Contract 2023-013A CODocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317 CHANGE ORDER FORM Contract / P.O. Number: 2023-013 / 20234681 Change Order Number: 1 Project Name: Sunburst Lane Water Treatment Job Location: Sunburst Lane, Clermont VENDOR INFORMATION: Company Name: L7 Construction, Inc. Address: 275 Hunt Park Cove Contact Name: Rachael Quinn Bid Number: RFB 23-007 Change Order Date: Dec 7, 2023 Department: Public Services City, St., Zip: Longwood, FL 32750 Telephone: (321) 972-9325 DESCRIPTION OF CHANGE: Alteration, deviation, addition, or deletion caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary). Recording change orders 1-10, 13-14 and adjusting the contract value deducting the total of $981,561.80. See attached change orders for details. ITEM AMOUNT A. ORIGINAL CONTRACT VALUE: $ 6,946,700.00 B. AMOUNT OF THIS CHANGE ORDER: $ -981,561.80 Must be within the overall scope of services in accordance with contract specifications. C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): % -14.1% D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 0.00 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $ -981,561.80 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 10% Maximum % -14.1% G. NEW CONTRACT VALUE (A+E) $ 5,965,138.20 This Change Order is not valid without the following signatures: DocuSigned Eby: DocuSigned by: &ulnl�' 12/7/2023 smwDv' 12/7/2023 C8CDE15F09824EA— SCOAFD666432440... CONTRACTOR Date PROJECT ARCHITECT / ENGINEER Date DocuSigned by: DocuSigned by: �cuMt,S �lW61(% 12/8/2023 Sucre 12/8/2023 96E6D1C958C84E7... L431F57D413554D6... DEPARTMENT DIRECTOR Date PROCUREMENT DIRECTOR / Date CITY MANAGER Council approval is required if change order(s): 1) exceeds $49,999; 2) exceeds the greater of $100,000 OR 10% of the original contract amount for construction projects; 3) the funds are not available in the approved budget for the department. CITY OF CLERMONT ATTEST: MAYOR Date CITY CLERK Date Rev. 1-1-2021 DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 Phone: (321) 972-9325 Fax: 407-732-7812 PCCO #001 Project: 22-039 - 22-039 Sunburst Lane WTP Improvements 3335 Hancock Road Clermont, Florida 34711 Prime Contract Change Order #001: Deductive Change Order for Watermain Tie-in TO: City of Clermont FROM: L7 Construction, Inc. 685 W. Montrose Street 275 Hunt Park Cove Clermont, Florida 34711 Longwood, Florida 32750 DATE CREATED: 5/02/2023 CREATED BY: Rachel Quinn (L7 Construction, Inc.) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED LOCATION: FROM: DESIGNATED REVIEWER: Rachel Quinn (L7 Construction, Inc.) REVIEWED BY: DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: REFERENCE: CHANGE REASON: Client Request PAID IN FULL: No EXECUTED: No ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT. SIGNED CHANGE ORDER REVISED SUBSTANTIAL RECEIVED DATE: COMPLETION DATE: FIELD CHANGE: No CONTRACT FOR: 1:Owner Contract TOTAL AMOUNT: ($17,280.27) DESCRIPTION: Deductive Change Order for Watermain Tie-in Deductive change order to remove the 16" x 20" MJ tie-in at the existing water main. This work was already completed by the city. This work is a deduct for the following: • Install one (1) 16" MJ Tee in the existing water main • Install one (1) 16" MJ Gate Valve • Install one (1) 16" x 20" MJ Reducer Install a section of 20" MJ pipe Install one (1) 20" MJ Restrained Cap at the end of the new 20" MJ Pipe Includes excavation, pressure testing, disinfection, and the asphalt repair ATTACHMENTS: The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. $6,946,700.00 $0.00 $6,946,700.00 ($17,280.27) $6,929,419.73 L7 Construction, Inc. Page 1 of 2 Printed On: 5/5/2023 08:28 AM DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317 Mike Scullion (HaW Associates, Inc.) 902 N. Sinclair Avenue Tavares, Florida 32778 6.6.23 SIGNATURE DATE City of Clermont 685 W. Montrose Street Clermont, Florida 34711 SIGM TURE PCCO #001 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 ,9 '?q j2' Al,Q� 9/ 1 /23 DATE SIGNATURE DATE L7 Construction, Inc. Page 2 of 2 Printed On: 5/5/2023 08:28 AM DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 Phone: (321) 972-9325 Fax: 407-732-7812 PCCO #002 Project: 22-039 - 22-039 Sunburst Lane WTP Improvements 3335 Hancock Road Clermont, Florida 34711 Prime Contract Change Order #002: Deductive Change Order for Dirt Already Removed by City at New GST TO: City of Clermont FROM: L7 Construction, Inc. 685 W. Montrose Street 275 Hunt Park Cove Clermont, Florida 34711 Longwood, Florida 32750 DATE CREATED: 5/02/2023 CREATED BY: Rachel Quinn (11-7 Construction, Inc.) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED LOCATION: FROM: DESIGNATED REVIEWER: Rachel Quinn (1-7 Construction, Inc.) REVIEWED BY: DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: REFERENCE: CHANGE REASON: Existing Condition PAID IN FULL: No EXECUTED: No ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: SIGNED CHANGE ORDER REVISED SUBSTANTIAL RECEIVED DATE: COMPLETION DATE: FIELD CHANGE: No CONTRACT FOR: 1:Owner Contract TOTAL AMOUNT. ($32,578.73) DESCRIPTION: Deductive Chance Order for Dirt Alreadv Removed by City_ at New GST Deductive Change Order for Dirt Already Removed by City at the New Ground Storage Tank Comparing the bid existing conditions versus the current conditions, per the survey information provided by the owner/engineer, the city has already removed 6,608 CY. This change event is for labor, materials, and equipment that would have been required to excavate the 6,608 CY. This deductive change order assumes the dirt would have been relocated to another location onsite. ATTACHMENTS: The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. $6,946,700.00 $0.00 $6,946,700.00 ($32,578.73) $6,914,121.27 L7 Construction, Inc. Page 1 of 2 Printed On: 5/5/2023 08:26 AM DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317 Mike Scullion (Halff Associates, Inc.) 902 N. Sinclair Avenue Tavares, Florida 32778 6.6.23 SIGNATURE DATE City of Clermont 685 W. Montrose Street Clermont, Florida 34711 yo, SIGNATURE is Z`7r2 ? DATE PCCO #002 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 9/1 /23 SIGNATURE DATE L7 Construction, Inc. Page 2 of 2 Printed On: 5/5/2023 08:26 AM DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 Phone: (321) 972-9325 Fax: 407-732-7812 PCCO #003 Project: 22-039 - 22-039 Sunburst Lane WTP Improvements 3335 Hancock Road Clermont, Florida 34711 Prime Contract Change Order #003: Deductive Change Order for ODP Orders- Pipe, Generator, Well Pumps TO: City of Clermont FROM: L7 Construction, Inc. 685 W Montrose Street 275 Hunt Park Cove Clermont, Florida 34711 Longwood, Florida 32750 DATE CREATED: 5/02/2023 CREATED BY: Rachel Quinn (11-7 Construction, Inc.) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED LOCATION: FROM: DESIGNATED REVIEWER: Rachel Quinn (11-7 Construction, Inc.) REVIEWED BY: DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: REFERENCE: CHANGE REASON: ODP PAID IN FULL: No EXECUTED: No ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: 0 days SIGNED CHANGE ORDER REVISED SUBSTANTIAL RECEIVED DATE: COMPLETION DATE: FIELD CHANGE: No CONTRACT FOR: 1:Owner Contract TOTAL AMOUNT: ($1,040,970.15) DESCRIPTION: ODP Orders- Pipe. Generator, Well Pumps: Deductive change order to switch the pipe, generator, and well pump orders to ODP orders. ATTACHMENTS: CHANGE ORDER LINE ITEMS: f # Budget Code 1 63-15-1000.M PIPE. VALVES & FITTINGS.Materials 2 63-15-1000.M PIPE, VALVES & FITTINGS.Materials 3 63-15-1000.M PIPE, VALVES & FITTINGS.Materials 4 63-15-1000.M PIPE, VALVES & FITTINGS.Materials 5 63-16-2300.M GENERATOR.Materials 6 63-16-2300.M GENERATOR.Materials 7 63-16-2300.M GENERATOR.Materials 8 63-11-2100.M WELL PUMP C08 & C09.Materials 9 63-11-2100.M WELL PUMP C08 & C09.Materials 10 63-11-2100.M WELL PUMP C08 & C09.Materials 11 63-11-2100.M WELL PUMP C08 & C09.Materials Description ODP Order for Pipe ODP Order for Pipe- Florida Tax (6%) ODP Order for Pipe- Sur -Tax (1 % Maxed at first $5,000) ODP Order for Pipe- (1-7 1 % Savings on Payment) ODP Order for Generator ODP Order for Generator- Florida Sales Tax (6%) ODP Order for Generator- Sur -Tax (1% Maxed at first $5,000) ODP Order for Well Pumps (Taxed Portion) ODP Order for Well Pump- Florida Sales Tax (6%) ODP Order for Well Pump- Sur -tax (1% Maxed at first $5,000) ODP Order for Well Pump- Non -Taxed Services Grand Total: Amount) $(431,040.20)1 $(25,862.42)1 $(50.00) $4,569.531 $(190,335.00)I 1 $(11,420.10)Ij $(50.00) $(335,782.68)1 Ij $(20,146.96) $(50.00) 1 $(30,802.32), $(1,040,970.15) L7 Construction, Inc. Page 1 of 2 Printed On: 5/18/2023 10:14 AM DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317 7." The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. Mike Scullion (Halff Associates, Inc.) 902 N. Sinclair Avenue Tavares, Florida 32778 SIGNATURE DATE L7 Construction, Inc. City of Clermont 685 W. Montrose Street Clermont, Florida 34711 Page 2 of 2 PCCO #003 $6,946,700.00 $0.00 $6,946,700.00 ($1,040,970.15) $5,905,729.85 1-7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 - 1j•1i3 AZC,1� C�%u�- 9/1 /23 DATE SIGNATURE DATE Printed On: 5/18/2023 10:14 AM DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 Phone: (321) 972-9325 Fax: 407-732-7812 PCCO #004 Project: 22-039 - 22-039 Sunburst Lane VI Improvements 3335 Hancock Road Clermont, Florida 34711 Prime Contract Change Order #004: Deductive Change Order for MTE AP Harmonic Filters for VFDs TO: City of Clermont FROM: L7 Construction, Inc. 685 W. Montrose Street 275 Hunt Park Cove Clermont, Florida 34711 Longwood, Florida 32750 DATE CREATED: 5/26/2023 CREATED BY: Rachel Quinn (11-7 Construction, Inc.) CONTRACT STATUS: Pending —In Review REVISION: 0 REQUEST RECEIVED LOCATION: FROM: DESIGNATED REVIEWER: Rachel Quinn (11-7 Construction, Inc.) REVIEWED BY: DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: REFERENCE: CHANGE REASON: Design Development PAID IN FULL: No EXECUTED: No ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: SIGNED CHANGE ORDER REVISED SUBSTANTIAL RECEIVED DATE: COMPLETION DATE: FIELD CHANGE: No CONTRACT FOR: 1:Owner Contract TOTAL AMOUNT ($12,000.00) DESCRIPTION: Deductive Chanue Order for MTE AP Harmonic Filters for VFD� The City approves of the MTE AP Passive Finer with a $12,000.00 credit sent back to the City. T ATTACHMENTS: The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. Mike Scullion (Halff Associates, Inc.) 902 N. Sinclair Avenue Tavares, Florida 32778 6.6.23 SIGNATURE DATE City of Clermont 685 W. Montrose Street Clermont, Florida 34711 C J*k— SIGNA RE $6,946,700.00 $0.00 $6,946,700.00 ($12,000.00) $6,934,700.00 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 k-2�` AzcWzI QU"Z4- 9/1 /23 DATE SIGNATURE DATE L7 Construction, Inc. Page 1 of 1 Printed On: 5/26/2023 09:17 AM DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 Phone: (321) 972-9325 Fax:407-732-7812 PCCO #005 Project: 22-039 - 22-039 Sunburst Lane WTP Improvements 3335 Hancock Road Clermont, Florida 34711 Prime Contract Change Order #005: Chemical PLC Replacement TO: City of Clermont FROM: L7 Construction, Inc. 685 W. Montrose Street 275 Hunt Park Cove Clermont, Florida 34711 Longwood, Florida 32750 DATE CREATED: 6/02/2023 CREATED BY: Rachel Quinn (L7 Construction, Inc.) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED LOCATION: FROM: DESIGNATED REVIEWER: Rachel Quinn (L7 Construction, Inc.) REVIEWED BY: DUE DATE: 06/16/2023 REVIEW DATE: INVOICED DATE: PAID DATE: REFERENCE: CHANGE REASON: Client Request PAID IN FULL: No EXECUTED: No ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: SIGNED CHANGE ORDER REVISED SUBSTANTIAL RECEIVED DATE: COMPLETION DATE: FIELD CHANGE: No CONTRACT FOR: 1:Owner Contract TOTAL AMOUNT: $43,010.79 DESCRIPTION: Chemical PLC ReQlacement RE: TPC- Chemical PLC Replacement Attention: Mark Griffin/Duane Lane You have requested a quote for the following work: 1 Lot Engineering for procurement 1 PLC rack, 10 slot, Allen Bradley ControlLogix • 1 Ethernet communication module, Allen Bradley ControlLogix • 2 Digital input module, 16 point, Allen Bradley ControlLogix • 1 Isolated relay output module, 16 point, Allen Bradley ControlLogix • 1 Isolated analog input module, 8 point, Allen Bradley ControlLogix • 1 Isolated analog output module, 8 point, Allen Bradley ControlLogix • 5 1/0 module terminal block PLC/HMI programming: • PLC/HMI programming • Field installation Start-up and training • System commissioning Operational Readiness Test • Field Acceptance Test L7 Construction, Inc. Page 1 of 2 Printed On: 6/2/2023 08:00 AM DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317 PCCO #005 Submittals Operation & Maintenance Manuals 1-Year Warranty • Factory Check Out Freight to US destination Services: • Startup associated with the equipment and materials listed above. • PLC and HMI Programming • On -site testing • Ethernet connection to existing network Approximate schedule of the scope of work: • There is no completion deadline. Work can be scheduled as mutually agreeable. Submittals will be included with the rest of the project submittals, anticipating by/before 6/26. • Parts will come with the rest of the parts for this project. • The chemical PLC replacement will be integrated when the plant switch over is occurring. This work will add about a day to the overall process. • The new PLC at the chemical room will be controlled by the new master PLC involved in the main scope of this project. • The chemical PLC will be a remote 1/0 drop off of the master PLC. Excludes: • Temporary controls Night work L7 Construction, Inc. proposes to provide the above scope of work for the lump sum of $43,010.79. Fortv- Three Thousand Ten Dollars and Seventv-Nine Cents. ATTACHMENTS: The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. Mike Scullion (Halff Associates, Inc.) 902 N. Sinclair Avenue Tavares, Florida 32778 SIGNATURE 6.15.2023 DATE City of Clermont 685 W. Montrose Street Clermont, Florida 34711 1 SIGNA�RE L7 Construction, Inc. Page 2 of 2 $6,946,700.00 $0.00 $6,946,700.00 $43,010.79 $6,989,710.79 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 9/1 /23 DATE SIGNATURE DATE Printed On: 6/2/2023 08:00AM DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 Phone: (321) 972-9325 Fax: 407-732-7812 PCCO #006 Project: 22-039 - 22-039 Sunburst Lane WTP Improvements 3335 Hancock Road Clermont, Florida 34711 Prime Contract Change Order #006: Switch to US Pipe for Flanged Pipe TO: City of Clermont FROM: L7 Construction, Inc. 685 W. Montrose Street 275 Hunt Park Cove Clermont, Florida 34711 Longwood, Florida 32750 DATE CREATED: 7/10/2023 CREATED BY: Rachel Quinn (11-7 Construction, Inc.) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED FROM: DESIGNATED REVIEWER: Rachel Quinn (11-7 Construction, Inc.) DUE DATE: 07/21/2023 INVOICED DATE: REFERENCE: PAID IN FULL: No ACCOUNTING METHOD: Amount Based SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON: Client Request EXECUTED: No SCHEDULE IMPACT: 0 days REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: 1:Owner Contract TOTAL AMOUNT. $7,726.47 DESCRIPTION: Switch to US Pine for Flanged Pipe This change order is an adder for switching from McWane pipe to US Pipe. McWane was listed in the specifications as an approved manufacturer, however the city does not want to use this manufacturer. US Pipe will be supplying the flange pipe on this project. ATTACHMENTS: The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. Mike Scullion (Halif Associates, Inc.) 902 N. Sinclair Avenue Tavares, Florida 32778 SIGNATURE 7.14.23 DATE City of Clermont 685 W. Montrose Street Clermont, Florida 34711 H ) I' SIGN E $6,946,700.00 ($1,059,818.36) $5,886,881.64 $7,726.47 $5,894,608.11 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 9/1 /23 DATE SIGNATURE DATE L7 Construction, Inc. Page 1 of 1 Printed On: 7/10/2023 03:10 PM DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 Phone: (321) 972-9325 Fax: 407-732-7812 PCCO #007 Project: 22-039 - 22-039 Sunburst Lane WTP Improvements 3335 Hancock Road Clermont, Florida 34711 Prime Contract Change Order #007: ODP Change Order for Switching the Flanged Pipe from McWane to US Pipe TO: City of Clermont FROM: L7 Construction, Inc. 685 W. Montrose Street 275 Hunt Park Cove Clermont, Florida 34711 Longwood, Florida 32750 DATE CREATED: 7/10/2023 CREATED BY. Rachel Quinn (1-7 Construction, Inc.) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED LOCATION: FROM: DESIGNATED REVIEWER: REVIEWED BY: DUE DATE: 07/21/2023 REVIEW DATE: INVOICED DATE: PAID DATE: REFERENCE: CHANGE REASON: ODP PAID IN FULL: No EXECUTED: No ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: 0 days SIGNED CHANGE ORDER REVISED SUBSTANTIAL RECEIVED DATE: COMPLETION DATE: FIELD CHANGE: No CONTRACT FOR: 1:Owner Contract TOTAL AMOUNT: ($6,048.74) DESCRIPTION: ODP Chance Order for Switching the Flan4ed Pi:ie from McWane to US Piste Change order to deduct the ODP portion of the adder for switching from McWane to US Pipe for the Flange Pipe ATTACHMENTS: CHANGE ORDER LINE ITEMS: # Budget Code Description 1 63-15-1000.M PIPE, VALVES & FITTINGS. Materials Deduct for ODP Portion of Adder for Switching from McWane to US Pipe 2 63-15-1000.M PIPE, VALVES & FITTINGS. Materials 6% Florida Sales Tax (Sur -tax already capped) 3 63-15-1000.M PIPE, VALVES & FITTINGS. Materials ODP Order for Pipe- (1-7 1 % Savings on Payment) Grand Total: The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. Amount $(5,764.00) $(345.84) $61.10 $(6,048.74) $6,946,700.00 ($1,059,818.36) $5,886,881.64 ($6,048.74) $5,880,832.90 L7 Construction, Inc. Pagel of 2 Printed On: 7/10/2023 03:14 PM DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317 Mike Scullion (HaW Associates, Inc.) 902 N. Sinclair Avenue Tavares, Florida 32778 SIGNATURE DATE 7.14.23 City of Clermont 685 W. Montrose Street Clermont, Florida 34711 MCA I') SIGN RE DATE L7 Construction, Inc. Page 2 of 2 PCCO #007 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 9/1 /23 SIGNATURE DATE Printed On: 7/10/2023 03:14 PM DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317 Y,.,PCCO #008 L7 Construction, Inc. Project: 22-039 - 22-039 Sunburst Lane WTP Improvements 275 Hunt Park Cove 3335 Hancock Road Longwood, Florida 32750 Clermont, Florida 34711 Phone: (321) 972-9325 Fax:407-732-7812 Prime Contract Change Order #008: Deductive Change Order for Value Engineering Roof Option TO: City of Clermont FROM: L7 Construction, Inc. 685 W. Montrose Street 275 Hunt Park Cove Clermont, Florida 34711 Longwood, Florida 32750 DATE CREATED: 8/25/2023 CREATED BY: Rachel Quinn (11-7 Construction, Inc.) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED LOCATION: FROM: DESIGNATED REVIEWER: Rachel Quinn (1-7 Construction, Inc.) REVIEWED BY: DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: REFERENCE: CHANGE REASON: Design Development PAID IN FULL: No EXECUTED: No ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: 0 days SIGNED CHANGE ORDER REVISED SUBSTANTIAL RECEIVED DATE: COMPLETION DATE: FIELD CHANGE: No CONTRACT FOR: 1:Owner Contract TOTAL AMOUNT: ($10,000.00) DESCRIPTION: Deductive Change Order for Value Engineerirr-i Roof Option `Deductive change order for the value engineer option of using a 24-gauge Painted Galvalume metal roof with 1" rib with striations and snap locking mechanism. (Reference submittal D-07411-001-A) ATTACHMENTS: 07411-001-A Roofing for Well Houses ftprovedl,pdf The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. Mike Scullion (Halff Associates, Inc.) 902 N. Sinclair Avenue Tavares, Florida 32778 W SIGNATURE g 28 23 DATE L7 Construction, Inc. $6,946,700.00 ($1,059,818.36) $5,886,881.64 ($10,000.00) $5,876,881.64 City of Clermont L7 Construction, Inc. 685 W. Montrose Street 275 Hunt Park Cove Clermont, Florida 34711 Longwood, Florida 32750 4-S-2 5 SIGGN RE DATE SIGNATURE DATE Page 1 of 1 Printed On: 8/25/2023 03:22 PM DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 Phone: (321) 972-9325 Fax: 407-732-7812 PCCO #009 Project: 22-039 - 22-039 Sunburst Lane WTP Improvements 3335 Hancock Road Clermont, Florida 34711 Prime Contract Change Order #009: Sheet Piles for the West Side of the New Ground Storage Tank TO: City of Clermont 685 W. Montrose Street Clermont, Florida 34711 DATE CREATED: 8/29/2023 FROM: L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 CREATED BY: CONTRACT STATUS: Pending - In Review REVISION: REQUEST RECEIVED LOCATION: FROM: Rachel Quinn (11-7 Construction, Inc.) 0 DESIGNATED REVIEWER: Rachel Quinn (1-7 Construction, Inc.) REVIEWED BY: DUE DATE: 09/08/2023 REVIEW DATE: INVOICED DATE: PAID DATE: REFERENCE: CHANGE REASON: Design Development PAID IN FULL: No EXECUTED: No ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: 0 days SIGNED CHANGE ORDER REVISED SUBSTANTIAL RECEIVED DATE: COMPLETION DATE: FIELD CHANGE: No CONTRACT FOR: ):Owner Contract TOTAL AMOUNT. $75,522.18 DESCRIPTION: Sheet Piles for the West Side of the New Ground Storaoe Tank From the original design, the 24" water main running between the fence and the new ground storage tank was supposed to be relocated to allow access for Precon's working road. The intent was to slope the area to get the required elevations we need at that time. Upon further exploration it was discovered that the 24" water main is not in the working road footprint anymore and no longer has to be relocated. We also discovered a duct bank in this area that was not shown on the drawings. It runs parallel with the fence and has been determined that it feeds power to the existing well house. To protect these utilities during the new ground storage tank installation, sheet piles will be required to maintain the required slopes. The intent is to install 114 lineal feet of sheet piles, approximately thirty feet tall, to protect the existing utilities. The sheet piles will be rented for nine months to allow for the installation of the ground storage tank. Once the tank is leak tested, the area will be backfilled and the sheet piles will be removed. From not having to relocate the pipe, the city is saving $106,792.80. This value was deducted from our contract in change order #001, for the owner direct purchase of the pipe materials. As the city is saving money from not having to relocate the pipe, we are asking for additional compensation for the sheet piles required to protect the 24" water main that is no longer being relocated, as well as the existing well house power duct bank that was not shown on the drawings. We propose to provide the labor, materials, and equipment to install the sheet piles for a duration of nine months for the lump sum value of $76.522.18 !Seventy -Five Thousand Five Hundred Twenty-7Wvo Dollars and Eiuhteen-Cents). After this cost, the city is still saving $31,240.20 from not having to relocate the pipe. List of pipe materials not being used for the relocation resulting in the $106,792.80 savings: Description Quantit Unit 16" MJ 90 1 EA 24" x 16" MJ Tee 1 Fes, 24" MJ 45s 2 EA 16" MJ 45s 13 f EA t L7 Construction, Inc. Page 1 of 2 Printed On: 8/30/2023 10:08 AM DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317 X7- PCCO #009 20" x 24" MJ Reducer ] 1 EA 24" x 12" MJ Tee ] 1 I EA 16" MJ Gate Valve ] 1 EA 24" MJ 45s ] 2 EA 12" MJ Gate Valve 1 EA 12" MJ Sleeve I 1 EA 16" Megalug Kits 12 EA 24" Megalug Kits 13 EA 12" Megalug Kits 5 EA 24" Gripper Gaskets- Fast -grip 6 EA 24" MJ Pipe-Fastite 100 LF 24" MJ Pipe- Fastite- GFL 60 LF 16" Megalug Kits 10 EA 12" MJ Spool- PE x PE -GFL 1 EA 16" Gripper Gaskets 3 EA 16" MJ Pipe 60 LF 16" MJ Pipe-GFL 40 LF 24" MJ Gate Valves 2 EA ATTACHMENTS: The original (Contract Sum) $6,946,700.00 Net change by previously authorized Change Orders ($1,059,818.36) The contract sum prior to this Change Order was $5,886,881.64 The contract sum would be changed by this Change Order in the amount of $75,522.18 The new contract sum including this Change Order will be $5,962,403.82 The contract time will not be changed by this Change Order. Mike Scullion (Halff Associates, Inc.) City of Clermont L7 Construction, Inc. 902 N. Sinclair Avenue 685 W. Montrose Street 275 Hunt Park Cove Tavares, Florida 32778 Clermont, Florida 34711 Longwood, Florida 32750 ( 9.6.23 SIGNATURE DATE 'SIGN' URE DATE SIGNATURE DATE L7 Construction, Inc. Page 2 of 2 Printed On: 8/30/2023 10:08 AM DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317 d r �N w �IIII� Ngl j� II .' z 411 zIm 4 iL ✓� jf f 11 f '. /-=_= j III it I 0 z N z 0 00 t-. U Z 8 a: cr-CC a� 0ZZ g�0 y0 a 0 DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 Phone: (321) 972-9325 Fax: 407-732-7812 PCCO #010 Project: 22-039 - 22-039 Sunburst Lane WTP Improvements 3335 Hancock Road Clermont, Florida 34711 Prime Contract Change Order #010: Electrical Drawing Modifications - Contract #2023-013 TO: City of Clermont FROM: L7 Construction, Inc. 685 W. Montrose Street 275 Hunt Park Cove Clermont, Florida 34711 Longwood, Florida 32750 DATE CREATED: 9/01/2023 CREATED BY: Rachel Quinn (1-7 Construction, Inc.) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED LOCATION: FROM: DESIGNATED REVIEWER: Rachel Quinn (11-7 Construction, Inc.) REVIEWED BY: DUE DATE: 09/15/2023 REVIEW DATE: INVOICED DATE: PAID DATE: REFERENCE: CHANGE REASON: Design Development PAID IN FULL: No EXECUTED: No ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: 0 days SIGNED CHANGE ORDER REVISED SUBSTANTIAL RECEIVED DATE: COMPLETION DATE: FIELD CHANGE: No CONTRACT FOR: 1:Owner Contract TOTAL AMOUNT: $6,830.42 DESCRIPTION: Electrical Drawinu Modifications "Change proposal for the modifications made to the electrical drawings dated 8/17/23. 'At both well houses, a disconnect was added where the fan circuits were. 'At the generator a new 10 kVA transformer, with disconnect and rack was added. ATTACHMENTS: SS BEC Permitting Set Clermont Sunburst WTP.odf The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. Mike Scullion (Halff Associates, Inc.) 902 N. Sinclair Avenue Tavares, Florida 32778 r . 9.6.23 SIGNATURE DATE City of Clermont 685 W. Montrose Street Clermont, Florida 34711 SIGNXUURRE 1-1\�-'1 L7 Construction, Inc. Page 1 of 1 $6,946,700.00 ($1,059,818.36) $5,886,881.64 $6,830.42 $5,893,712.06 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 DATE SIGNATURE DATE Printed On: 9/1/2023 02:47 PM DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317 SNOl1VIA3N13SV T S108WAS 'S310N IVOIN10313 I INO I1, 3%) S1N3W3AOHMI \U 'dTM 3NVl isun9Nns .� VCHWO-WINOM31020AU0 Ia N lid lit 3 Nil _ 14 d • n d 1. d o 1 _ d = d sxruczse ae �ru •weu'r...n .: � W >7 ���►�H C•• V.,.,� "Fy s°�y to d a�g�' �€ <I I blr a 6� a g Et Egi I E I § Is elgg Om I Rm 5nInIing-uw6mrIisaII� ;01-�lt3E g ;DI. ru u, 0 w z a DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 Phone: (321) 972-9325 Fax: 407-732-7812 PCCO #013 Project: 22-039 - 22-039 Sunburst Lane WTP Improvements 3335 Hancock Road Clermont, Florida 34711 Prime Contract Change Order #013: Change in Existing Conditions for 24" Effluent Pipe TO: City of Clermont FROM: L7 Construction, Inc. 685 W. Montrose Street 275 Hunt Park Cove Clermont, Florida 34711 Longwood, Florida 32750 DATE CREATED: 11/02/2023 CREATED BY: Rachel Quinn (11-7 Construction, Inc.) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED LOCATION: FROM: DESIGNATED REVIEWER: Rachel Quinn (11-7 Construction, Inc.) REVIEWED BY. DUE DATE: 11/06/2023 REVIEW DATE: INVOICED DATE: PAID DATE: REFERENCE: CHANGE REASON: Existing Condition PAID IN FULL: No EXECUTED: No ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: 0 days SIGNED CHANGE ORDER REVISED SUBSTANTIAL RECEIVED DATE: COMPLETION DATE: FIELD CHANGE: No CONTRACT FOR: 1:Owner Contract TOTAL AMOUNT: $11,454.50 DESCRIPTION: Change in Existing Conditions for 24" Effluent Piffle Per the discussion regarding RFI #12 on the existing versus new tank elevations, we discovered the existing 24" effluent pipe has a centerline elevation of 215.19. With the new proposed tank design, the new centerline elevation is 218.10. To make up the difference in the 24" effluent line we are proposing to add two (2) 24" 45-degree fittings. This change order does not include changes to the influent pipe nor tank, after our evaluation we will send a separate change order listing deducts/adders for those items. ATTACHMENTS: The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. Mike Scullion (Halff Associates, Inc.) 902 N. Sinclair Avenue Tavares, Florida 32778 11.27.23 SIGNATURE DATE City of Clermont 685 W. Montrose Street Clermont, Florida 34711 *iGNAT DATE L7 Construction, Inc. Page 1 of 1 $6,946,700.00 ($992,618.45) $5,954,081.55 $11,454.50 $5,965,536.05 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 SIGNATURE DATE Printed On: 11/2/2023 04:08 PM DocuSign Envelope ID: BBAE5E06-FC9D-4053-85OF-8E6B7D2BB317 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 Phone: (321) 972-9325 Fax: 407-732-7812 PCCO #014 Project: 22-039 - 22-039 Sunburst Lane WTP Improvements 3335 Hancock Road Clermont, Florida 34711 Prime Contract Change Order #014: ODP- Pipe Materials for 24" Effluent Line TO: City of Clermont FROM: L7 Construction, Inc. 685 W. Montrose Street 275 Hunt Park Cove Clermont, Florida 34711 Longwood, Florida 32750 DATE CREATED: 11/02/2023 CREATED BY: Rachel Quinn (1-7 Construction, Inc.) CONTRACT STATUS: Pending - In Review REVISION: 0 ` REQUEST RECEIVED LOCATION: FROM: DESIGNATED REVIEWER: Rachel Quinn (11-7 Construction, Inc.) REVIEWED BY: DUE DATE: 11/03/2023 REVIEW DATE: INVOICED DATE: PAID DATE: REFERENCE: CHANGE REASON: Existing Condition PAID IN FULL: No EXECUTED: No ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: 0 days SIGNED CHANGE ORDER REVISED SUBSTANTIAL RECEIVED DATE: COMPLETION DATE: FIELD CHANGE: No CONTRACT FOR: 1:Owner Contract TOTAL AMOUNT: ($7,228.27) DESCRIPTION: ODP- Pig ra Materials for 24" Effluent Line Change order to deduct the ODP portion of the adder for adding the two 24" 45-degree fittings on the 24" effluent pipe due to the existing centerline elevation. ATTACHMENTS: The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. Mike Scullion (HaW Associates, Inc.) 902 N. Sinclair Avenue Tavares, Florida 32778 11.27.23 City of Clermont 685 W. Montrose Street Clermont, Florida 34711 [2Z---- 00"K SIG *AURAE '" � L7 Construction, Inc. Page 1 of 1 $6,946,700.00 ($992,618.45) $5,954,081.55 ($7,228.27) $5,946,853.28 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 DATE SIGNATURE DATE Printed On: 11/2/2023 04:07 PM