Contract 2023-028A (2)DocuSign Envelope ID: B61AB57A-7184-4BC7-85F2-OFA13ABED13F
CHANGE ORDER FORM
Contract / P.O. Number: 2023-028 / 20235048
Change Order Number: 3
Project Name: East Side Water Reclamation Facility
Job Location: Clermont East WRF
VENDOR INFORMATION:
Company Name: Vogel Bros. Building, Co.
Address: 2720 Drane Field Road
Contact Name: Andrew Decker
Bid Number: RFB 23-002
Change Order Date: Apr 29, 2024
Department: Public Services
City, St., Zip: Lakeland, FL 33811
Telephone:(863) 646-5078
DESCRIPTION OF CHANGE:
Alteration, deviation, addition, or deletion caused by conditions encountered during construction not covered by the specifications and
drawings of the project (attach additional pages if necessary).
Additive change order in the amount of $31,875.04 for additional IO/DO modules and Stratix switches required on
panels 160-PLC-1, 120-PLC, and 100-MCP-1.
ITEM
AMOUNT
A.
ORIGINAL CONTRACT VALUE:
$
44,300,000
B.
AMOUNT OF THIS CHANGE ORDER:
$
31,875.04
Must be within the overall scope of services in accordance with contract specifications.
C.
PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A):
%
0.1%
D.
AMOUNT OF PREVIOUS CHANGE ORDERS:
$
22,819.33
E.
TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D):
$
54,694.37
F.
PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 10% Maximum
%
0.1%
G.
NEW CONTRACT VALUE (A+E)
$
44,354,694.37
This Change
Order is not valid without the following signatures:
EDocuSigned by: DocuSigned by:
AwtA& Vb')LL 5/3/2024 E D� 6kvu" 5/3/2024
C66944C6F28
55CD3AA529D0464... 5425...
CONTRACTOR Date PROJECT ARCHITECT / ENGINEER Date
DocuSigned by: ir�
DocuSigned by:
E
fbin J bVWA SbV1 5/6/2024 E0 bl s 5/6/2024
014063B8FF4140F... 534781168A394C8...
DEPARTMENT DIRECTOR Date PROCUREMENT DIRECTOR / Date
CITY MANAGER
Council approval is required if change order(s): 1) exceeds $49,999; 2) exceeds the greater of $100,000 OR 10% of the original
contract amount for construction projects; 3) the funds are not available in the approved budget for the department.
CITY OF CLERMONT ATTEST:
MAYOR Date CITY CLERK
Date
Rev. 1-1-2021
DocuSign Envelope ID: B61AB57A-7184-4BC7-85F2-OFA13ABED13F
V4MGEL.
33It05. BUILDING CO.
better people = better builders'
April 4, 2023
Kinz Consulting LLC
235 Harbour Cove Way
Clermont, FL 34711
Aft: James Kinzler
RE: PCO#03 Control Panel Modifications
Mr. Kinzler,
Per submittal 13430-2.0 control panel drawings response additional 10 and DO modules are to be
added. Additional Stratix switches are required on panels 160-PLC-1, 120-PLC and 100-MCP-1.
Vogel Bros. Building Co. is requesting a change order be issued for $31,875.04 for this change and
that, at this time, no additional time be added to the contract completion date.
The breakdown of these additional costs is attached.
Should you have any questions concerning this request, please do not hesitate to contact me.
Sincerely,
'V'OGFi7L
04/04/2024 11:03:56 AM
Andrew Decker
Director of Operations
Vogel Bros. Bldg. Co.
CC: File
CC: Darren Vogel P.E.
2720 Drone Field Road, Lakeland, FL 33811 1 863.W.5078 office I CGC 1509018 1 www.vogeP*ig.com
An Equal Opporturuty Employer
DocuSign Envelope ID: B61AB57A-7184-4BC7-85F2-OFA13ABED13F
a w o -3 n o C
S pgID
�y n
o �
- is
C a s O a 0
i Py n m v0. O 'S' x' a �••� -0 o !< � f�c �• � ID M •y CLR y �N ,�y 'c tj
6
CL
CD
H o o g a 5 W
O
S ^a o 2 � E �� f■,
� O o
- n
to � � o
c �•
o A B O 0
Y $ g
C p' p
3 ► a p Q
x ^ 8
:> 85 o
Ow
«N ««««N N««
3 p
N o
-I �• s
N (D e
IOCID
r r � r ❑ o
5�
A M p � i»
° o
I « w N w N N« w w««
'II Cf'
o t" g
N««««««N«««
c 5'.
r r r o
N N N M N N« N u M« �. �• w W G rn O Iu �•
DocuSign Envelope ID: B61AB57A-7184-4BC7-85F2-OFA13ABED13F
is REVERE Vogel Bros. Building Co.
Lakeland,FL
3/25/2024
Andrew Decker
Senior Project Manager
2720 Drane Field Rd
As Lakeland, FL 33811
Reference: Additional IO cards added to 160 PLC panel & Additional Stratix Switches
Clermont, FL —EWRF Improvements— Revere's Project # AD0343 (COP-001 Rev.1)
Dear Mr. Decker,
Revere Control Systems, Inc. is pleased to submit a proposal for the requested changes. Our proposal includes the
following equipment and services.
Eouinment / Materials
Supply the following additional IO cards to 160-PLC-1 Control panel:
A- Quantity: One (1) AB Controll-ogix 16 points DI Card Part # 1756-IB16I
B- Quantity: One (1) AB ControlLogix 16 Points DO Card Part # 1756-OW16I
C- Terminal blocks, Relays, wiring... etc. (As required)
• Supply Quantity: 'Three (3) Stratix Switches Part # 1783HMS16T4CGN
Switches to be installed inside 160-PLC-1 ,120-PLC & 100-MCP-1
Services
Additional Engineering hours to revise the drawings.
Additional CAD & Documentation hours to revise the drawings.
Additional production hours to install and wire the added two modules.
Additional IO cards to 160-PLC-1 panel & Stratix Switches
Commercial Terms
• This proposal is valid for thirty (30) days from the date of the proposal.
• Net 30 days after date of invoice.
Respectfully Submitted,
jl�r-5a,
PeterBasllp, PMP
Project Manager
Revere Control Spstems, INC.
$ 26398.00
Revere Control Systems, Inc. 11 2240 Rocky Ridge Road Il B , . reverecontrol.com