Loading...
Contract 2018-20A CODocuSign Envelope ID: 6CE7C803-9266-4B62-8E5F-41408DD99276 CHANGE ORDER FORM Contract / P.O. Number: 2018-20 / 20232271 Change Order Number: 6 Project Name: Architectural Services for PW Facility Job Location: 12838 Hancock Road, Clermont, FL VENDOR INFORMATION: Company Name: Bentley Architects + Engineers, Inc. Address: 651 W. Warren Ave., Ste. 200 Contact Name: Gary Kranston, V.P. Bid Number: RFQ 17-048 Change Order Date: Dec 13, 2023 Department: Public Services City, St., Zip: Longwood, FL 32750 Telephone: 407-331-616 DESCRIPTION OF CHANGE: Alteration, deviation, addition, or deletion caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary). Additive task order in the total amount of $39,468.36 for additional post design services corresponding to unforseen additional work. See attached documents for more information. ITEM AMOUNT A. ORIGINAL CONTRACT VALUE: $ 774,004.97 B. AMOUNT OF THIS CHANGE ORDER: $ 39,468.36 Must be within the overall scope of services in accordance with contract specifications. C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): % 5.1% D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 64,307.18 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $ 103,775.54 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 10% Maximum % 13.4% G. NEW CONTRACT VALUE (A+E) $ 877,780.51 This Change Order is not valid without the following signatures: by:1Ar� 'DocuSigned 40A Sfft aoll'DMAD24A7... E 1/10/2024 CONTRACTOR Date PROJECT ARCHITECT / ENGINEER Date EsDocuSigned by: DS DocuSigned by: fbin" bl(Wn S6VI 1/10/2024 �S E�� & S 1/10/2024 014063B8FF4140F... 530u, 8A394C8... DO DEPARTMENT DIRECTOR Date PROCUREMENT DIRECTOR / a- CITY MANAGER Council approval is required if change order(s): 1) exceeds $49,999; 2) exceeds the greater of $100,000 OR 10% of the ori;/inal r contract amount for construction projects; 3) the funds are not available in the approved budget for the department. CITY OF CLERMONT ATTEST: DocuSigned by: DocuSigned by: 1/10/2024 ET"` A`�d H�vc 1/10/2024 26A7692F758C492... 3AD7F349056344A... MAYOR Date CITY CLERK Date Rev. 1-1-2021 DocuSign Envelope ID: 6CE7C803-9266-4B62-8E5F-41408DD99276 PROPOSAL LETTER December 13, 2023 Freddy L Suarez, MPA, CPPB Purchasing Director 685 W. Montrose St. Clermont, Florida 34711 Re: Clermont Public Works Facility BAE Project No.: 2017.072.1 SA for Additional Post Design Services Dear Mr. Suarez: We appreciate the opportunity to submit this proposal for professional services for the above -referenced project. The scope of work for this authorization will include additional post design services corresponding to unforeseen efforts associated with addressing non -contract -documents -compliant work completed by the Contractor, and extended construction completion schedule. A. Scope of Work 1. Civil: a. Site visits: Attend two (2) additional site inspections to verify grading and parking/driveway pavement conditions. b. Drainage system: Review two (2) additional rounds of storm sewer system as -built surveys c. Site grading: Extensive review of as -built site grading conditions to address non -compliant and non -consistent site grading. d. Parking and driveway pavement: Review of pavement core boring reports and follow-up "Request - for -Information" responses to address non -compliant pavement section areas. e. Teams meetings related to pavement deficiencies. f. Lift Station: Review of one (1) additional lift station as -built survey after addressing non -compliant wet well depth. 2. Architecture: a. Four additional OAC meetings and site visits with associated field reports. b. Process and review additional Requests for Information (RFI's). c. Teams meetings related to pavement deficiencies. d. General contract administration. 3. See attached proposal from SOBE for additional MEP scope. B. Fees Please see attached summary fee sheet. C. Reimbursable Expenses Billed in accordance with Basic Services contract. If this proposal meets with your approval, please sign and fax back this proposal letter. We will await a specific task authorization to begin work. If you have any questions, please do not hesitate to contact our office. 1 of 2 651 West Warren Avenue, Suite 200, Longwood, Florida 32750 T 4073316116 www.bentleygroupinc.com AC002023 / DocuSign Envelope ID: 6CE7C803-9266-4B62-8E5F-41408DD99276 Sincerely, Bentley Group, Inc. Gary L. Kranston, RA, AIA Vice President City of Clermont Freddy L Suarez, MPA, CPPB Purchasing Director PROPOSAL LETTER 2 of 2 651 West Warren Avenue, Suite 200, Longwood, Florida 32750 T 4073316116 www.bentleygroupinc.com AC002023 / DocuSign Envelope ID: 6CE7C803-9266-4B62-8E5F-41408DD99276 ESTIMATE OF WORK EFFORT AND COST - PRIME CONSULTANT Name of Project: County: FPN: FAP No.: Clermont Public Works Facility Lake 2017.072.1 Hours From Staff Classification "SH Summary - Firm" Project General Tasks 16 Civil Post Design 90 Arch Post Design 60 31. Architecture Development 0 Total Staff Hours I 166 Total Staff Cost Chief Senior Project Architect Intern Senior Project Project Engineer Civil Engineering Engineer Architect Architect Engineer Engineer Civil Intern - Civil $218.71 $150.84 $115.60 $84.58 $165.92 $128.59 $100.78 $83.00 0 16 0 0 0 0 0 0 0 0 0 0 54 36 0 0 0 39 21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 55 21 0 54 36 0 0 $0.00 $8,296.20 $2,427.60 $0.00 $8,959.68 $4,629.24 $0.00 $0.00 Consultant Name: Bentley Architects + Engineers, Inc. Consultant No.: 2017.072.1 Date: 12/13/2023 Estimator: Gary Kranston Project Engineering Secretary / Staff Classi- SH Salary Average Engineer Intern Clerical fication 12 Structural Structural By Cost By Rate Per $110.53 $83.17 $76.89 $0.00 Activity Activity Task 0 0 0 0 16 $2,413 $150.84 0 0 0 0 90 $13,589 $150.99 0 0 0 0 60 $8,310 $138.51 0 0 0 0 0 $0 #DIV/0! 0 0 0 0 166 $0.00 $0.00 $0.00 $0.00 $24,312.72 $146.46 Check = $24,312.72 SALARY RELATED COSTS: $24,312.72 OVERHEAD: 0% $0.00 OPERATING MARGIN: 0% $0.00 FCCM (Facilities Capital Cost Money): 0.00% $0.00 EXPENSES: 5.00% $1,215.64 4-man crew Survey (Field - if by Prime) 0 days @ $ / day $0.00 SUBTOTAL FEE: $25,528.36 Subconsultant: Ardaman $0.00 Subconsultant: BESH $0.00 Subconsultant: Ramski $0.00 Subconsultant: SOBE $13,940.00 Subconsultant: Foster Conant $0.00 SUBTOTAL FEE: $39,468.36 Geotechnical Field and Lab Testing $0.00 SUBTOTAL FEE: $39,468.36 Optional Services $0.00 GRAND TOTAL LUMP SUM FEE: $39,468.36 Task Sheets_Bentley_2023.12.13.xlsx Fee Sheet - Bentley Page 1 of 1 12/13/2023 9:52 AM DocuSign Envelope ID: 6CE7C803-9266-4B62-8E5F-41408DD99276 i3 ,iS,O'BRIEN expect a difference Gary Kranston CLIENT Bentley Group, Inc. ADDRESS 651 W. Warren Avenue, Suite 200 CITY, STATE, ZIP Longwood, Florida 32750 Project description: Salas O'Brien 3501 Quadrangle Blvd., Suite 100 Orlando, Florida 32817 407.380.0400 1 www.salasobrien.com City of Clermont Public Works SORE Project Number: 17097 December 8, 2023 Dace Client number: 2017.072.1 Additional service description: Provide extended CA services for August ana�a , through December 2023 to coordinate with the extension of the construction schedule. Scope of work to include continued support of responses to RFIs, shop drawing review, and general correspondence and management of the project. Scope to also include punch list verfication site visit in December, report of findings, and follow an site visit to verify those punehlist items not corrected in December, also with report of findings. Compensation: $13,940.00 Terms: Hourly, Not to exceed 7I.11mp sum 0 Other: Work will not proceed without El authorization: Work has proceeded in good faith Fx1 Authorization: SalaS O'Brien - Date Principal