Contract 2024-035A ACITY MANAGER 7.J. MEMORANDUM To: The Honorable Mayor and City Commissioners From: The City Manager Date: April 24, 2023 Subject: Amendment No. 3 to the Agreement with Inliner Solutions, LLC for Sanitary Sewer, Manhole, and Lift Station Wet Well Rehabilitation Introduction: Approval of Amendment No. 3 to the Agreement with Inliner Solutions, LLC to extend the term and revise the pricing schedule for sanitary sewer, manhole, and lift station wet well rehabilitation, on an as -needed basis, for an amount not to exceed $1,000,000 annually, is requested. (Ref: RFP-2019-0467) Background: The City of Casselberry owns and operates a wastewater collection and transmission system consisting of gravity sewer lines, manholes, and lift stations. Public Works & Utilities staff have inspected and identified areas of the gravity sewer collection system that may suffer from inflow and infiltration problems and require rehabilitation. The gravity sewer pipe within the identified areas is older vitrified clay pipe (VCP) and can often suffer from breaks, intrusion, and leaks. For over a decade, the gravity sewer system has been rehabilitated using cured -in -place -pipe (CIPP) liner. Many of the gravity sewer manholes in the City's collection system are built from bricks and mortar and can often suffer from breaks, intrusion, and leaks. Spray -on epoxy liners have been used to rehabilitate the manholes over the last several years. The City's lift station wet wells can also suffer from infiltration and have historically been rehabilitated with injection grouting and spray -on epoxy liners. RFP-2019-0467 was issued on April 4, 2019, requesting proposals from qualified firms for a Continuing Services Agreement for Sanitary Sewer, Manhole, and Lift Station Wet Well Rehabilitation. An evaluation committee made up of Public Works & Utilities staff met on May 16, 2019 and Granite Inliner, LLC was chosen as the most qualified candidate to perform these services. City Commission approved the agreement with Granite Inliner for sanitary sewer, manhole, and lift station wet well rehabilitation services on June 10, 2019 through June 9, 2022, with the option to renew for two additional one-year periods, for an amount not to exceed $1,000,000 annually for the term of the agreement. On March 1, 2022, the City's Procurement Manager authorized Amendment # 1 to the agreement with Granite Inliner extending the agreement one year to June 9, 2023. Amendment #2 was executed on August 2, 2022 by the City Manager in order to change the legal name of the firm from Granite Inliner, LLC to Inliner Solutions, LLC. Discussion: Amendment #3 to the agreement with Inliner Solutions, LLC extends the term and revises the pricing scheduled of the agreement with Inliner Solutions, LLC for sanitary sewer, manhole, and lift station wet well rehabilitation services. The agreement extension is for one year from June 10, 2023 through June 9, 2024 and is the final renewal available with this agreement. Inliner Solutions submitted a request to revise the original pricing schedule. The updated pricing schedule is incorporated into Amendment #3. It should be noted that there is no change to the total annual compensation not -to -exceed amount of $1,000,000. It should be noted that the not -to -exceed amount is established as a means to provide the maximum authorization. However, this amount does not imply actual expenditures since various departments must work within their budget parameters and availability of funds is verified prior to issuance of a purchase order. Task authorizations will be issued as work is identified. In addition, appropriations beyond Fiscal Year 2023 are subject to future City Commission approval. Budget Impact: Funding is available in the FY 2023 Water and Sewer Utility Fund and Renewal/Replacement Distribution and Collection accounts: Repair and Maintenance/Sewer account #401-0751-536.46-03 - $50,000 for manhole lining Repair and Maintenance/Emergency account #401-0751-536.46-05 - $75,000 for emergency lining Renewal/Replacement account #402-0751-536.63-12 - $400,000 for various gravity sewer lining Recommendation: The City Manager and Public Works & Utilities Director recommend approval of Amendment #3 to the agreement to extend the term and revise the price schedule with Inliner Solutions, LLC for sanitary sewer, manhole, and lift station wet well rehabilitation, on an as -needed basis, in an amount not to exceed $1,000,000 annually, and to simultaneously authorize the City Manager to approve all task authorizations within the scope of the contract, subject to available funding. Prepared bv: Tara Lamoureux, Utility Divisions Director Attachments: Amendment No. 3 City of Casselberry I Procurement and Contract Management Division 95 Triplet Lake Drive, Casselberry, Florida 32707 Phone: 407-262-7700, Ext. 1142 1 orocurementOcasselberrv.orq RFP-2019-0467 — SANITARY SEWER, MANHOLE, AND LIFT STATION WET WELL REHABILITATION AMENDMENT NO. 3 This Amendment is made by and between the City of Casselberry, a municipal corporation existing under the laws of the State of Florida, 95 Triplet Lake Drive, Casselberry, Florida 32707 (hereinafter "City") and INLINER SOLUTIONS, LLC, 2531 Jewett Lane, Sanford, Florida 32771 (hereinafter referred to as "Consultant"). W/TNESSETH: WHEREAS, the CITY desires to maintain the services of the Consultant to continue to provide Sanitary Sewer, Manhole, and Lift Station Wet Well Rehabilitation Services and their associated deliverables as further described in Agreement RFP-2019-0467 approved by the CITY COMMISSION, on June 10, 2019 between the CITY and the CONTRACTOR; Amendment No. 1 approved by the Procurement Manager on March 21, 2022; Amendment No. 2 approved by the City Manager on August 2, 2022; and WHEREAS, pursuant to the original agreement, the covenants, terms, and provisions of the Agreement may be modified by way of written instrument, mutually accepted by the parties; and WHEREAS, the purpose of this Amendment is to extend the term and revise the pricing schedule; and WHEREAS, all parties hereto are in agreement with all terms and conditions set forth herein; and NOW, THEREFORE, in consideration of the mutual covenants, terms, and provisions contained herein, the parties agree as follows: Term The Agreement is hereby extended one (1) year from June 10, 2023 through June 9, 2024. This is the final renewal. Compensation The Contractor has submitted a request to revise the pricing schedule as detailed in Exhibit "A", attached hereto and made a binding part hereof. The amount to be paid under this Agreement term will be in accordance with the revised prices as set forth in Exhibit "B" — Revised Pricing Schedule Dated March 2, 2023, attached hereto and made a binding part hereof. There is no change to the total annual compensation amount of One Million and 00/100 Dollars ($1,000,000.00) SIGNATURE PAGE TO FOLLOW City of Casselberry I Procurement and Contract Management Division 95 Triplet Lake Drive, Casselberry, Florida 32707 Phone: 407-262-7700, Ext. 1142 1 Drocurem ent(cDcasselberrv.orq RFP-2019-0467 - SANITARY SEWER, MANHOLE, AND LIFT STATION WET WELL REHABILITATION IN WITNESS WHER OF, the part'es hereto, by their duly authorized representatives, have executed this Agreement effective the2(�' day of � i AD 2023. CITY CA S B Y, FLORIDA By- bavid ' A nson Mayor/Commissioner Attest: CITY CASSELBE Y Donna G. Gardner, CIVIC City Clerk As authorized for execution at the City Commission meeting .of: q1'Qq. '1 INLI E L TION L By: Print: iI.I111 f I�X{Cl {�1 Title: fire $ O 1 ircft(' For a corporation: STATE OF- COUNTYOF The foregoing instrument was acknowledged before me by means of 1.D�-physical presence or ❑ online notarization, this 7.� P-1arcO 2Oz'� date by bante I (1 I F)vra fl l rr rtor (name of officer or agent, title of officer or agent) of '-1h t i fv Jr 01 u4- c'wn s 1 1 1 o (name of corporation acknowledging) , a-.111Oi1 at-, (state or place of incorporation) corporation, on behalf of the corporatio n.(Qshe is personally known to me or has produced (type of identification) as identification. [Notary Seal] EDNA V. TINIS ;`,� 'Notary Publio-Stste of Florida —* *= Commission# HH 311746 My commission Expires January 03, 2027 (—W \CA v - -:i3 U-)A /) Notary Public P(At -\Ci V I 1 i\ 1 Name typed, printed or stamped My Commission Expires: �` City of Casselberry I Procurement and Contract Management Division 95 Triplet Lake Drive, Casselberry, Florida 32707 Phone: 407-262-7700, Ext. 1142 1 Drocurement(cDcasselberrv.orq RFP-2019-0467 — SANITARY SEWER, MANHOLE, AND LIFT STATION WET WELL REHABILITATION Exhibit "A" Letter Communicating Rate Change Dated February 25, 2023 (2 pages) City of Casselberry I Procurement and Contract Management Division 95 Triplet Lake Drive, Casselberry, Florida 32707 Phone: 407-262-7700, Ext. 1142 1 DrocurementO-casselberrv.orq RFP-2019-0467 — SANITARY SEWER, MANHOLE, AND LIFT STATION WET WELL REHABILITATION Exhibit "B" Revised Pricing Schedule Dated March 2, 2023 (3 pages) Inliner Solutions 2531 Jewett Lane finerSanford, FL 32771 r 407.472.0014 inliner.com 02/25/2023 Elsie Burgess City of Casselberry Procurement and Contract Management Division 95 Triplet Lake Drive Casselberry, FL 32707-3252 Dear Ms. Burgess, As you know, 2022 was a year marked by an unprecedented inflationary atmosphere in the globe economy. Following the unanticipated disruption of the domestic and global supply chain for raw materials due to the COVID-19 pandemic, key events throughout 2021 and 2022 have exacerbated the issue. High demand, growing port congestion, ongoing COVID-19 cases, and extreme weather events have all contributed to manufacturing delays and increased material costs. With specific regards for the materials critical to our Casselberry RFP-2019-467 project, these events have obstructed the petrochemical supply chain, disrupting the production of resins, plastics and other materials used in manufacturing. Monitoring these issues closely, we have found that current projections for the return of normalized or pre-COVID- 19 supply chain distribution levels range are unlikely. Given the uncertainty that existed in the global and national markets, Inliner Solutions took steps to secure adequate material inventory, ensuring that the client needs are met, albeit at price levels that to exceeded our bid price levels. We ask for your support as we work to align our material and labor pricing with the unavoidable costs at hand. Based on the our experienced conditions over the past year and current cost forecasts for the 2nd Qtr. Of 2023 and beyond, we request a pricing modification contract pricing on this project based on material impacts as summarized below: 6" CIPP Sewer Main $2.00 / LF 8" CIPP Sewer Main $3.50 / LF 10" CIPP Sewer Main $4.00 / LF 12" CIPP Sewer Main $4.75 / LF 15" CIPP Sewer Main $7.00 / LF 18" CIPP Sewer Main $8.50 / LF Epoxy Liner Application $28.00 / VF These unit price increases reflect our costs impacts described above. A summary of revised unit prices for this project is attached. My team will remain fully transparent with you and your staff with matters pertaining to the market changes and the effects on material pricing. Sincerely, Daniel J. Banken Area Director Exhibit B RFP-2019-0467 - SANITARY SEWER, MANHOLE, AND LIFT STATION WET WELL REHABILITATION SERVICES REVISED PRICE PROPOSAL FORM DATED MARCH 2, 2023 Note: The unit prices entered on the Sample Project 1 and 2 must match the prices offered on this Proposal Form. A. Ancillary Services Unit Mobilization $1,500.00 LS Traffic Control (per day) $100.00 per day Traffic Control (per week) $400.00 per week Light Cleaning $2.00 LF Medium Cleaning $4.00 LF Heavy Cleaning $6.00 LF Root Removal $3.00 LF Tuberculation $35.00 LF Smoke Testing $0.75 LF Easement Access $750.00 EA Bypass Pumping Bypass Piping 6" Sewer Flow $0.25 LF 8" Sewer Flow $0.75 LF 10" Sewer Flow $1.00 LF 12" Sewer Flow $2.00 LF 15" Sewer Flow $3.00 LF 18" Sewer Flow $4.00 LF 20" Sewer Flow $8.00 LF Tanker Truck (Capacity 2400 gallons)*** $350.00 per load Pump Set-up 4" Pump $1,990.00 EA 6" Pump $2,990.00 EA 8" Pump $4,310.00 EA Pump Operation 4" Pump $39.00 per hr 6" Pump $62.00 per hr 8" Pump $84.00 per hr RFP-2019-0467 - SANITARY SEWER, MANHOLE, AND LIFT STATION WET WELL REHABILITATION SERVICES REVISED PRICE PROPOSAL FORM DATED MARCH 2, 2023 B. Cured -in -Place Pipe Lining (CIPP) 6" Sewer Main $52.00 LF 8" Sewer Main $33.50 LF 10" Sewer Main $37.00 LF 12" Sewer Main $44.75 LF 15" Sewer Main $57.00 LF 18" Sewer Main $68.50 LF Lateral Reconnection $250.00 EA Lateral Lining Lateral Lining, up to 15' $3,600.00 EA Lateral Lining, 15' to 30' $3,900.00 EA Lateral Lining, >30' $84.00 LF Additional for Stack Service $2,000.00 EA Service with Pressure Grouting $150.00 EA Clean -Out Installation $950.00 EA C. Sanitary Manhole and Lift Station Wet Well Rehabilitation Epoxy Liner Application (per vertical foot) $343.00 VF Invert Repair $250.00 per MH Vacuum Jet Cleaning (manhole) $50.00 per MH Vacuum Jet Cleaning (wet well) $1,250.00 per WW Removal of Existing Liner $100.00 VF Manhole Inflow Dish $75.00 EA Manhole Chimney Seal or Coating $150.00 per MH Manhole Ring & Cover Repair/Replace $1,665.00 per MH Injection Grouting Manhole Depth 0'-5', up to 55 gallons $500.00 per MH Manhole Depth 5'1"-10', up to 55 gallons $900.00 per MH Manhole Depth 10'1"-15', up to 55 gallons $1,200.00 per MH Manhole Depth over 15', up to 55 gallons $1,500.00 per MH Wet Well, up to 55 gallons $1,750.00 per WW Additional Grout $91.00 per gal D. Emergency Services Mobilization (Emergency) $3,890.00 LS Top Hatting $2,780.00 EA Point Grouting $91.00 per gal CCTV Inspection $1.25 LF RFP-2019-0467 - SANITARY SEWER, MANHOLE, AND LIFT STATION WET WELL REHABILITATION SERVICES REVISED PRICE PROPOSAL FORM DATED MARCH 2, 2023 Cured -in -Place (CIP) Repair Sleeve 6" Sewer Main, 2'-5' $2,780.00 EA 6" Sewer Main, 6'-9' $2,890.00 EA 6" Sewer Main, 10'-12' $3,000.00 EA 6" Sewer Main, 13'-15' $3,120.00 EA 6" Sewer Main, 16'-20' $3,340.00 EA 8" Sewer Main, 2'-5' $2,780.00 EA 8" Sewer Main, 6'-9' $3,000.00 EA 8" Sewer Main, 10'-12' $3,230.00 EA 8" Sewer Main, 13'-15' $3,450.00 EA 8" Sewer Main, 16'-20' $3,670.00 EA 10" Sewer Main, 2'-5' $3,000.00 EA 10" Sewer Main, 6'-9' $3,230.00 EA 10" Sewer Main, 10'-12' $3,450.00 EA 10" Sewer Main, 13'-15' $3,670.00 EA 10" Sewer Main, 16'-20' $3,890.00 EA 12" Sewer Main, 2'-5' $3,340.00 EA 12" Sewer Main, 6'-9' $3,670.00 EA 12" Sewer Main, 10'-12' $4,000.00 EA 12" Sewer Main, 13-15' $4,340.00 EA 12" Sewer Main, 16'-20' $4,670.00 EA 15" Sewer Main, 2'-5' $4,450.00 EA 15" Sewer Main, 6'-9' $5,000.00 EA 15" Sewer Main, 10'-12' $5,560.00 EA 15" Sewer Main, 13'-15' $6,120.00 EA 15" Sewer Main, 16'-20' $6,670.00 EA 18" Sewer Main, 2'-5' $5,560.00 EA 18" Sewer Main, 6'-9' $6,450.00 EA 18" Sewer Main, 10'-12' $7,340.00 EA 18" Sewer Main, 13'-15' $8,230.00 EA 18" Sewer Main, 16'-20' $9,120.00 EA ***Please fill in capacity for tanker truck. City of Casselberry I Procurement and Contract Management Division 95 Triplet Lake Drive, Casselberry, Florida 32707 Phone: 407-262-7700, Ext. 1142 1 Drocurement(&casselberrv.orq RFP-2019-0467 — SANITARY SEWER, MANHOLE, AND LIFT STATION WET WELL REHABILITATION AMENDMENT NO. 2 This Amendment is made by and between the City of Casselberry, a municipal corporation existing under the laws of the State of Florida, 95 Triplet Lake Drive, Casselberry, Florida 32707 (hereinafter "City") and INLINER SOLUTIONS, LLC, 2531 Jewett Lane, Sanford, Florida 32771 (hereinafter referred to as "Consultant"). WITNESSETH: WHEREAS, the CITY desires to maintain the services of the Consultant to continue to provide Sanitary Sewer, Manhole, and Lift Station Wet Well Rehabilitation Services and their associated deliverables as further described in Agreement RFP-2019-0467 approved by the CITY COMMISSION, on June 10, 2019 between the CITY and the CONTRACTOR; and Amendment No. 1 approved on March 21, 2022; and WHEREAS, pursuant to the original agreement, the covenants, terms, and provisions of the Agreement may be modified by way of written instrument, mutually accepted by the parties; and WHEREAS, the purpose of this Amendment is to change the legal name of the firm from Granite Inliner, LLC to Inliner Solutions, LLC, in accordance with the documents within Attachment "A" included herein, and WHEREAS, all parties hereto are in agreement with all terms and conditions set forth herein. NOW, THEREFORE, in consideration of the mutual covenants, terms, and provisions contained herein, the parties agree as follows: Term No Changes to term Compensation No Changes to compensation SIGNATURE PAGE TO FOLLOW City of Casselberry I Procurement and Contract Management Division 95 Triplet Lake Drive, Casselberry, Florida 32707 Phone: 407-262-7700, Ext. 1142 1 Drocurem ent(a)casselberrv.orq RFP-2019-0467 — SANITARY SEWER, MANHOLE, AND LIFT STATION WET WELL REHABILITATION IN WITNESS WHEREOF, the parties hereto, by their duly authorized representatives, have executed this Agreement effective the day of , AD 2022. CITY OF CASSELBERRY, FLORIDA Digitally signed by James James Newlon Newlon By: Date: 2022.08.02 09:16:04-04'00' James R. Newlon City Manager ERr NS By: /V Print: Daniel Banken Title: Area Director For a corporation: STATE OF Florida COUNTY OF Seminole The foregoing instrument was acknowledged before me by means of 8 physical presence or ❑ online notarization, this date by Daniel Banken, Area Director (name of officer or agent, title of officer or agent) of Inliner solutions, LLC (name of corporation acknowledging) , a Indiana (state or place of incorporation) corporation, on behalf of the corporation. He/she is personally known to me or has produced (type of identification) as identification. [Notary Seal] *tl-41r Edna V. Tinis Notary Public NOTARY PUBLICEdna V Tinis STATE OF FLORIDA W.Comm# GG288282 Name typed, printed or stamped Expires 11312023 My Commission Expires: 01/03/2023 2 City of Casselberry I Procurement and Contract Management Division 96 Triplet Lake Drive, Casselberry, Florida 32707 Phone: 407-262-7700, Ext. 1142 1 orocurement0casselberrv.org RFP-2019-0467 — SANITARY SEWER, MANHOLE, AND LIFT STATION WET WELL REHABILITATION Attachment "A" Letter communicating name change dated July 19, 2022 maw soe.roa� wr user X'"""""7 P-F {4't July 19, 2022 City of Casselbeem 95 Triplet Lake Drive Casseberry, FL 32707 RE: Aequis;itiai Complete: Granite miner, LLC is transitions to hilaner Solutions, LLC inland Pipe Rehabilitation (IPR), an investment affiliate of private equity , . . &M Jf_ Lehman & Company, has . -...I the wAuisition of Granite Inbrner and its affiliated companies including LiquiForce, Liner Products and Intoner T- .. I011_.. As part of this &Mdswm the Granite lnkner, LLC name has � .1:. to 1nkner Solutions We have .. . , _ J the prone$ of filing the appropriate amendrnents with the state to complete this name change. Please node, only the name has changed - our legal address, tax U) number(sL and refired agent(s) wil stay the same. Copies of the Sunbiz.ort 1. _ 1. _ . mine change and our updated license are attached. While our name wi11 change, our strong .. . . t to quality work and support of your current and future needs wil not_ Know that our goal remains as it has always been - to work with our customers and partners to safdy execute the work ahead of us and to lead the way with the renewal opportunities of tomorrow_ in the upeonft months, the M ner - , - wit further align and combine with the IPR companies Hot provide CIPP, . , _ ... k . pipe bursting and potable water lining sowtions We believe this combination will produce the most cornpe ling and competitive trendless pipe retu bditaCion solutions and technologies company in North America_ An unmatched product and service portWoo together with an expanded group of prvFessionals, crew team me"e s and equipment will ensure our enhanced ability to provide vakm to your project and the earnnu mbes we serve. Please feel free to reach out to me should you have any questions or concerns. We look forward to remaining your trusted parbwr and source of support for your infrastructure rehabilitation needs. N you have any questtictts, do net hesitate to canted me_ skww*, INLINER SOLUTIONS, LLC_ Daniel J_ Banken Area Director www.infiner.com