Contract 2023-013A CO (3)DocuSign Envelope ID: A6AE23B6-27C9-4280-8DC7-1638lC494668 CHANGE ORDER FORM Contract / P.O. Number: 2023-013 / 20234681 Change Order Number: 3 Project Name: Sunburst Lane Water Treatment Job Location: Sunburst Lane, Clermont VENDOR INFORMATION: Company Name: L7 Construction, Inc. Address: 275 Hunt Park Cove Contact Name: Rachael Quinn Bid Number: RFB 23-007 Change Order Date: May 9, 2024 Department: Public Services City, St., Zip: Longwood, FL 32750 Telephone: (321) 972-9325 DESCRIPTION OF CHANGE: Alteration, deviation, addition, or deletion caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary). Recording change orders 18 to 21 and adjusting the contract value adding the total of $69,222.27. See attached change orders for details. ITEM AMOUNT A. ORIGINAL CONTRACT VALUE: $ 6,946,700.00 B. AMOUNT OF THIS CHANGE ORDER: $ 69,222.27 Must be within the overall scope of services in accordance with contract specifications. C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): % 1.0% D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ -981,871.75 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $ -912,649.48 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 10% Maximum % -13.1% G. NEW CONTRACT VALUE (A+E) $ 6,034,050.52 This Change Order is not valid without the following signatures: DocuSigned Eby: &ulnl�' DocuSigned by: f� Eo 5/28/2024 5/28/2024 C8CDE15F09824EA... 195C18C388BB4B6... CONTRACTOR Date PROJECT ARCHITECT / ENGINEER Date EsDocuSigned by: DocuSigned by: fb" bV1"w, 5/28/2024 5� 6 5/29/2024 014063B8FF4140F... E431F57D413554D6... DEPARTMENT DIRECTOR Date PROCUREMENT DIRECTOR / Date CITY MANAGER Council approval is required if change order(s): 1) exceeds $49,999; 2) exceeds the greater of $100,000 OR 10% of the original contract amount for construction projects; 3) the funds are not available in the approved budget for the department. CITY OF CLERMONT ATTEST: MAYOR Date CITY CLERK Date Rev. 1-1-2021 DocuSign Envelope ID: A6AE23B6-27C9-4280-8DC7-16381C494668 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 Phone: (321) 972-9325 Fax: 407-732-7812 PCCO #018 Project: 22-039 - 22-039 Sunburst Lane WTP Improvements 3335 Hancock Road Clermont, Florida 34711 Prime Contract Change Order #018: ODP- Pipe Materials for Changes to Flange Pipe at Well House C8 and C9 TO: City of Clermont FROM: L7 Construction, Inc. 685 W. Montrose Street 275 Hunt Park Cove Clermont, Florida 34711 Longwood, Florida 32750 DATE CREATED: 12/11/2023 CREATED BY: Rachel Quinn (11-7 Construction, Inc.) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED FROM: DESIGNATED REVIEWER: Rachel Quinn (11-7 Construction, Inc.) DUE DATE: 12/13/2023 INVOICED DATE: REFERENCE: PAID IN FULL: ACCOUNTING METHOD: SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No Amount Based LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON EXECUTED: SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: ODP No CONTRACT FOR: 1:Owner Contract TOTAL AMOUNT: ($923.47) DESCRIPTION: CE #033 - ODP- Pine Materials for Chances to Flange PIDe at Well House C8 and C9 Change order to deduct the ODP portion of the adder for adding the following materials in change proposal #17. • (2) Pipe boots for the 4" drain PVC pipe • (2) 12" blind flanges ATTACHMENTS: ►f7 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changewl by this Change Order. Mike Scullion (Halff Associates, Inc.) City of Clermont 902 N. Sinclair Avenue 685 W. Montrose Street Tavares, Florida 32778 Clermont, Florida 34711 0��" 5--5� SIGNATURE 1.4.24 L7 Construction, Inc. $6,946,700.00 ($981,561.80) $5,965,138.20 ($923.47) $5,964,214.73 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 s'7)2y DATE SIGNATU DATE SIGNATURE DATE Page 1 of 1 Printed On: 12M 12023 08:34 AM DocuSign Envelope ID: A6AE23B6-27C9-4280-8DC7-1638lC494668 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 Phone: (321) 972-9325 Fax: 407-732-7812 PCCO #019 Project: 22-039 - 22-039 Sunburst Lane WTP Improvements 3335 Hancock Road Clermont, Florida 34711 Prime Contract Change Order #019: 24" Raw Watermain TO: City of Clermont 685 W. Montrose Street Clermont, Florida 34711 DATE CREATED: 1/30/2024 CONTRACT STATUS: Pending - In Review REQUEST RECEIVED FROM: DESIGNATED REVIEWER: Rachel Quinn (11-7 Construction, Inc.) DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: No ACCOUNTING METHOD: Amount Based SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No FROM: CREATED BY: REVISION: LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON: EXECUTED: SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: TOTAL AMOUNT: L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 Rachel Quinn (L7 Construction, Inc.) 0 Existing Condition No 7 days 1:Owner Contract $88,6 51 DESCRIPTION: CE #038 - 24" Raw Watermain Background: The existing 16" watermain has been found to reduce to 12" then increase back up to 24" before it reaches the ground storage tanks. The line must be replaced to provide a 24" watermain where the four wells converge to meet required flow demands. Scope of Work: Remove the existing watermain from the Heritage Hills Well and the Hancock Road Well and replace it with a 24" raw watermain. ATTACHMENTS: Drawino for Pice.Ddf, 22-039 Proposed Sequence of Work.ndf The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will be increased by this Change Order by 7 days. Mike Scullion (Halff Associates, Inc.) City of Clermont 902 N. Sinclair Avenue 685 W. Montrose Street Tavares, Florida 32778 Clermont, Florida 34711 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 $6,946,700.00 ($981,561.80) $5,965,138.20 $88,684.51 $6,053,822.71 SIGNATURE 1.30.24 DATE SIGNA RE DATE SIGNATURE DATE L7 Construction, Inc. Page 1 of 1 Printed On: 1/30/2024 08:14 AM DocuSign Envelope ID: A6AE23B6-27C9-4280-8DC7-16381C494668 i 22-039 Clermont Sunburst Lane 2C Raw Watermain Replacement 22-039 Clermont Sunburst Lane- 24" Raw Watermain Change Order Proposed Sequence of Work Background: The existing 16" watermain has been found to reduce to 12" then increase back up to 24" before it reaches the ground storage tanks. The line must be replaced to provide a 24" watermain where the four wells converge to meet required flow demands. Reducer. Figure One: Existing Raw Wat rrnain Laayaut Scope of Work: Remove the existing watermain from the Heritage Hills Well and the Hancock Road Well and replace it with a 24" raw watermain. Sequence of Work- Phase One Work to be Completed Prior to the Shutdown 1. Excavate the area to expose the existing pipe and prefabricate the new pipe as much as possible. 2. Secure conduit and other existing utilities to create a safe working zone. 1 DocuSign Envelope ID: A6AE23B6-27C9-4280-8DC7-16381C494668 22-039 Clermont Sunburst Lane 24" Raw Watermain Replacement 3. Install one 24" tapping saddle with 2" tap, and one 16" tapping saddle with 2" tap, on the existing pipe. Drill the existing pipe and plug the tapping saddle till we are ready to shutdown the system. Work to be Completed Durine the Shutdown (3-4 hour shutdown window required) 1. Shutdown the Hancock Road, Heritage Hills, and Sunburst Lane wells. A 3-4 hour shutdown will be required. 2. Connect 2" lay flat hose to the 24" and 16" tapping saddles and drain the water from the raw water main to the stormwater pond onsite. 3. Cut the existing 24" and 16" pipe to remove the 24" x 12" reducing manifold shown in figure one. 4. Install the new pipe shown in the layout for phase one. This pipe will not be pressure tested nor bacteria tested. This pipe section will be swabbed in lieu of performing bacteria testing. 5. After the pipe is installed, the Sunburst Lane and Hancock Road wells can be brought back online. Air will be released through the 24" tapping saddle on the existing 24" pipe. After the air is released, the tapping saddle will be plugged. The new 24" MJ gate valve on the right-hand side of phase one in figure two will remain closed while we install the rest of the new pipe for well house C9 and the Heritage Hills well. Sequence of Work- Phase Two 1. The well at Heritage Hills will need to remain offline to complete the work shown in phase two. The remaining area will be excavated to expose the existing pipe. 2. The existing 16" pipe will be cut and removed out of the way. 3. The remaining pipe shown in figure two will be installed, tieing into the remaining raw watermain, as well as the new pipe going to well house C9. 4. After the pipe is installed, the line will be pressured tested. The pressure test will start from the closed 24" MJ gate valve that was installed in phase one, to the new 16" MJ gate valve on the right-hand side of phase two. It will also include all of the new 20" and 16" pipe going to well house C9. 5. After this run is pressure tested, bacteria tests will be performed. The samples will be taken from the taps located on the new pipe at well house C9. The bacterial testing will occur over two days, one sample taken each day. 6. After the bacteria tests are passed, the Heritage Hills well can be brought back online. The 20" MJ gate valve on the pipe run going to well house C9 will remain closed, the new 16" MJ gate valve on the pipe run going to the —Heritage 'Hills -well will open and the-24" MJ gate valve in phase one will - open, allowing the water from the Heritage Hills well to go to the ground storage tanks. Any air in the system can be let out through the 24" or 16" tapping saddles shown in figure two. After the air is let out, the tapping saddles will be plugged. 2 DocuSign Envelope ID: A6AE23B6-27C9-4280-8DC7-16381C494668 22-039 Clermont Sunburst Lane 24" Raw Watermain Replacement Figure Two: Proposed Sequence of Work Anticipated Schedule: • This work would occur after the new ground storage tank has been leak tested, the area has been backfilled, and the sheet piles have been removed. • Phase one will take one day to prep, and one day for the shutdown to install the new piping shown in figure two. • Phase two will take two days to install, one day to pressure test, and two days of bacteria testing. Heritage Hills can be brought back online after the bacteria testing has passed. Items to Confirm with Owner & Engineer: • How long can the three wells (Heritage Hills, Sunburst Lane, and Hancock Road) be down for at the same time? • How long can the Heritage Hills well be down for during phase two? • Are bacteria tests required on raw watermains? 3 o ms)nevel 7eO Dm- c- m$DC %1gec kma ; � ° { tea! !| �![|)i■| k� k| � !! E . - , ! | k �! I �| | � § � }! �! �! �! �! �! k| !! )if1) ! !| %k{�f ■ ! in . !;f$! 2E k#! f E | k ! § DocuSign Envelope ID: A6AE23B6-27C9-4280-8DC7-1638lC494668 M L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 Phone: (321) 972-9325 Fax:407-732-7812 PCCO #020 Project: 22-039 - 22-039 Sunburst Lane WTP Improvements 3335 Hancock Road Clermont, Florida 34711 Prime Contract Change Order #020: ODP- Pipe Materials for 24" Raw Watermain TO: City of Clermont 685 W. Montrose Street Clermont, Florida 34711 DATE CREATED: 1/30/2024 CONTRACT STATUS: Pending - In Review s REQUEST RECEIVED FROM: DESIGNATED REVIEWER: Rachel Quinn (11-7 Construction, Inc.) DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: NL, ACCOUNTING METHOD: Amount Based SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No FROM: CREATED BY: REVISION: LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON: EXECUTED: SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: TOTAL AMOUNT: L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 Rachel Quinn (L7 Construction, Inc.) 0 ODP No 1:Owner Contract (:04b,11124n) — utsUrur I run: CE #039 - ODP- Pine Materials for 24" Raw Watermain Change order to deduct the ODP portion of the adder for adding the following materials in change proposal #19. • (1) 24" MJ Tee • (1) 24" x 20" MJ Reducer • (1) 24" x 16" MJ Reducer • (20 LF)16" Mechanical Joint Pipe • (1) 16" MJ Gate Valve • (120 LF) 24" Mechanical Joint Pipe • (20 LF)12" Mechanical Joint Pipe • (1)12" MJ Gate Valve • (9) 24" Gripper Gaskets • (11) 24" Megalug Kits • (5)16" Megalug Kits • (3)12" Megalug Kits • (3) Valve Boxes 7 (1) 24" x 2" Tapping Saddle (1)16" x 2" Tapping Saddle ' (2) 2" Plugs for Tapping Saddles ATTACHMENTS: L7 Construction; Inc_ Page 1 of 2 Printed On: 1/30/2024 08:21 AM DocuSign Envelope ID: A6AE23B6-27C9-4280-8DC7-16381C494668 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. Mike Scullion (Halff Associates, Inc.) City of Clermont 902 N. Sinclair Avenue 685 W. Montrose Street Tavares, Florida 32778 Clermont, Florida 34711 PCCO #020 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 $6,946,700.00 ($981,561.80) $5,965,138.20 ($45,112.24) $5,920,025.96 SIGNATURE 1.30.24 DATE S1 CIA RE DATE SIGNATURE DATE L7 Construction, Inc. Page 2 of 2 Printed On: 1/30/2024 08:21 AM DocuSign Envelope ID: A6AE23B6-27C9-4280-8DC7-1638lC494668 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 Phone: (321) 972-9325 Fax: 407-732-7812 PCCO #021 Project: 22-039 - 22-039 Sunburst Lane WTP Improvements 3335 Hancock Road Clermont, Florida 34711 Prime Contract Change Order #021: Electrician Scope for Installation of Keypads at Well House Exterior Doors TO DATE CREATED: CONTRACT STATUS: REQUEST RECEIVED FROM: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: ACCOUNTING METHOD: SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: City of Clermont 685 W. Montrose Street Clermont, Florida 34711 1 /30/2024 Pending - In Review 01131 /2024 No Amount Based FROM: CREATED BY: L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 Rachel Quinn (L7 Construction, Inc.) REVISION: 0 LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON: EXECUTED: Client Request No SCHEDULE IMPACT: 6 days REVISED SUBSTANTIAL COMPLETION DATE: No CONTRACT FOR: 1:Owner Contract TOTAL AMOUNT: $26,573.47 DESCRIPTION: CE #040 - Electrician Scone far Installation of Kevoads at Well House Exterior Doors Need to install conduit from the door frames to the existing electrical room to connect the keypads to the city's security network. This requires additional conduit and wire from each well house. The electricians will also install a junction/POE switch box next to the doors to make the connection from the keypad supplied wire to the wire A -Electric is installing. A pullbox will be installed outside of the well houses and will have an additional 200 feet of fiber spooled up as spare. A -Electric is providing the following materials: *(2) Pull boxes *(2) 2" aluminum 90s with 20 feet of aluminum conduit *(200 LF) 3/4" SCH 80 PVC conduit *(12) 3/4" Meyer Hubs *(6) 2" Meyer Hugs *(2) 4" Boxes with rings *(200 LF) CAT 6 wire Conduit for the keypads and POE switch will be installed in the slab and walls, it will not be installed overhead. The additional fiber for the keypads going to the existing electrical building, will be installed in the same conduit that is being used for the other fiber for the other equipment. TPC is providing 1,500 LF of fiber to connect the well houses to the existing electrical building network switch. City of Clermont will need to provide a POE switch for each well house to connect the keypads to the fiber network. This is excluded from our scope and Convergint's scope. If the existing network hardware can not support the new keypads for well house C8 and C9, the city will need to provide the hardware to allow our electrician to terminate the new fiber wire to the cty's security system in the existing electrical building. This proposal excludes (these items are to be provided by Convergint, contracted directly with the city): • Providing the keypad hardware • Installation of the keypads • Programming to configure the keypads in the city's security network L7 Construction, Inc. Page 1 of 2 Printed On: 1/30/2024 01:21 PM DocuSign Envelope ID: A6AE23B6-27C9-4280-8DC7-1638lC494668 ATTACHMENTS: The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will be increased by this Change Order by 6 days. Mike Scullion (Halff Associates, Inc.) City of Clermont 902 N. Sinclair Avenue 685 W. Montrose Street Tavares, Florida 32778 Clermont, Florida 34711 SIGNATURE 2 22 24 DATE *IGNAT9E DATE L7 Construction, Inc. Page 2 of 2 PCCO #021 $6,946,700.00 ($981,561.80) $5,965,138.20 $26,573.47 $5,991,711.67 L7 Construction, Inc. 275 Hunt Park Cove Longwood, Florida 32750 SIGNATURE DATE Printed On: 1/30/2024 01:21 PM