Contract 2023-028A COODocuSign Envelope ID: C782D3ED-23FF-4BD1-99ED-36C32ED07734 CHANGE ORDER FORM Contract / P.O. Number: 2023-028 / 20235048 Change Order Number: 6 Project Name: East Side Water Reclamation Facility Job Location: Clermont East WRF VENDOR INFORMATION: Company Name: Vogel Bros. Building, Co. Address: 2720 Drane Field Road Contact Name: Andrew Decker Bid Number: RFB 23-002 Change Order Date: Jul 1, 2024 Department: Public Services City, St., Zip: Lakeland, FL 33811 Telephone:(863) 646-5078 DESCRIPTION OF CHANGE: Alteration, deviation, addition, or deletion caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary). Additive change order in the amount of $13,115.20 for sludge blanket indicator provisions at clarifier No. 5. ITEM AMOUNT A. ORIGINAL CONTRACT VALUE: $ 44,300,000 B. AMOUNT OF THIS CHANGE ORDER: $ 13,115.20 Must be within the overall scope of services in accordance with contract specifications. C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): % 0.0% D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 116,376.84 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $ 129,492.04 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 10% Maximum % 0.3% G. NEW CONTRACT VALUE (A+E) $ 44,429,492.04 This Change Order is not valid without the following signatures: EP DocuSigned by: DocuSigned by: AWt AA' Vbtyl 7/1/2024 E�'� 6' vu" 7/1/2024 55CD3AA529D0464... C66944C6F285425... CONTRACTOR Date PROJECT ARCHITECT / ENGINEER Date EsDocuSigned by: DocuSigned by: fb" bV1"w, 7/2/2024 Suci�e� 7/2/2024 � 014063B8FF4140F... 431F57D413554D6... DEPARTMENT DIRECTOR Date PROCUREMENT DIRECTOR / Date CITY MANAGER Council approval is required if change order(s): 1) exceeds $49,999; 2) exceeds the greater of $100,000 OR 10% of the original contract amount for construction projects; 3) the funds are not available in the approved budget for the department. CITY OF CLERMONT ATTEST: MAYOR Date CITY CLERK Date Rev. 1-1-2021 DocuSign Envelope ID: C782D3ED-23FF-4BD1-99ED-36C32ED07734 V400GEL SROS. 8UI3L.3DIN0- CO. better people = better builders' June 21, 2024 Kinz Consulting LLC 235 Harbour Cove Way Clermont, FL 34711 Attn: James Kinzler RE: PCO#07 Sludge Blanket Indicator Provisions Mr. Kinzler, Please see PCO attached requesting a change order for the Sludge Blanket Indicator provisions at Clarifier No.5. While drawing D-503 detail 7 indicates that there is to be an instrument installed for this application the electrical drawings and instrument drawings did not provide provisions for the the instrument and how it was to be controlled, powered, and integrated into the SCADA system. The cost of the instrument itself and associated mounting equipment will be absorbed by VBBC. Vogel Bros. Building Co. is requesting a change order be issued for $13,115.20 for this change and that, at this time, no additional time be added to the contract completion date. The breakdown of these additional costs is attached. Should you have any questions concerning this request, please do not hesitate to contact me. Sincerely, 'Ir OC111- 3300i. V-9. as:zn:xa 00. be+m - berg 06/21 /2024 9:58:20 . Andrew Decker Director of Operations Vogel Bros. Bldg. CC: File CC: Darren Vogel P.E. 2720 Drone Eield Road, Lakeland, FL 33811 1 863.646.5078 office I CGC 1509,018 An Equal opportunity Employer DocuSign Envelope ID: C782D3ED-23FF-4BD1-99ED-36C32ED07734 y a Bye Q 0, o c s � � "• a � � a � 00 48, ll FF a NIP Q i� m y IL 0 � � d 0 aw (NTH D n O O m a El n " r 41 r O y �^ n � W R• R � � [n 2 S "s A W g O of o �. g 0 1 n A 5. 0 CID s x P3CD a C �e e ? 5 ro n y O N 110, �� g R. p »moo«w»u w«»» O �i C C O _ cr _ _ »w «» w a u»«J. o ms)nUvel opeID:ce2D3ESaFR4Bm- Ey36c2Eo77 k 0 / CD■ \}k (§ § § \ CD°22 &§ ,' ■ 2 _ 2 ■� L4 c. ■ C n CD 0� m % )� §�§ ) 5 2 . 2 %4 cK go CCL M �§/ P m , m ■ CL �3 k _ o § - 0 c o \E IA k -§7 @ § t �0 ) � Ra . 0 ® 0 3 RO §\§ 2m §§ (VT oo ¢ kC/ ACE _ � _ ksi ` cr # E - K %§7(°( § k\ a'§§ \I" DocuSign Envelope ID: C782D3ED-23FF-4BD1-99ED-36C32ED07734 OREVERE May 2318, 2024 Andrew Decker Senior Project Manager Vogel Bros. Building Co. 2720 Drane Field Rd Lakeland, FL 33811 Vogel Bros. Building Co. Lakeland,FL Reference: Program, Calibrate, Test and Start-up of Sludge Blanket Indicator at Clarifier No. 5 (CO-05 . Rev.0) Clermont, FL EWRF Improvements — Revere's Project No. AD0343 Dear Mr. Decker: Revere Control Systems, Inc. is pleased to submit a proposal for the requested additions, Our proposal includes the following equipment and services. Eauipment / Materials N/A Services • Eight (8) Engineering Hours to update the drawings, modify the PLC program, test the signal and functionality during Unwitnessed and Witnessed Factory testing and testing the signal and start-up onsite. • Four (4) Field service hours to set and calibrate the field Instrument. • Two (2) CAD Hours to update the drawings. • Two (2) Documentation Hours to update the drawings. • Two (2) PM Hours for internal and external coordination. Addition of Sludge Blanket Indicator at Clarifier No.5 S 2.084.91 6% Sales Taxes S 125.09 Total Including Sales Taxes $ 2,210.00 Commercial Terms • This proposal is valid for thirty (30) days from the date of the proposal. • Net 30 days after date of invoice. Respectfully Submitted, Peter Basily, PMP Project Manager Revere Control Systems, Inc. Revere Control Systems, Inc. 11 5201 Princeton Way H Hoover, AL 35226 11 205.824.0004 // reverecontrol.com DocuSign Envelope ID: C782D3ED-23FF-4BD1-99ED-36C32ED07734 �ty:«°r, fivectfic saffieffso Inc. s ESI' INDUSTRIAL COMMERCIAL ELECTRICAL CONTRACTORS & ENGINEERS EC#0001415 EC#13004103 CA#9435 f' 1746 US Hwy 441 / Leesburg, FL 34748-7055 - Telephone (352) 787-1322 / Fax (352) 787-7871 June 20, 2024 Vogal Bros. Building Co. 4223 S Pipkin Rd. Lakeland, FL Attn: Andrew Decker PH: 863-255-8186 Project: RCO-2141-003 Clarifier No.5 - Sludge Blanket Indicator Clermont Eastside WRF Dear Andrew: Electric Services, Inc. is pleased to offer the following proposal for the above referenced project. Pricing includes all applicable materials, equipment, freight, labor, and taxes. If you would like us to proceed with the work, please send written authorization for us to proceed and issue a change order to our subcontract agreement as follows: Included in Scope of Change Request: • Sludge Blanket Indicator connection to 160-PLC-1 using 2/C #16 STP cable (4-20mA signal) • Sludge Blanket Indicator power connection to 160-LP-1 with 2#12 AWG and 1#12 AWG GND • Mount Sludge Blanket Indicator transmitter Not Included in Scone of Change Request: • Sludge Blanket Indicator integration/programming to SCADA • Sludge Blanket Indicator calibration/factory settings • Sunshield, SPDs and any accessory (probes) necessary for the normal operation of the instrument Amount 1 $9,500.00 J This work was not part of Electric Services' original scope of work. This proposal is valid for (30) thirty days. If accepted after (30) thirty days additional costs may apply. Electric Services, Inc. reserves the right to modify this request for unforeseen contingencies. No additional contract days are anticipated to complete this work. This change proposal is inclusive of scope changes that are clearly indicated by clouded deltas and/or narrative descriptions as described above. No other changes have been evaluated at this time and are not included in this change order request. Please call if you have any questions or if we can further assist you in any way. Respectfully, Electric Services, Inc. DocuSign Envelope ID: C782D3ED-23FF-4BD1-99ED-36C32ED07734 I ITEM NO. II 1 Bill of Materials 2 Fixtures 3 Gear 4 Devices I I ADDITIONAL LABOR (Estimating Material Handling Electric Services, Inc. Cost Summary Clermont Eastside WRF RCO-2141-003 Clarifier No.5 Sludge Blanket indicator June 20, 2024 Self -Performed by Electric Services, Inc. I Subtotal - Materials Sales Tax @ 7% I Materials including tax Subcontractor Quotes II MATERIAL -DOLLARS 1I LABOR-HOURSI 4,277.81 52.20 4277.81 299.45 4.577.25 Ij TOTAL -SUBCONTRACTORS QUOTES $ - i1 HOURS j Miscellaneous Material and Labor $ 4,577.25 1 52.20 8.00 Additional Labor Hours f I 8.00 TOTALS - MATERIAL, LABOR, SUBCONTRACT $ 4,577.25 60.20 60.201 Electrician Labor Hours @ $ 50.00 3,010.00' TOTAL 8.00 Overtime Labor Hours @ $ 75.00 1 HOURS I ESI EQUIPMENT I RATE II DOLLARS I Subtotal Labor Auger/Bucket Truck S 90.00 a - 32% Labor Burden Backhoe/Excavator $ 75.00 $ - LABOR COST GROSS TOTAL Trencher $ 55.00 $ - Equipment Rental and Job i=xpense Lull $ 75.00 $ - Material, Labor, Subcontract Expense Scissor Lift $ 45.00 $ - TOTAL PRIME COST JOB EXPENSE IStorage / Material Mgt. / Misc. Contingency 1Freight (Plots and Drawings Ismail Tools - Consumable jEquipment Rental Cost - Other TOTAL, $ 10% Overhead & Profit TOTAL NET COST Selling Price without Bond 1.0% Bond Selling Price with Bond "PRICE QUOTED" 3,010.00 963.20 3,973.20 0.00 4,577.25 8,550.45 855.05 9,405.50 9,405.50 94.06 9,499.56 $9,500.00 DocuSign Envelope ID: C782D3ED-23FF-4BD1-99ED-36C32ED07734 uvmx,,:,u,w-ovu.�raO�Erme„mmoae�,a,nmru,.sa,...�._::.,.owa -w.�wa wee Ha 1 �go A� 2 F�4 ;;;J P10 a "a 3 F v } CITYOFCLERMOW # CM&OW WARER EtBC-LXQrm5wPkRIT,t Y Y F7(PAN910N OPROCESS DETAILS P S'A I x I ! E F� R ® TETRA TECH � m, uer rrEn,agr,wmE,am WANDO.RYW1 PI,Of�:NM t,F ]Rd F,Jh Mai •NJ1W y