Loading...
Contract 2018-58A CODocuSign Envelope ID: C5041 D57-EE9B-4682-AD96-5105F47C8A94 CHANGE ORDER FORM Contract / P.O. Number: 2018-58 / 20231599 Change Order Number: 5 Project Name: Construction Management Services Job Location: 12838 Hancock Road, Clermont, FL VENDOR INFORMATION: Company Name: The A.D. Morgan Corporation Address: 1953 E. Edgewood Drive Contact Name: Jeremy Warner, Director of Preconst. Bid Number: RFQ 18-021 Change Order Date: Dec 14, 2023 Department: Public Services City, St., Zip: Lakeland, FL 33803 Telephone: (813) 832-3033 DESCRIPTION OF CHANGE: Alteration, deviation, addition, or deletion caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary). Extended construction duration of three months for a total of $39,000. If the project finishes earlier than the anticipated three month time addition, the amount deducted from Johnson-Laux contract will be modified to match the actual time and cost incurred. ITEM AMOUNT A. ORIGINAL CONTRACT VALUE: $ 197,960.00 B. AMOUNT OF THIS CHANGE ORDER: $ 39,000.00 Must be within the overall scope of services in accordance with contract specifications. C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): % 19.7% D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 119,580.00 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $ 158,580.00 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 10% Maximum % 80.1% G. NEW CONTRACT VALUE (A+E) $ 356,540.00 This Change Order is not valid without the following signatures: EDocuSigned by: W � 00mu'r 1/10/2024 1479A1DD245545B.- CONTRACTOR Date PROJECT ARCHITECT / ENGINEER Date EsDocuSigned by: DS DocuSigned by: fb" bl(WA Sb10, 1/10/2024 S � & S 1/10/2024 168 014063B8FF4140F... 534781A394C8... DC DEPARTMENT DIRECTOR Date PROCUREMENT DIRECTOR / �a—te CITY MANAGER Council approval is required if change order(s): 1) exceeds $49,999; 2) exceeds the greater of $100,000 OR 10% of the oricinal contract amount for construction projects; 3) the funds are not available in the approved budget for the department. CITY OF CLERMONT ATTEST: DocuSigned by: DocuSigned by: - 1/10/2024 �` `� Ho�vc//10/2024 ET26A7692F758C492 3AD7F34905B344A... MAYOR Date CITY CLERK Date Rev. 1-1-2021 DocuSign Envelope ID: C5041 D57-EE9B-4682-AD96-5105F47C8A94 plp�Fp- A.D. MEAN General Contractors Construction Managers WE DO MORE TAMPA Corporate Headquarters 716 N. Renel€ie Drive Tampa, Florida 33609 PH: 813 # 832 # 3033 FAX: 813 # 831 # 9860 PCCO #006 Prime Contract Change Order #006: Extend construction duration 3 months @13,000.00/month TO: City of Clermont FROM: The A.D. Morgan Corporation 400 12th Street Clermont, Florida 34711 DATE CREATED: 9/ 22 /2023 CONTRACT STATUS: Approved DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: SCHEDULE IMPACT, 90 days CONTRACT FOR: 1:City of Clermont Public Works Facility Prime Contract DESCRIPTION: Extend construction duration 3 months @13,000.00/month. New Substantial Completion Date November 30, 2023. ATTACHMENTS: BRADENTON CHANGE ORDER REQUESTS IN THIS CHANGE ORDER: 2411-13 Manatee Ave W. COR # I Title Bradenton, Florida 34205 005 I Extend construction duration 3 months PH: 941 # 747 # 3001 @13,000.00/month FAX: 941 # 747 # 3015 CHANGE ORDER LINE ITEMS: 716 Renellie Drive Tampa Florida 33609 CREATED BY: Ricky Pena (The A.D. Morgan Corporation) REVISION: 0 REVIEWED BY: REVIEW DATE: 09/22 /2023 PAID DATE: EXECUTED: No TOTAL $ 39,000.00 AMOUNT: Schedule Impact 90 days PCO # 005 : Extend construction duration 3 months @13,000.00/month LAKELAND # I cost code Description 1453 E. Edgewcod Drive 1 00-705 - Project Managers Phase III Extend Construction Duration 3 Months Lakeland, Florida 33803 PH: 863 # 450 # 4840 FAX: 863 # 450 # 4697 License # CGC044502 www.admorgan.com The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum will be increased by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will be increased by this Change Order by 90 days TOTAL: Labor Amount $ 39,000.00 $39,000.00 Type I Amount $ 39,000.00 Subtotal: $39,000.00 Grand Total: $39,000.00 $ 197,960.00 $ 119,580.00 $ 317,540.00 $ 39,000.00 $ 356,540.00 The A.D. Morgan Corporation page 1 of 2 Printed On: 9/22/ 2023 08 :24 AM DocuSign Envelope ID: C5041 D57-EE9B-4682-AD96-5105F47C8A94 PCCO #006 City of Clermont 400 12th Street Clermont Florida 34711 The A.D. Morgan Corporation 716 N. Renellie Dr. Tampa Florida 33609 SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE The A.D. Morgan Corporation page 2 of 2 Printed On: 9/22/ 2023 08 :24 AM