Loading...
Contract 2023-028A (2)DocuSign Envelope ID: B61AB57A-7184-4BC7-85F2-OFA13ABED13F CHANGE ORDER FORM Contract / P.O. Number: 2023-028 / 20235048 Change Order Number: 3 Project Name: East Side Water Reclamation Facility Job Location: Clermont East WRF VENDOR INFORMATION: Company Name: Vogel Bros. Building, Co. Address: 2720 Drane Field Road Contact Name: Andrew Decker Bid Number: RFB 23-002 Change Order Date: Apr 29, 2024 Department: Public Services City, St., Zip: Lakeland, FL 33811 Telephone:(863) 646-5078 DESCRIPTION OF CHANGE: Alteration, deviation, addition, or deletion caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary). Additive change order in the amount of $31,875.04 for additional IO/DO modules and Stratix switches required on panels 160-PLC-1, 120-PLC, and 100-MCP-1. ITEM AMOUNT A. ORIGINAL CONTRACT VALUE: $ 44,300,000 B. AMOUNT OF THIS CHANGE ORDER: $ 31,875.04 Must be within the overall scope of services in accordance with contract specifications. C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): % 0.1% D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 22,819.33 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $ 54,694.37 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 10% Maximum % 0.1% G. NEW CONTRACT VALUE (A+E) $ 44,354,694.37 This Change Order is not valid without the following signatures: EDocuSigned by: DocuSigned by: AwtA& Vb')LL 5/3/2024 E D� 6kvu" 5/3/2024 C66944C6F28 55CD3AA529D0464... 5425... CONTRACTOR Date PROJECT ARCHITECT / ENGINEER Date DocuSigned by: ir� DocuSigned by: E fbin J bVWA SbV1 5/6/2024 E0 bl s 5/6/2024 014063B8FF4140F... 534781168A394C8... DEPARTMENT DIRECTOR Date PROCUREMENT DIRECTOR / Date CITY MANAGER Council approval is required if change order(s): 1) exceeds $49,999; 2) exceeds the greater of $100,000 OR 10% of the original contract amount for construction projects; 3) the funds are not available in the approved budget for the department. CITY OF CLERMONT ATTEST: MAYOR Date CITY CLERK Date Rev. 1-1-2021 DocuSign Envelope ID: B61AB57A-7184-4BC7-85F2-OFA13ABED13F V4MGEL. 33It05. BUILDING CO. better people = better builders' April 4, 2023 Kinz Consulting LLC 235 Harbour Cove Way Clermont, FL 34711 Aft: James Kinzler RE: PCO#03 Control Panel Modifications Mr. Kinzler, Per submittal 13430-2.0 control panel drawings response additional 10 and DO modules are to be added. Additional Stratix switches are required on panels 160-PLC-1, 120-PLC and 100-MCP-1. Vogel Bros. Building Co. is requesting a change order be issued for $31,875.04 for this change and that, at this time, no additional time be added to the contract completion date. The breakdown of these additional costs is attached. Should you have any questions concerning this request, please do not hesitate to contact me. Sincerely, 'V'OGFi7L 04/04/2024 11:03:56 AM Andrew Decker Director of Operations Vogel Bros. Bldg. Co. CC: File CC: Darren Vogel P.E. 2720 Drone Field Road, Lakeland, FL 33811 1 863.W.5078 office I CGC 1509018 1 www.vogeP*ig.com An Equal Opporturuty Employer DocuSign Envelope ID: B61AB57A-7184-4BC7-85F2-OFA13ABED13F a w o -3 n o C S pgID �y n o � - is C a s O a 0 i Py n m v0. O 'S' x' a �••� -0 o !< � f�c �• � ID M •y CLR y �N ,�y 'c tj 6 CL CD H o o g a 5 W O S ^a o 2 � E �� f■, � O o - n to � � o c �• o A B O 0 Y $ g C p' p 3 ► a p Q x ^ 8 :> 85 o Ow «N ««««N N«« 3 p N o -I �• s N (D e IOCID r r � r ❑ o 5� A M p � i» ° o I « w N w N N« w w«« 'II Cf' o t" g N««««««N««« c 5'. r r r o N N N M N N« N u M« �. �• w W G rn O Iu �• DocuSign Envelope ID: B61AB57A-7184-4BC7-85F2-OFA13ABED13F is REVERE Vogel Bros. Building Co. Lakeland,FL 3/25/2024 Andrew Decker Senior Project Manager 2720 Drane Field Rd As Lakeland, FL 33811 Reference: Additional IO cards added to 160 PLC panel & Additional Stratix Switches Clermont, FL —EWRF Improvements— Revere's Project # AD0343 (COP-001 Rev.1) Dear Mr. Decker, Revere Control Systems, Inc. is pleased to submit a proposal for the requested changes. Our proposal includes the following equipment and services. Eouinment / Materials Supply the following additional IO cards to 160-PLC-1 Control panel: A- Quantity: One (1) AB Controll-ogix 16 points DI Card Part # 1756-IB16I B- Quantity: One (1) AB ControlLogix 16 Points DO Card Part # 1756-OW16I C- Terminal blocks, Relays, wiring... etc. (As required) • Supply Quantity: 'Three (3) Stratix Switches Part # 1783HMS16T4CGN Switches to be installed inside 160-PLC-1 ,120-PLC & 100-MCP-1 Services Additional Engineering hours to revise the drawings. Additional CAD & Documentation hours to revise the drawings. Additional production hours to install and wire the added two modules. Additional IO cards to 160-PLC-1 panel & Stratix Switches Commercial Terms • This proposal is valid for thirty (30) days from the date of the proposal. • Net 30 days after date of invoice. Respectfully Submitted, jl�r-5a, PeterBasllp, PMP Project Manager Revere Control Spstems, INC. $ 26398.00 Revere Control Systems, Inc. 11 2240 Rocky Ridge Road Il B , . reverecontrol.com