Loading...
2006-11• March 28, 2006 Mr. Wayne Saunders City Manager Clermont City Hall P. O. Box 120219 685 West Montrose Street Clermont, Florida 34712 RE: CITY OF CLERMONT FIRE STATION NO 1 ADMINISTRATION ADDITION Dear Mr. Saunders: C. T. Hsu + Associates, P.A. (CTH+A) is most pleased to submit this fee proposal for our professional services for the New Fire Station 1 Administration Addition project. PROJECT DESCRIPTION We will initiate the design process by meeting with representative of the City of Clermont, and Fire Chief to hear specific project goals and needs. We will visit and discuss with staff the proposed program and site. We will analyze the preliminary program that was prepared and develop a final Building Program which will include proposed square footage requirements, spatial adjacencies, conceptual site diagrams, and a preliminary • probable cost of construction. 11. SCOPE OF SERVICES CTH+A proposes to provide the following professional design services for the Project: Programming 1.1 Review preliminary list of needs provided by Clermont. 1.2 Spatial Relationships 1.3 Needs for Flexibility and Expandability 1.4. Site Requirements 1.5 Develop Building Program 2. Conceptual Site Diagrams 2.1 Site Analysis 2.2 Planning Ordinances 2.3 Functional Relationships with existing facility 2.4 Access !Circulation 3. Deliverables 3.1 Two (2) bound 8.5"x11" copies of the report documenting preliminary design concepts for both sites. 3.2 Building Program 3.3 Preliminary probable cost • 4. Design Development 3.1 Two sets of developed building design and preliminary engineering layouts for review by Owner. 3.2 Outline Specifications 3.3 Updated probable cost 5. Construction Documents 4.1 Permit Set of Architecture and Engineering for Building Department 4.2 Bid Set for traditional bid delivery 4.3 Final Specifications 111 TIME SCHEDULE We understand the City's desire to proceed and we propose to produce our draft report for your review and final comments in 3 weeks time, once we have received your final comments we will incorporate them into our final report within one week. CTH+A will work diligently with the City to meet the project schedule requirement. Our staff is sufficient to meet your design schedule and our present workload would allow us to start immediately upon notice to proceed. IV FEE SCHEDULE • CTH+A proposed to provide professional design services as described in our Scope of Services for a lump sum fee of One Hundred Five Thousand Dollars (5105,000.00) with the following payment schedule: Programming Schematic 15% Design Development 20% Construction Documents 40% Bidding/Permitting 05% Construction Admin 20% V REIMBURSABLE EXPENSES Reimbursable Expenses: The costs of items such as long distance telephone, fax, Xerox copies, presentation materials, blueprinting, postage, plotting and other project related costs are separate from this Contract at a cost plus 10°!0. These costs will be billed at the first of each month and are due upon receipt of invoice. VI TERMS AND CONDITIONS Terms and conditions for our services including additional services will be per the AIA Document 6141 Standard Form of Agreement Between Owner and Architect. V11 EXCLUSIONS • Survey, Geotechnical Engineering, Environmental Services and Civil Engineering are excluded from our proposal. Wayne, we very much appreciate your taking time out to meet with Tim so that we could prepare this proposal for this project. If there is any additional information that you need or if you have any questions regarding our proposal, please do not hesitate to ca11 so that we may meet to discuss it. Sincerely, C.T. SU + SS~~OCw~IA_TES, P.A. ~v _ C. T. Hsu, AIA President cc: Tim McNicholas, AIA r~ LJ