Contract 2023-013A CODocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317
CHANGE ORDER FORM
Contract / P.O. Number: 2023-013 / 20234681
Change Order Number: 1
Project Name: Sunburst Lane Water Treatment
Job Location: Sunburst Lane, Clermont
VENDOR INFORMATION:
Company Name: L7 Construction, Inc.
Address: 275 Hunt Park Cove
Contact Name: Rachael Quinn
Bid Number: RFB 23-007
Change Order Date: Dec 7, 2023
Department: Public Services
City, St., Zip: Longwood, FL 32750
Telephone: (321) 972-9325
DESCRIPTION OF CHANGE:
Alteration, deviation, addition, or deletion caused by conditions encountered during construction not covered by the specifications and
drawings of the project (attach additional pages if necessary).
Recording change orders 1-10, 13-14 and adjusting the contract value deducting the total of $981,561.80. See
attached change orders for details.
ITEM
AMOUNT
A.
ORIGINAL CONTRACT VALUE:
$
6,946,700.00
B.
AMOUNT OF THIS CHANGE ORDER:
$
-981,561.80
Must be within the overall scope of services in accordance with contract specifications.
C.
PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A):
%
-14.1%
D.
AMOUNT OF PREVIOUS CHANGE ORDERS:
$
0.00
E.
TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D):
$
-981,561.80
F.
PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 10% Maximum
%
-14.1%
G.
NEW CONTRACT VALUE (A+E)
$
5,965,138.20
This Change
Order is not valid without the following signatures:
DocuSigned Eby: DocuSigned by:
&ulnl�' 12/7/2023 smwDv' 12/7/2023
C8CDE15F09824EA— SCOAFD666432440...
CONTRACTOR Date PROJECT ARCHITECT / ENGINEER Date
DocuSigned by: DocuSigned by:
�cuMt,S �lW61(% 12/8/2023 Sucre 12/8/2023
96E6D1C958C84E7... L431F57D413554D6...
DEPARTMENT DIRECTOR Date PROCUREMENT DIRECTOR / Date
CITY MANAGER
Council approval is required if change order(s): 1) exceeds $49,999; 2) exceeds the greater of $100,000 OR 10% of the original
contract amount for construction projects; 3) the funds are not available in the approved budget for the department.
CITY OF CLERMONT ATTEST:
MAYOR Date CITY CLERK
Date
Rev. 1-1-2021
DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317
L7 Construction, Inc.
275 Hunt Park Cove
Longwood, Florida 32750
Phone: (321) 972-9325
Fax: 407-732-7812
PCCO #001
Project: 22-039 - 22-039 Sunburst Lane WTP Improvements
3335 Hancock Road
Clermont, Florida 34711
Prime Contract Change Order #001: Deductive Change Order for
Watermain Tie-in
TO:
City of Clermont
FROM:
L7 Construction, Inc.
685 W. Montrose Street
275 Hunt Park Cove
Clermont, Florida 34711
Longwood, Florida 32750
DATE CREATED:
5/02/2023
CREATED BY:
Rachel Quinn (L7 Construction, Inc.)
CONTRACT STATUS:
Pending - In Review
REVISION:
0
REQUEST RECEIVED
LOCATION:
FROM:
DESIGNATED REVIEWER:
Rachel Quinn (L7 Construction, Inc.)
REVIEWED BY:
DUE DATE:
REVIEW DATE:
INVOICED DATE:
PAID DATE:
REFERENCE:
CHANGE REASON:
Client Request
PAID IN FULL:
No
EXECUTED:
No
ACCOUNTING METHOD:
Amount Based
SCHEDULE IMPACT.
SIGNED CHANGE ORDER
REVISED SUBSTANTIAL
RECEIVED DATE:
COMPLETION DATE:
FIELD CHANGE:
No
CONTRACT FOR:
1:Owner Contract
TOTAL AMOUNT:
($17,280.27)
DESCRIPTION:
Deductive Change Order for Watermain Tie-in
Deductive change order to remove the 16" x 20" MJ tie-in at the existing water main. This work was
already completed by the city.
This work is a deduct for the following:
• Install one (1) 16" MJ Tee in the existing water main
• Install one (1) 16" MJ Gate Valve
• Install one (1) 16" x 20" MJ Reducer
Install a section of 20" MJ pipe
Install one (1) 20" MJ Restrained Cap at the end of the new 20" MJ Pipe
Includes excavation, pressure testing, disinfection, and the asphalt repair
ATTACHMENTS:
The original (Contract Sum)
Net change by previously authorized Change Orders
The contract sum prior to this Change Order was
The contract sum would be changed by this Change Order in the amount of
The new contract sum including this Change Order will be
The contract time will not be changed by this Change Order.
$6,946,700.00
$0.00
$6,946,700.00
($17,280.27)
$6,929,419.73
L7 Construction, Inc. Page 1 of 2 Printed On: 5/5/2023 08:28 AM
DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317
Mike Scullion (HaW Associates, Inc.)
902 N. Sinclair Avenue
Tavares, Florida 32778 6.6.23
SIGNATURE DATE
City of Clermont
685 W. Montrose Street
Clermont, Florida 34711
SIGM TURE
PCCO #001
L7 Construction, Inc.
275 Hunt Park Cove
Longwood, Florida 32750
,9 '?q j2' Al,Q� 9/ 1 /23
DATE SIGNATURE DATE
L7 Construction, Inc. Page 2 of 2 Printed On: 5/5/2023 08:28 AM
DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317
L7 Construction, Inc.
275 Hunt Park Cove
Longwood, Florida 32750
Phone: (321) 972-9325
Fax: 407-732-7812
PCCO #002
Project: 22-039 - 22-039 Sunburst Lane WTP Improvements
3335 Hancock Road
Clermont, Florida 34711
Prime Contract Change Order #002: Deductive Change Order for Dirt
Already Removed by City at New GST
TO: City of Clermont
FROM:
L7 Construction, Inc.
685 W. Montrose Street
275 Hunt Park Cove
Clermont, Florida 34711
Longwood, Florida 32750
DATE CREATED: 5/02/2023
CREATED BY:
Rachel Quinn (11-7 Construction, Inc.)
CONTRACT STATUS: Pending - In Review
REVISION:
0
REQUEST RECEIVED
LOCATION:
FROM:
DESIGNATED REVIEWER: Rachel Quinn (1-7 Construction, Inc.)
REVIEWED BY:
DUE DATE:
REVIEW DATE:
INVOICED DATE:
PAID DATE:
REFERENCE:
CHANGE REASON:
Existing Condition
PAID IN FULL: No
EXECUTED:
No
ACCOUNTING METHOD: Amount Based
SCHEDULE IMPACT:
SIGNED CHANGE ORDER
REVISED SUBSTANTIAL
RECEIVED DATE:
COMPLETION DATE:
FIELD CHANGE: No
CONTRACT FOR:
1:Owner Contract
TOTAL AMOUNT.
($32,578.73)
DESCRIPTION:
Deductive Chance Order for Dirt Alreadv Removed by City_ at New GST
Deductive Change Order for Dirt Already Removed by City at the New Ground Storage Tank
Comparing the bid existing conditions versus the current conditions, per the survey information
provided by the owner/engineer, the city has already removed 6,608 CY.
This change event is for labor, materials, and equipment that would have been required to excavate
the 6,608 CY.
This deductive change order assumes the dirt would have been relocated to another location onsite.
ATTACHMENTS:
The original (Contract Sum)
Net change by previously authorized Change Orders
The contract sum prior to this Change Order was
The contract sum would be changed by this Change Order in the amount of
The new contract sum including this Change Order will be
The contract time will not be changed by this Change Order.
$6,946,700.00
$0.00
$6,946,700.00
($32,578.73)
$6,914,121.27
L7 Construction, Inc. Page 1 of 2 Printed On: 5/5/2023 08:26 AM
DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317
Mike Scullion (Halff Associates, Inc.)
902 N. Sinclair Avenue
Tavares, Florida 32778
6.6.23
SIGNATURE DATE
City of Clermont
685 W. Montrose Street
Clermont, Florida 34711
yo,
SIGNATURE
is Z`7r2 ?
DATE
PCCO #002
L7 Construction, Inc.
275 Hunt Park Cove
Longwood, Florida 32750
9/1 /23
SIGNATURE DATE
L7 Construction, Inc. Page 2 of 2 Printed On: 5/5/2023 08:26 AM
DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317
L7 Construction, Inc.
275 Hunt Park Cove
Longwood, Florida 32750
Phone: (321) 972-9325
Fax: 407-732-7812
PCCO #003
Project: 22-039 - 22-039 Sunburst Lane WTP Improvements
3335 Hancock Road
Clermont, Florida 34711
Prime Contract Change Order #003: Deductive Change Order for ODP
Orders- Pipe, Generator, Well
Pumps
TO: City of Clermont
FROM:
L7 Construction, Inc.
685 W Montrose Street
275 Hunt Park Cove
Clermont, Florida 34711
Longwood, Florida 32750
DATE CREATED: 5/02/2023
CREATED BY:
Rachel Quinn (11-7 Construction, Inc.)
CONTRACT STATUS: Pending - In Review
REVISION:
0
REQUEST RECEIVED
LOCATION:
FROM:
DESIGNATED REVIEWER: Rachel Quinn (11-7 Construction, Inc.)
REVIEWED BY:
DUE DATE:
REVIEW DATE:
INVOICED DATE:
PAID DATE:
REFERENCE:
CHANGE REASON:
ODP
PAID IN FULL: No
EXECUTED:
No
ACCOUNTING METHOD: Amount Based
SCHEDULE IMPACT:
0 days
SIGNED CHANGE ORDER
REVISED SUBSTANTIAL
RECEIVED DATE:
COMPLETION DATE:
FIELD CHANGE: No
CONTRACT FOR:
1:Owner Contract
TOTAL AMOUNT:
($1,040,970.15)
DESCRIPTION:
ODP Orders- Pipe. Generator, Well Pumps:
Deductive change order to switch the pipe, generator, and well pump orders to ODP orders.
ATTACHMENTS:
CHANGE ORDER LINE ITEMS:
f # Budget Code
1 63-15-1000.M PIPE. VALVES & FITTINGS.Materials
2 63-15-1000.M PIPE, VALVES & FITTINGS.Materials
3 63-15-1000.M PIPE, VALVES & FITTINGS.Materials
4 63-15-1000.M PIPE, VALVES & FITTINGS.Materials
5 63-16-2300.M GENERATOR.Materials
6 63-16-2300.M GENERATOR.Materials
7 63-16-2300.M GENERATOR.Materials
8 63-11-2100.M WELL PUMP C08 & C09.Materials
9 63-11-2100.M WELL PUMP C08 & C09.Materials
10 63-11-2100.M WELL PUMP C08 & C09.Materials
11 63-11-2100.M WELL PUMP C08 & C09.Materials
Description
ODP Order for Pipe
ODP Order for Pipe- Florida Tax (6%)
ODP Order for Pipe- Sur -Tax (1 % Maxed at first $5,000)
ODP Order for Pipe- (1-7 1 % Savings on Payment)
ODP Order for Generator
ODP Order for Generator- Florida Sales Tax (6%)
ODP Order for Generator- Sur -Tax (1% Maxed at first $5,000)
ODP Order for Well Pumps (Taxed Portion)
ODP Order for Well Pump- Florida Sales Tax (6%)
ODP Order for Well Pump- Sur -tax (1% Maxed at first $5,000)
ODP Order for Well Pump- Non -Taxed Services
Grand Total:
Amount)
$(431,040.20)1
$(25,862.42)1
$(50.00)
$4,569.531
$(190,335.00)I
1 $(11,420.10)Ij
$(50.00)
$(335,782.68)1
Ij $(20,146.96)
$(50.00) 1
$(30,802.32),
$(1,040,970.15)
L7 Construction, Inc. Page 1 of 2 Printed On: 5/18/2023 10:14 AM
DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317
7."
The original (Contract Sum)
Net change by previously authorized Change Orders
The contract sum prior to this Change Order was
The contract sum would be changed by this Change Order in the amount of
The new contract sum including this Change Order will be
The contract time will not be changed by this Change Order.
Mike Scullion (Halff Associates, Inc.)
902 N. Sinclair Avenue
Tavares, Florida 32778
SIGNATURE DATE
L7 Construction, Inc.
City of Clermont
685 W. Montrose Street
Clermont, Florida 34711
Page 2 of 2
PCCO #003
$6,946,700.00
$0.00
$6,946,700.00
($1,040,970.15)
$5,905,729.85
1-7 Construction, Inc.
275 Hunt Park Cove
Longwood, Florida 32750
- 1j•1i3 AZC,1� C�%u�- 9/1 /23
DATE SIGNATURE DATE
Printed On: 5/18/2023 10:14 AM
DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317
L7 Construction, Inc.
275 Hunt Park Cove
Longwood, Florida 32750
Phone: (321) 972-9325
Fax: 407-732-7812
PCCO #004
Project: 22-039 - 22-039 Sunburst Lane VI Improvements
3335 Hancock Road
Clermont, Florida 34711
Prime Contract Change Order #004: Deductive Change Order for MTE AP
Harmonic Filters for VFDs
TO:
City of Clermont
FROM:
L7 Construction, Inc.
685 W. Montrose Street
275 Hunt Park Cove
Clermont, Florida 34711
Longwood, Florida 32750
DATE CREATED:
5/26/2023
CREATED BY:
Rachel Quinn (11-7 Construction, Inc.)
CONTRACT STATUS:
Pending —In Review
REVISION:
0
REQUEST RECEIVED
LOCATION:
FROM:
DESIGNATED REVIEWER:
Rachel Quinn (11-7 Construction, Inc.)
REVIEWED BY:
DUE DATE:
REVIEW DATE:
INVOICED DATE:
PAID DATE:
REFERENCE:
CHANGE REASON:
Design Development
PAID IN FULL:
No
EXECUTED:
No
ACCOUNTING METHOD:
Amount Based
SCHEDULE IMPACT:
SIGNED CHANGE ORDER
REVISED SUBSTANTIAL
RECEIVED DATE:
COMPLETION DATE:
FIELD CHANGE:
No
CONTRACT FOR:
1:Owner Contract
TOTAL AMOUNT
($12,000.00)
DESCRIPTION:
Deductive Chanue Order for
MTE AP Harmonic Filters for VFD�
The City approves of the MTE AP Passive Finer with a $12,000.00 credit sent back to the City.
T
ATTACHMENTS:
The original (Contract Sum)
Net change by previously authorized Change Orders
The contract sum prior to this Change Order was
The contract sum would be changed by this Change Order in the amount of
The new contract sum including this Change Order will be
The contract time will not be changed by this Change Order.
Mike Scullion (Halff Associates, Inc.)
902 N. Sinclair Avenue
Tavares, Florida 32778
6.6.23
SIGNATURE DATE
City of Clermont
685 W. Montrose Street
Clermont, Florida 34711
C
J*k—
SIGNA RE
$6,946,700.00
$0.00
$6,946,700.00
($12,000.00)
$6,934,700.00
L7 Construction, Inc.
275 Hunt Park Cove
Longwood, Florida 32750
k-2�` AzcWzI QU"Z4- 9/1 /23
DATE SIGNATURE DATE
L7 Construction, Inc. Page 1 of 1 Printed On: 5/26/2023 09:17 AM
DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317
L7 Construction, Inc.
275 Hunt Park Cove
Longwood, Florida 32750
Phone: (321) 972-9325
Fax:407-732-7812
PCCO #005
Project: 22-039 - 22-039 Sunburst Lane WTP Improvements
3335 Hancock Road
Clermont, Florida 34711
Prime Contract Change Order #005: Chemical
PLC Replacement
TO: City of Clermont
FROM:
L7 Construction, Inc.
685 W. Montrose Street
275 Hunt Park Cove
Clermont, Florida 34711
Longwood, Florida 32750
DATE CREATED: 6/02/2023
CREATED BY:
Rachel Quinn (L7 Construction, Inc.)
CONTRACT STATUS: Pending - In Review
REVISION:
0
REQUEST RECEIVED
LOCATION:
FROM:
DESIGNATED REVIEWER: Rachel Quinn (L7 Construction, Inc.)
REVIEWED BY:
DUE DATE: 06/16/2023
REVIEW DATE:
INVOICED DATE:
PAID DATE:
REFERENCE:
CHANGE REASON:
Client Request
PAID IN FULL: No
EXECUTED:
No
ACCOUNTING METHOD: Amount Based
SCHEDULE IMPACT:
SIGNED CHANGE ORDER
REVISED SUBSTANTIAL
RECEIVED DATE:
COMPLETION DATE:
FIELD CHANGE: No
CONTRACT FOR:
1:Owner Contract
TOTAL AMOUNT:
$43,010.79
DESCRIPTION:
Chemical PLC ReQlacement
RE: TPC- Chemical PLC Replacement
Attention: Mark Griffin/Duane Lane
You have requested a quote for the following work:
1 Lot Engineering for procurement
1 PLC rack, 10 slot, Allen Bradley ControlLogix
• 1 Ethernet communication module, Allen Bradley ControlLogix
• 2 Digital input module, 16 point, Allen Bradley ControlLogix
• 1 Isolated relay output module, 16 point, Allen Bradley ControlLogix
• 1 Isolated analog input module, 8 point, Allen Bradley ControlLogix
• 1 Isolated analog output module, 8 point, Allen Bradley ControlLogix
• 5 1/0 module terminal block
PLC/HMI programming:
• PLC/HMI programming
• Field installation
Start-up and training
• System commissioning
Operational Readiness Test
• Field Acceptance Test
L7 Construction, Inc.
Page 1 of 2
Printed On: 6/2/2023 08:00 AM
DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317
PCCO #005
Submittals Operation & Maintenance Manuals
1-Year Warranty
• Factory Check Out
Freight to US destination
Services:
• Startup associated with the equipment and materials listed above.
• PLC and HMI Programming
• On -site testing
• Ethernet connection to existing network
Approximate schedule of the scope of work:
• There is no completion deadline. Work can be scheduled as mutually agreeable.
Submittals will be included with the rest of the project submittals, anticipating by/before 6/26.
• Parts will come with the rest of the parts for this project.
• The chemical PLC replacement will be integrated when the plant switch over is occurring. This
work will add about a day to the overall process.
• The new PLC at the chemical room will be controlled by the new master PLC involved in the
main scope of this project.
• The chemical PLC will be a remote 1/0 drop off of the master PLC.
Excludes:
• Temporary controls
Night work
L7 Construction, Inc. proposes to provide the above scope of work for the lump sum of $43,010.79. Fortv-
Three Thousand Ten Dollars and Seventv-Nine Cents.
ATTACHMENTS:
The original (Contract Sum)
Net change by previously authorized Change Orders
The contract sum prior to this Change Order was
The contract sum would be changed by this Change Order in the amount of
The new contract sum including this Change Order will be
The contract time will not be changed by this Change Order.
Mike Scullion (Halff Associates, Inc.)
902 N. Sinclair Avenue
Tavares, Florida 32778
SIGNATURE 6.15.2023 DATE
City of Clermont
685 W. Montrose Street
Clermont, Florida 34711
1
SIGNA�RE
L7 Construction, Inc. Page 2 of 2
$6,946,700.00
$0.00
$6,946,700.00
$43,010.79
$6,989,710.79
L7 Construction, Inc.
275 Hunt Park Cove
Longwood, Florida 32750
9/1 /23
DATE SIGNATURE DATE
Printed On: 6/2/2023 08:00AM
DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317
L7 Construction, Inc.
275 Hunt Park Cove
Longwood, Florida 32750
Phone: (321) 972-9325
Fax: 407-732-7812
PCCO #006
Project: 22-039 - 22-039 Sunburst Lane WTP Improvements
3335 Hancock Road
Clermont, Florida 34711
Prime Contract Change Order #006: Switch to US Pipe for Flanged Pipe
TO: City of Clermont
FROM: L7 Construction, Inc.
685 W. Montrose Street
275 Hunt Park Cove
Clermont, Florida 34711
Longwood, Florida 32750
DATE CREATED: 7/10/2023
CREATED BY: Rachel Quinn (11-7 Construction, Inc.)
CONTRACT STATUS: Pending - In Review
REVISION: 0
REQUEST RECEIVED
FROM:
DESIGNATED REVIEWER:
Rachel Quinn (11-7 Construction, Inc.)
DUE DATE:
07/21/2023
INVOICED DATE:
REFERENCE:
PAID IN FULL:
No
ACCOUNTING METHOD:
Amount Based
SIGNED CHANGE ORDER
RECEIVED DATE:
FIELD CHANGE:
No
LOCATION:
REVIEWED BY:
REVIEW DATE:
PAID DATE:
CHANGE REASON:
Client Request
EXECUTED:
No
SCHEDULE IMPACT:
0 days
REVISED SUBSTANTIAL
COMPLETION DATE:
CONTRACT FOR:
1:Owner Contract
TOTAL AMOUNT.
$7,726.47
DESCRIPTION:
Switch to US Pine for Flanged Pipe
This change order is an adder for switching from McWane pipe to US Pipe. McWane was listed in the specifications as an approved manufacturer,
however the city does not want to use this manufacturer. US Pipe will be supplying the flange pipe on this project.
ATTACHMENTS:
The original (Contract Sum)
Net change by previously authorized Change Orders
The contract sum prior to this Change Order was
The contract sum would be changed by this Change Order in the amount of
The new contract sum including this Change Order will be
The contract time will not be changed by this Change Order.
Mike Scullion (Halif Associates, Inc.)
902 N. Sinclair Avenue
Tavares, Florida 32778
SIGNATURE 7.14.23 DATE
City of Clermont
685 W. Montrose Street
Clermont, Florida 34711
H
) I'
SIGN
E
$6,946,700.00
($1,059,818.36)
$5,886,881.64
$7,726.47
$5,894,608.11
L7 Construction, Inc.
275 Hunt Park Cove
Longwood, Florida 32750
9/1 /23
DATE SIGNATURE DATE
L7 Construction, Inc. Page 1 of 1 Printed On: 7/10/2023 03:10 PM
DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317
L7 Construction, Inc.
275 Hunt Park Cove
Longwood, Florida 32750
Phone: (321) 972-9325
Fax: 407-732-7812
PCCO #007
Project: 22-039 - 22-039 Sunburst Lane WTP Improvements
3335 Hancock Road
Clermont, Florida 34711
Prime Contract Change Order #007: ODP Change Order for Switching the
Flanged Pipe from McWane to US Pipe
TO:
City of Clermont
FROM:
L7 Construction, Inc.
685 W. Montrose Street
275 Hunt Park Cove
Clermont, Florida 34711
Longwood, Florida 32750
DATE CREATED:
7/10/2023
CREATED BY.
Rachel Quinn (1-7 Construction, Inc.)
CONTRACT STATUS:
Pending - In Review
REVISION:
0
REQUEST RECEIVED
LOCATION:
FROM:
DESIGNATED REVIEWER:
REVIEWED BY:
DUE DATE:
07/21/2023
REVIEW DATE:
INVOICED DATE:
PAID DATE:
REFERENCE:
CHANGE REASON:
ODP
PAID IN FULL:
No
EXECUTED:
No
ACCOUNTING METHOD:
Amount Based
SCHEDULE IMPACT:
0 days
SIGNED CHANGE ORDER
REVISED SUBSTANTIAL
RECEIVED DATE:
COMPLETION DATE:
FIELD CHANGE:
No
CONTRACT FOR:
1:Owner Contract
TOTAL AMOUNT:
($6,048.74)
DESCRIPTION:
ODP Chance Order for Switching the Flan4ed Pi:ie from McWane to US Piste
Change order to deduct the ODP portion of the adder for switching from McWane to US Pipe for the Flange Pipe
ATTACHMENTS:
CHANGE ORDER LINE ITEMS:
# Budget Code Description
1 63-15-1000.M PIPE, VALVES & FITTINGS. Materials Deduct for ODP Portion of Adder for Switching from McWane to US
Pipe
2 63-15-1000.M PIPE, VALVES & FITTINGS. Materials 6% Florida Sales Tax (Sur -tax already capped)
3 63-15-1000.M PIPE, VALVES & FITTINGS. Materials ODP Order for Pipe- (1-7 1 % Savings on Payment)
Grand Total:
The original (Contract Sum)
Net change by previously authorized Change Orders
The contract sum prior to this Change Order was
The contract sum would be changed by this Change Order in the amount of
The new contract sum including this Change Order will be
The contract time will not be changed by this Change Order.
Amount
$(5,764.00)
$(345.84)
$61.10
$(6,048.74)
$6,946,700.00
($1,059,818.36)
$5,886,881.64
($6,048.74)
$5,880,832.90
L7 Construction, Inc. Pagel of 2 Printed On: 7/10/2023 03:14 PM
DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317
Mike Scullion (HaW Associates, Inc.)
902 N. Sinclair Avenue
Tavares, Florida 32778
SIGNATURE DATE
7.14.23
City of Clermont
685 W. Montrose Street
Clermont, Florida 34711
MCA I')
SIGN RE DATE
L7 Construction, Inc. Page 2 of 2
PCCO #007
L7 Construction, Inc.
275 Hunt Park Cove
Longwood, Florida 32750
9/1 /23
SIGNATURE DATE
Printed On: 7/10/2023 03:14 PM
DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317
Y,.,PCCO #008
L7 Construction, Inc. Project: 22-039 - 22-039 Sunburst Lane WTP Improvements
275 Hunt Park Cove 3335 Hancock Road
Longwood, Florida 32750 Clermont, Florida 34711
Phone: (321) 972-9325
Fax:407-732-7812
Prime Contract Change Order #008: Deductive Change Order for Value
Engineering Roof Option
TO: City of Clermont
FROM:
L7 Construction, Inc.
685 W. Montrose Street
275 Hunt Park Cove
Clermont, Florida 34711
Longwood, Florida 32750
DATE CREATED: 8/25/2023
CREATED BY:
Rachel Quinn (11-7 Construction, Inc.)
CONTRACT STATUS: Pending - In Review
REVISION:
0
REQUEST RECEIVED
LOCATION:
FROM:
DESIGNATED REVIEWER: Rachel Quinn (1-7 Construction, Inc.)
REVIEWED BY:
DUE DATE:
REVIEW DATE:
INVOICED DATE:
PAID DATE:
REFERENCE:
CHANGE REASON:
Design Development
PAID IN FULL: No
EXECUTED:
No
ACCOUNTING METHOD: Amount Based
SCHEDULE IMPACT:
0 days
SIGNED CHANGE ORDER
REVISED SUBSTANTIAL
RECEIVED DATE:
COMPLETION DATE:
FIELD CHANGE: No
CONTRACT FOR:
1:Owner Contract
TOTAL AMOUNT:
($10,000.00)
DESCRIPTION:
Deductive Change Order for Value Engineerirr-i Roof Option
`Deductive change order for the value engineer option of using a 24-gauge Painted Galvalume metal roof with 1" rib with striations and snap locking
mechanism. (Reference submittal D-07411-001-A)
ATTACHMENTS:
07411-001-A Roofing for Well Houses ftprovedl,pdf
The original (Contract Sum)
Net change by previously authorized Change Orders
The contract sum prior to this Change Order was
The contract sum would be changed by this Change Order in the amount of
The new contract sum including this Change Order will be
The contract time will not be changed by this Change Order.
Mike Scullion (Halff Associates, Inc.)
902 N. Sinclair Avenue
Tavares, Florida 32778
W
SIGNATURE g 28 23 DATE
L7 Construction, Inc.
$6,946,700.00
($1,059,818.36)
$5,886,881.64
($10,000.00)
$5,876,881.64
City of Clermont L7 Construction, Inc.
685 W. Montrose Street 275 Hunt Park Cove
Clermont, Florida 34711 Longwood, Florida 32750
4-S-2 5
SIGGN RE DATE SIGNATURE DATE
Page 1 of 1 Printed On: 8/25/2023 03:22 PM
DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317
L7 Construction, Inc.
275 Hunt Park Cove
Longwood, Florida 32750
Phone: (321) 972-9325
Fax: 407-732-7812
PCCO #009
Project: 22-039 - 22-039 Sunburst Lane WTP Improvements
3335 Hancock Road
Clermont, Florida 34711
Prime Contract Change Order #009: Sheet Piles for the West Side of the
New Ground Storage Tank
TO: City of Clermont
685 W. Montrose Street
Clermont, Florida 34711
DATE CREATED: 8/29/2023
FROM: L7 Construction, Inc.
275 Hunt Park Cove
Longwood, Florida 32750
CREATED BY:
CONTRACT STATUS: Pending - In Review REVISION:
REQUEST RECEIVED LOCATION:
FROM:
Rachel Quinn (11-7 Construction, Inc.)
0
DESIGNATED REVIEWER: Rachel Quinn (1-7 Construction, Inc.)
REVIEWED BY:
DUE DATE:
09/08/2023
REVIEW DATE:
INVOICED DATE:
PAID DATE:
REFERENCE:
CHANGE REASON:
Design Development
PAID IN FULL:
No
EXECUTED:
No
ACCOUNTING METHOD:
Amount Based
SCHEDULE IMPACT:
0 days
SIGNED CHANGE ORDER
REVISED SUBSTANTIAL
RECEIVED DATE:
COMPLETION DATE:
FIELD CHANGE:
No
CONTRACT FOR:
):Owner Contract
TOTAL AMOUNT.
$75,522.18
DESCRIPTION:
Sheet Piles for the West Side of the New Ground Storaoe Tank
From the original design, the 24" water main running between the fence and the new ground storage tank was supposed to be relocated to allow
access for Precon's working road. The intent was to slope the area to get the required elevations we need at that time. Upon further exploration it was
discovered that the 24" water main is not in the working road footprint anymore and no longer has to be relocated. We also discovered a duct bank in
this area that was not shown on the drawings. It runs parallel with the fence and has been determined that it feeds power to the existing well house. To
protect these utilities during the new ground storage tank installation, sheet piles will be required to maintain the required slopes.
The intent is to install 114 lineal feet of sheet piles, approximately thirty feet tall, to protect the existing utilities. The sheet piles will be rented for nine
months to allow for the installation of the ground storage tank. Once the tank is leak tested, the area will be backfilled and the sheet piles will be
removed.
From not having to relocate the pipe, the city is saving $106,792.80. This value was deducted from our contract in change order #001, for the owner
direct purchase of the pipe materials. As the city is saving money from not having to relocate the pipe, we are asking for additional compensation for
the sheet piles required to protect the 24" water main that is no longer being relocated, as well as the existing well house power duct bank that was not
shown on the drawings.
We propose to provide the labor, materials, and equipment to install the sheet piles for a duration of nine months for the lump sum value of $76.522.18
!Seventy -Five Thousand Five Hundred Twenty-7Wvo Dollars and Eiuhteen-Cents).
After this cost, the city is still saving $31,240.20 from not having to relocate the pipe.
List of pipe materials not being used for the relocation resulting in the $106,792.80 savings:
Description Quantit Unit
16" MJ 90 1 EA
24" x 16" MJ Tee 1 Fes,
24" MJ 45s 2 EA
16" MJ 45s 13 f EA t
L7 Construction, Inc. Page 1 of 2 Printed On: 8/30/2023 10:08 AM
DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317
X7-
PCCO #009
20" x 24" MJ Reducer
] 1
EA
24" x 12" MJ Tee
] 1
I EA
16" MJ Gate Valve
] 1
EA
24" MJ 45s
] 2
EA
12" MJ Gate Valve
1
EA
12" MJ Sleeve
I 1
EA
16" Megalug Kits
12
EA
24" Megalug Kits
13
EA
12" Megalug Kits
5
EA
24" Gripper Gaskets- Fast -grip 6
EA
24" MJ Pipe-Fastite
100
LF
24" MJ Pipe- Fastite- GFL
60
LF
16" Megalug Kits
10
EA
12" MJ Spool- PE x PE -GFL
1
EA
16" Gripper Gaskets
3
EA
16" MJ Pipe
60
LF
16" MJ Pipe-GFL
40
LF
24" MJ Gate Valves
2
EA
ATTACHMENTS:
The original (Contract Sum) $6,946,700.00
Net change by previously authorized Change Orders ($1,059,818.36)
The contract sum prior to this Change Order was $5,886,881.64
The contract sum would be changed by this Change Order in the amount of $75,522.18
The new contract sum including this Change Order will be $5,962,403.82
The contract time will not be changed by this Change Order.
Mike Scullion (Halff Associates, Inc.) City of Clermont L7 Construction, Inc.
902 N. Sinclair Avenue 685 W. Montrose Street 275 Hunt Park Cove
Tavares, Florida 32778 Clermont, Florida 34711 Longwood, Florida 32750
( 9.6.23
SIGNATURE DATE 'SIGN' URE DATE SIGNATURE DATE
L7 Construction, Inc. Page 2 of 2 Printed On: 8/30/2023 10:08 AM
DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317 d r �N w
�IIII� Ngl j� II .' z
411 zIm
4 iL
✓� jf f 11 f '.
/-=_= j III
it
I
0
z
N
z
0
00
t-. U
Z
8 a:
cr-CC
a�
0ZZ
g�0
y0
a 0
DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317
L7 Construction, Inc.
275 Hunt Park Cove
Longwood, Florida 32750
Phone: (321) 972-9325
Fax: 407-732-7812
PCCO #010
Project: 22-039 - 22-039 Sunburst Lane WTP Improvements
3335 Hancock Road
Clermont, Florida 34711
Prime Contract Change Order #010: Electrical Drawing Modifications -
Contract #2023-013
TO:
City of Clermont
FROM:
L7 Construction, Inc.
685 W. Montrose Street
275 Hunt Park Cove
Clermont, Florida 34711
Longwood, Florida 32750
DATE CREATED:
9/01/2023
CREATED BY:
Rachel Quinn (1-7 Construction, Inc.)
CONTRACT STATUS:
Pending - In Review
REVISION:
0
REQUEST RECEIVED
LOCATION:
FROM:
DESIGNATED REVIEWER:
Rachel Quinn (11-7 Construction, Inc.)
REVIEWED BY:
DUE DATE:
09/15/2023
REVIEW DATE:
INVOICED DATE:
PAID DATE:
REFERENCE:
CHANGE REASON:
Design Development
PAID IN FULL:
No
EXECUTED:
No
ACCOUNTING METHOD:
Amount Based
SCHEDULE IMPACT:
0 days
SIGNED CHANGE ORDER
REVISED SUBSTANTIAL
RECEIVED DATE:
COMPLETION DATE:
FIELD CHANGE:
No
CONTRACT FOR:
1:Owner Contract
TOTAL AMOUNT:
$6,830.42
DESCRIPTION:
Electrical Drawinu Modifications
"Change proposal for the modifications made to the electrical drawings dated 8/17/23.
'At both well houses, a disconnect was added where the fan circuits were.
'At the generator a new 10 kVA transformer, with disconnect and rack was added.
ATTACHMENTS:
SS BEC Permitting Set Clermont Sunburst WTP.odf
The original (Contract Sum)
Net change by previously authorized Change Orders
The contract sum prior to this Change Order was
The contract sum would be changed by this Change Order in the amount of
The new contract sum including this Change Order will be
The contract time will not be changed by this Change Order.
Mike Scullion (Halff Associates, Inc.)
902 N. Sinclair Avenue
Tavares, Florida 32778
r . 9.6.23
SIGNATURE DATE
City of Clermont
685 W. Montrose Street
Clermont, Florida 34711
SIGNXUURRE
1-1\�-'1
L7 Construction, Inc. Page 1 of 1
$6,946,700.00
($1,059,818.36)
$5,886,881.64
$6,830.42
$5,893,712.06
L7 Construction, Inc.
275 Hunt Park Cove
Longwood, Florida 32750
DATE SIGNATURE DATE
Printed On: 9/1/2023 02:47 PM
DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317
SNOl1VIA3N13SV T S108WAS
'S310N IVOIN10313 I INO I1, 3%)
S1N3W3AOHMI \U
'dTM 3NVl isun9Nns
.� VCHWO-WINOM31020AU0
Ia
N
lid
lit 3 Nil
_ 14 d • n d 1. d o 1 _ d = d
sxruczse ae �ru •weu'r...n .: � W >7
���►�H C••
V.,.,�
"Fy s°�y
to
d
a�g�' �€
<I I blr a 6� a g Et Egi I E I § Is elgg Om I Rm 5nInIing-uw6mrIisaII� ;01-�lt3E g ;DI.
ru
u,
0
w
z
a
DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317
L7 Construction, Inc.
275 Hunt Park Cove
Longwood, Florida 32750
Phone: (321) 972-9325
Fax: 407-732-7812
PCCO #013
Project: 22-039 - 22-039 Sunburst Lane WTP Improvements
3335 Hancock Road
Clermont, Florida 34711
Prime Contract Change Order #013: Change in Existing Conditions for
24" Effluent Pipe
TO:
City of Clermont
FROM:
L7 Construction, Inc.
685 W. Montrose Street
275 Hunt Park Cove
Clermont, Florida 34711
Longwood, Florida 32750
DATE CREATED:
11/02/2023
CREATED BY:
Rachel Quinn (11-7 Construction, Inc.)
CONTRACT STATUS:
Pending - In Review
REVISION:
0
REQUEST RECEIVED
LOCATION:
FROM:
DESIGNATED REVIEWER:
Rachel Quinn (11-7 Construction, Inc.)
REVIEWED BY.
DUE DATE:
11/06/2023
REVIEW DATE:
INVOICED DATE:
PAID DATE:
REFERENCE:
CHANGE REASON:
Existing Condition
PAID IN FULL:
No
EXECUTED:
No
ACCOUNTING METHOD:
Amount Based
SCHEDULE IMPACT:
0 days
SIGNED CHANGE ORDER
REVISED SUBSTANTIAL
RECEIVED DATE:
COMPLETION DATE:
FIELD CHANGE:
No
CONTRACT FOR:
1:Owner Contract
TOTAL AMOUNT:
$11,454.50
DESCRIPTION:
Change in Existing Conditions for 24" Effluent Piffle
Per the discussion regarding RFI #12 on the existing versus new tank elevations, we discovered the existing 24" effluent pipe has a centerline elevation
of 215.19. With the new proposed tank design, the new centerline elevation is 218.10. To make up the difference in the 24" effluent line we are
proposing to add two (2) 24" 45-degree fittings.
This change order does not include changes to the influent pipe nor tank, after our evaluation we will send a separate change order listing
deducts/adders for those items.
ATTACHMENTS:
The original (Contract Sum)
Net change by previously authorized Change Orders
The contract sum prior to this Change Order was
The contract sum would be changed by this Change Order in the amount of
The new contract sum including this Change Order will be
The contract time will not be changed by this Change Order.
Mike Scullion (Halff Associates, Inc.)
902 N. Sinclair Avenue
Tavares, Florida 32778
11.27.23
SIGNATURE DATE
City of Clermont
685 W. Montrose Street
Clermont, Florida 34711
*iGNAT DATE
L7 Construction, Inc. Page 1 of 1
$6,946,700.00
($992,618.45)
$5,954,081.55
$11,454.50
$5,965,536.05
L7 Construction, Inc.
275 Hunt Park Cove
Longwood, Florida 32750
SIGNATURE DATE
Printed On: 11/2/2023 04:08 PM
DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317
L7 Construction, Inc.
275 Hunt Park Cove
Longwood, Florida 32750
Phone: (321) 972-9325
Fax: 407-732-7812
PCCO #014
Project: 22-039 - 22-039 Sunburst Lane WTP Improvements
3335 Hancock Road
Clermont, Florida 34711
Prime Contract Change Order #014: ODP- Pipe Materials for 24" Effluent
Line
TO:
City of Clermont
FROM:
L7 Construction, Inc.
685 W. Montrose Street
275 Hunt Park Cove
Clermont, Florida 34711
Longwood, Florida 32750
DATE CREATED:
11/02/2023
CREATED BY:
Rachel Quinn (1-7 Construction, Inc.)
CONTRACT STATUS:
Pending - In Review
REVISION:
0 `
REQUEST RECEIVED
LOCATION:
FROM:
DESIGNATED REVIEWER:
Rachel Quinn (11-7 Construction, Inc.)
REVIEWED BY:
DUE DATE:
11/03/2023
REVIEW DATE:
INVOICED DATE:
PAID DATE:
REFERENCE:
CHANGE REASON:
Existing Condition
PAID IN FULL:
No
EXECUTED:
No
ACCOUNTING METHOD:
Amount Based
SCHEDULE IMPACT:
0 days
SIGNED CHANGE ORDER
REVISED SUBSTANTIAL
RECEIVED DATE:
COMPLETION DATE:
FIELD CHANGE:
No
CONTRACT FOR:
1:Owner Contract
TOTAL AMOUNT:
($7,228.27)
DESCRIPTION:
ODP- Pig ra Materials for 24" Effluent Line
Change order to deduct the ODP portion of the adder for adding the two
24" 45-degree fittings on the 24" effluent pipe due to the existing centerline
elevation.
ATTACHMENTS:
The original (Contract Sum)
Net change by previously authorized Change Orders
The contract sum prior to this Change Order was
The contract sum would be changed by this Change Order in the amount of
The new contract sum including this Change Order will be
The contract time will not be changed by this Change Order.
Mike Scullion (HaW Associates, Inc.)
902 N. Sinclair Avenue
Tavares, Florida 32778
11.27.23
City of Clermont
685 W. Montrose Street
Clermont, Florida 34711
[2Z----
00"K
SIG *AURAE
'" �
L7 Construction, Inc. Page 1 of 1
$6,946,700.00
($992,618.45)
$5,954,081.55
($7,228.27)
$5,946,853.28
L7 Construction, Inc.
275 Hunt Park Cove
Longwood, Florida 32750
DATE SIGNATURE DATE