Contract 2019-55A CO 1DocuSign Envelope ID: ECF76930-4395-4BBE-B77A-17E9027045EF
CHANGE ORDER FORM
Contract / P.O. Number: 2019-55 / 20231454
Change Order Number: 19
Project Name: Streetscape Phase 3
Job Location: Not Applicable
VENDOR INFORMATION:
Company Name: Traverse Group, Inc.
Address: P.O. Box 121754
Contact Name: Alicia Roehn
Bid Number: RFB 19-051
Change Order Date: Apr 17, 2024
Department: Public Services
City, St., Zip: Clermont, FL 34712
Telephone:352-409-6630
DESCRIPTION OF CHANGE:
Alteration, deviation, addition, or deletion caused by conditions encountered during construction not covered by the specifications and
drawings of the project (attach additional pages if necessary).
Additive change order for 7th Street and Montrose Street to Minneola Avenue intersection in the total of $7,195.51.
Due to City requiring an estimate prior to the area being designed by engineer.
ITEM
AMOUNT
A.
ORIGINAL CONTRACT VALUE:
$
7,210,249.68
B.
AMOUNT OF THIS CHANGE ORDER:
$
7,195.51
Must be within the overall scope of services in accordance with contract specifications.
C.
PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A):
%
0.1%
D.
AMOUNT OF PREVIOUS CHANGE ORDERS:
$
451,334.13
E.
TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D):
$
458,529.64
F.
PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 10% Maximum
%
6.4%
G.
NEW CONTRACT VALUE (A+E)
$
7,668,779.32
This Change
Order is not valid without the following signatures:
EDocuSigned by:
Qua 96t,U,ln,
DocuSigned by:
4/17/2024 E — 4/17/2024
396EE3AC046D48F...
6AA711E6BB654D8...
CONTRACTOR
Date PROJECT ARCHITECT / ENGINEER Date
EsDocuSigned by: Docu,S{ig{ned, by:
fbin" bVWA SbV 1 4/17/2024 4 akk" 4/17/2024
014063B8FF4140F... 431F57D413554D6...
DEPARTMENT DIRECTOR Date PROCUREMENT DIRECTOR / Date
CITY MANAGER
Council approval is required if change order(s): 1) exceeds $49,999; 2) exceeds the greater of $100,000 OR 10% of the original
contract amount for construction projects; 3) the funds are not available in the approved budget for the department.
CITY OF CLERMONT ATTEST:
MAYOR Date CITY CLERK
Date
Rev. 1-1-2021
DocuSign Envelope ID: ECF76930-4395-4BBE-B77A-17E9027045EF
TRAVERSE GROUP, INC. - CITY OF CLERMONT STREETSCAPE PHASE 3
7th Street Additions/Deletions
General Description I
Qty.
I Unit
jUnit Price
Extended Price
7th St Montrose to Minneola Ave and Intersection (Intersection due to City requiring estimate prior to
$ 7,195.51
area being designed)
7th and Minneola Ave sidewalk SE corner of Intersection
570
SF
$ 8.89
$
5,067.30
Addition of sidewalk to meet ADA and correct grade issues
7th St East side sidewalk (not included on original design)
1703
SF
$ 4.55
$
7,748.65
Remove and Dispose of sidewalk STA 7+50 to 9+75
7th St East side sidewalk (not included on original design)
1703
LS
$ 8.89
$
15,139.67
Replace 5' sidewalk STA 7+50 to 9+75
625 7th St Sod and Irrigation replacement (not included on
LS
$
11,150.00
plans) to bring back to residential specs
1
$ 11,150.00
NW Corner of Montrose and 7th St - Crawford Modica and Holt
1
LS
$ 500.00
$ 500.00
landscape wall (not on plans)
Grading for above sidewalk repairs (value of $1514.05 no
1
LS
$ 0.00
$ 0.00
charge)
Intersection of 7th St and Minneola Ave Remove and Disposal
1
LS
$ 0.00
$ 0.00
(value $2593.50 no charge)
Landscape and Irrigation at NW corner of Montrose and 7th St
1
LS
$ 0.00
$ 0.00
behind landscape wall (value $7000 no charge)
7th St Minneola to Osceola St 19 Inlets
2
EA
$ 4,995.00
$ 9,990.00
7th St Minneola to Osceola St 18" RCP
24
LF
$ 89 95
$ 2,158.80
CREDIT 7th St Aluminum Railing
1
LS
-$ 29 700.00
-$ 29,700.00
CREDIT 7th St Thickened Edge Concrete
1
LS
-$ 15,000.00
-$ 15,000.00
0LS 2 /o Bond
1
$ 141.09
$ 141.09
TOTAL
$ 7,195.51