public Works Facility Job Location: 12838 Hancock Road, Clermont, FL VENDOR INFORMATION: Company Name: Johnson-Laux Construction, LLC. Address: 650 Garden Commerce Parkway #100 Contact Name: Josh McLaney, Project Manager Bid Number: RFB 22-002 Change Order Date: Jan 25, 2024 Department: Public Services City, St., Zip: Winter Garden, FL 34787 Telephone:407-770-2180 DESCRIPTION OF CHANGE: Alteration, deviation, addition, or deletion caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary). Additive change order in the amount of $3,987.55 to cover the cost associated with the re -work of the catch basins area at the pre -wash. ITEM AMOUNT A. ORIGINAL CONTRACT VALUE: $ 13,591,878 B. AMOUNT OF THIS CHANGE ORDER: $ 3,987.55 Must be within the overall scope of services in accordance with contract specifications. C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): % 0.0% D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ -507,927.28 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $ -503,939.73 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 10% Maximum % -3.7% G. NEW CONTRACT VALUE (A+E) $ 13,087,938.27 This Change Order is not valid without the following signatures: DocuSigned by: cuSgned by: E bsLka" 1/25/2024 E�an,�' 40ASfft, 1/25/2024 1690F1F6C6U4A1. DA4AD24A7 CONTRACTOR Date PROJECT ARCHITECT / ENGINEER Date EDocuSigned by: DocuSigned by: Mt,S halW61(% 1/25/2024 4 atk" 1/25/2024 QRFrn1(.Q5RrR4F7 431F57D413554D6... DEPARTMENT DIRECTOR Date PROCUREMENT DIRECTOR / Date CITY MANAGER Council approval is required if change order(s): 1) exceeds $49,999; 2) exceeds the greater of $100,000 OR 10% of the original contract amount for construction projects; 3) the funds are not available in the approved budget for the department. CITY OF CLERMONT ATTEST: MAYOR Date CITY CLERK Date Rev. 1-1-2021 DocuSign Envelope ID: EABCD365-620B-4CAC-835E-6A624C61D338 650 Garden Commerce Pkwy Change Order Request JOHNSON illli LAUX Suite 100 COR #: 31-R1 C O N S T R U C T 10 N Winter Garden, FL 34787 COR Date: 1/7/24 (407) 770-2180 License CGC: 1519701 To: City of Clermont Project: City of Clermont, RFB 22-002, Construction of Public 685 W Montrose St Works Operations Facility - Rebid Clermont, FL 34711 PO # 2022-0129 The contractor agreed to perform and the owner agrees to pay for the following changes to the contract Description of Work: Modifications to Pre -Wash Catch Basins Toltec Construction Allowance for Steel Grates JLC Superintendent Bond GLInsurance OH&P Contribution by JLC Negative changes will lower the overall contracl price requiring no additional payment by owner. The original Contract Sum was: Net change by previous change orders: The Contract Sum prior to this Change Order: The Contract Sum will be changed by this Change Order The new Contract Sum including this Change Order will be The Contract Time will be changed by: Owner: Amount 6,846.46 450.00 340.00 43.76 36.46 260.87 -3,990.00 Requested Amount of Change: 1 3,987.551 Date: Contractor: Date: 13,591,878.00 -507,927.28 13,083,950.72 3,987.55 13,087,938.27 0 days DocuSign Envelope ID: EABCD365-620B-4CAC-835E-6A624C61D338 JOHNSON ems LAu C 0 i 5 L- R CJ C T I 0 N Date: 1/7/24-R1 Project: City of Clermont: RFB 22-002, Construction of Public Works Operations Facility -Rebid JLC Project #: 21101013 COR#: 31-R1 — Re -Work to Catch Basins at Pre -Wash This COR is presented to cover the cost associated with having to re -work the pre -wash catch basin areas, based upon the RFI response #130, received from the design team. As further explanation as to the basis of the change and associated back up is listed below: The below photo shows the current condition of the catch basin area at the pre -wash: These two catch basins were formed, poured and constructed with the details outlined on C-608 and AA-702. The depth of the catch basins were established and constructed using the rough scaled dimensions on the cross section of C-608. In the initial RFI question from JLC, the following questions were asked: 1. Please confirm the depth of the catch basin, as there is not dimensions listed on the contract documents 2. Please confirm the grate material SC 1 DocuSign Envelope ID: EABCD365-620E-4CAC-835E-6A624C61 D338 J UMN NUN-LAU A UUN N 1 KM l lUN The design team responded with the below and attached sketch, of modifications that need to be made to the pre -wash catch basins. [Attachment added by FOR liner Elev&tr AS M".t Shown Al pl— �, steel Grate CO. 1314- EXPANSioh Jorxr ~I c-i-v- F Set Inge. a2s=oor MLET PiPf top of slab at bottom of 4" pipe I 1 B" 3-1.5- DRAFT LIQUID DISCHARGE CHANNEL CATCH BASIN WITH RISER PIPE If the City wants JLC to proceed with making the modifications shown on the above sketch from the EOR, there will be additional costs associated to perform the following: 1. Rip out existing concrete around (2) catch basins 2. Re-form the catch basin areas in accordance with the revised sketch a. This work will have to be done by hand in order to not undermine existing concrete and infrastructure 3. Re -pour concrete in accordance with the revised sketch 4. Procure and install steel grates for the catch basin tops — these are not called out or specified on the contract documents The attached change order request #11 from Toltec Construction covers all concrete work associated with making these modifications. A sum of $450 is included in this change order request to procure steel grates for the catch basin tops. This change order will contractually change the project end date, to 1/31/24. If the change order is approved during the week of 1/8/24, this date will be accurate — this is the time needed to re -mobilize the concrete subcontractor back to site to perform this work. If not approved during the week of 1/8/24, the project schedule will extend by 18 calendar days from whatever date the CO is approved by COC. That new date will be the new contractual substantial completion date. SC 2 DocuSign Envelope ID: EABCD365-620E-4CAC-835E-6A624C61 D338 JUHN NUN-LAUA UUN N 1 KUU l lUN Thank you, Josh McLaney Project Manager SC 3 DocuSign Envelope ID: EABCD365-620E-4CAC-835E-6A624C61D338 JOHNSON.,ir. LAux 0\ S T R U f I j () 1 COR Breakdown Project: City of Clermont - Public Works Operations Facility COR #31-R1 - Modifications to Catch Basins at Pre -Wash Item Value Toltec Construction - Modifications to Concrete $ 6,846.46 Allowance for Steel Grates $ 450.00 Superintendent Time - 4 hours at $85 /hour $ 340.00 Contribution by JLC to split costs with COC $ (3,990.00) Bond GL Insurance Subtotal OH&P Total REMARKS: $ 43.76 $ 36.46 $ 3,726.68 $ 260.87 $ 3,987.55 Percentage DATE: January 7, 2024 1.20% 1.00% 7.00% JOHNSON - LAUX CONSTRUCTION General Contracting • Construction Management • Design -Build Services 650 Garden Commerce Parkway, Suite 100, Winter Garden, FL 34787 JOB # 21101013 (407) 770-2180 Phone - (407) 770-2181 Fax CGC1519701 DocuSign Envelope ID: EABCD365-620E-4CAC-835E-6A624C61D338 JOHNSON I]h LAUX Winter Garden Office Project: 21101013 City of Clermont Public Works 650 Garden Commerce Pkwy Ops C O N S `1' R U C 1 0 N Suite 100 12838 Hancock Road Winter Garden, Florida 34787 Clermont, Florida 34711 P: 407 770-2180 P: 407-770-2180 F: (407) 770-2181 F: 407-770-2181 RFI #130: Catch basin depth and grate material Status Open To Gary Kranston (Bentley Architects and Engineers) From Troy Mattson (Johnson-Laux Construction - Winter Garden) 650 Garden Commerce Parkway Suite 100 Winter Garden, Florida 34787 Date Initiated Jun 30, 2023 Due Date Jul 3, 2023 Location Project Stage Course of Construction Cost Impact TBD Schedule Impact TBD Spec Section Cost Code Drawing Number AA 702, C 608 Reference Linked Drawings Received From Troy Mattson (Johnson-Laux Construction - Winter Garden) Copies To Paul Erickson (City of Clermont), James Maiworm (City of Clermont), Carlos Rexach (Bentley Architects and Engineers), Jeremy Warner (A.D. Morgan) Activity Question Question from Troy Mattson Johnson-Laux Construction - Winter Garden on Friday, Jun 30, 2023 at 01:03 PM EDT please provide depth, JLC has requested 16" depth as this will have to be hand work to keep from undermining the concrete at either side of these locations. Please provide grate material. Attachments current condition at discharge channel.JPG, C 608.JPG, AA 702.JPG Official Response I Response from Gary Kranston Bentley Architects and Engineers on Sunday, Jul 9, 2023 at 07:20 AM EDT See response by Carlos Rexach. All Replies Response from Gary Kranston Bentley Architects and Engineers on Wednesday, Aug 9, 2023 at 10:08 AM EDT See response by Carlos Rexach. Response from Carlos Rexach Bentley Architects and Engineers on Wednesday, Aug 9, 2023 at 10:05 AM EDT Bentley takes no exception to constructing the catch basins as submitted in the 8.09.2023 attachment by Troy Mattson. Response from Troy Mattson Johnson-Laux Construction - Winter Garden on Wednesday, Aug 9, 2023 at 09:52 AM EDT Carlos I am suggesting this as the 12" diameter pipe is not a viable option with making a sealed connection to the 4" lateral Please advise Attachments Catch basin suggestion to response of RFI 130.PNG Winter Garden Office Page 1 of 2 Printed On: Aug 23, 2023 11:46 AM EDT DocuSign Envelope ID: EABCD365-620E-4CAC-835E-6A624C6lD338 RFI #130 - Catch basin depth and grate material Project: 21101013 City of Clermont Public Works Ops Response from Gary Kranston Bentley Architects and Engineers on Sunday, Jul 9, 2023 at 07:20 AM EDT See response by Carlos Rexach. Response from Carlos Rexach Bentley Architects and Engineers on Friday, Jul 7, 2023 at 11:34 AM EDT Per the 07.06.2023 email from the Contractor (attached), pipes SANP-150A through SANP-150C have been installed per contract documents. The structure depth may be reduced to a minimum of 16-inches. Provide a 12-inch diameter HDPE riser pipe at the center of the structure as shown in the attached sketch detail. Provide a steel grate per FDOT Standard Plan 425-041. Attachments RF I_130-Catch_basi n_depth_and_grate_material-EOR_Response. pdf Winter Garden Office Page 2 of 2 Printed On: Aug 23, 2023 11:46 AM EDT DocuSign Envelope ID: EABCD365-620E-4CAC-835E-6A624C61D338 COC Public Works - CO 11 RFI 130 Catch Basin Company Name: TOLTEC CONSTRUCTION Phone 407-645-26488 8/17/23 Street Address 334 EAST BAY STREET Email aaarciaatoltecconstruction City & State: WINTER GARDEN, FLORIDA 34787 Name Arturo Garcia Signature RFI 130 Catch Basin modifications. Includes demolition, formwork, rebar and concrete installation Scope of Work Unit of oty Unit Cost Total Amount Total Amount Measure Foreman Hr. 24 $55.17 $ 1,324.08 Journeyman Hr. 24 $42.70 $ 1,024.80 Annrentice Hr. 24 $33.66 $ 807.84 Subtotal Labor $ 3,156.72 Equipment Demo Saw & Blade EA EA 1 1 $275.00 $250.00 $ 275.00 $ 250.00 Concrete Buggie Subtotal Equipment $ 525.00 Tax Calculation - 0% on Equipment $ - Total Outside Rental Equipment with Tax $ 525.00 Materials ( Taxable ) Plywood Fabricated Rebar Epoxy Concrete material EA 4 $35.00 $ 140.00 Ton 0.25 $1,750.00 $ 437.50 EA 4 $45.00 $ 180.00 CY 7 $195.00 $ 1,365.00 Subtotal Materials $ 2,122.50 Tax Calculation - 7% on Materials $ 148.58 Total Materials with Tax $ 2,271.08 Subtotal of ALL Categories Above $ 5,952.80 Mark-up on Material, Equipment, and Labor 15.00% $ 6,846 TOTAL FOR PCO $ 6,846 1 of 1 Run Date 18_21_02 DocuSign Envelope ID: EABCD365-620E-4CAC-835E-6A624C61D338 a. m INS AT PRE WASH BLDG VARIES (019 M)N. OJ3 MAX.) TW 158,00 TW 158.00 4 3.25' i �FGBW 756.261 FG 155.25 � e > � in PRE -WASH CONCRETE SLAXSEE PRE -WASH NOTE 1) LIQUID DISCHARGE CHANNEL WALL AND FOOTING (SEE PRE -WASH NOTE 1) lop i I i I DISCHARGE CHANNEL CATCH I I BASIN STRUCTURE AND I DISCHARGE PIPE(PROJECTED) WINNIF1810 11 • d