Loading...
Contract 2024-007A CODocuSign Envelope ID: Al 217274-9E6C-4E8D-8AE8-395A9C1 7127E CHANGE ORDER FORM Contract / P.O. Number: 2024-007 / 20243134 Change Order Number: 2 Project Name: Victory Pointe Parking Lot Const. Job Location: Victory Pointe VENDOR INFORMATION: Company Name: Traverse Group, Inc. Address: P.O. Box 121754 Contact Name: Alicia Roehn Bid Number: N/A Change Order Date: Apr 17, 2024 Department: Public Services City, St., Zip: Clermont, FL 34711 Telephone:(352) 409-6630 DESCRIPTION OF CHANGE: Alteration, deviation, addition, or deletion caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary). Additive Change Order - Victory Pointe, West Ave. and Osceola future parking lot design change in the total amount of $8,197.80 ITEM AMOUNT A. ORIGINAL CONTRACT VALUE: $ 557,913.73 B. AMOUNT OF THIS CHANGE ORDER: $ 8,197.80 Must be within the overall scope of services in accordance with contract specifications. C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): % 1.5% D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 47,000.00 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $ 55,197.80 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 10% Maximum % 9.9% G. NEW CONTRACT VALUE (A+E) $ 613,111.53 This Change Order is not valid without the following signatures: DocuSigned by: DocuSigned by: 4/17/2024 EY�\I `— 4/18/2024 396EE3AC046D48F 6AA711E6BB654D8... CONTRACTOR Date PROJECT ARCHITECT / ENGINEER Date EsDocuSigned by: DocuSigned by: fbin" bVWASbV1 4/18/2024 4 a%k" 4/18/2024 014063B8FF4140F... 431F57D413554D6... DEPARTMENT DIRECTOR Date PROCUREMENT DIRECTOR / Date CITY MANAGER Council approval is required if change order(s): 1) exceeds $49,999; 2) exceeds the greater of $100,000 OR 10% of the original contract amount for construction projects; 3) the funds are not available in the approved budget for the department. CITY OF CLERMONT ATTEST: MAYOR Date CITY CLERK Date Rev. 1-1-2021 DocuSign Envelope ID: Al 217274-9E6C-4E8D-8AE8-395A9C1 7127E TRAVERSE GROUP, INC. -CITY OF CLERMONT STREETSCAPE PHASE 3 West and Osceola Future Parking Lot kL.N. I General Description I Qty. I Unit IUnit Price Extended Price - Victory Pointe West Ave and Osceola St Future Parking Lot (Due to no being on original design) $ 8,197.80 Historic Village ADA Sidewalk D Curb for Grading Issue Near Victory Pointe Restrooms Addt 18" RCP to upgrade unknown 15" Chokepoint Manhole Tie-ins 270 LF $ 8.89 $ 2,400.30 50 LF $ 19.95 $ 997.50 24 LF $ 75.00 $ 1,800.00 2 EA $ 1,500.00 $ 3,000.00 TOTAL $ 8,197.80