Loading...
04-06-1990 Workshop Meeting• • CITYOF CLERMONT MINUTES WORKSHOP MEETING APRIL 6, 1990 A Workshop Meeting of the City Council of the City of Clermont was held Friday, April 6, 1990 in the City Council Chambers. The meeting was called to order at 3:15 p.m. by Mayor Pool with the following Council Members in attendance: Mayor Pro Tem Turville, Council Member Dupe e, Council Member Norquist and Council Member Cole. Also present were City Manager Saunders, representatives from the South Lake YMCA and representatives from the proposed Summit Development. PROPOSED SUMMIT DEVELOPMENT Greg Beliveau of the Land Planning Group gave an introduction of the project. City Manager Saunders explained that the proposed conditions included in the document titled "Attachment A", which was provided for those present, had been reviewed by the Planning and Zoning Commission at their meeting held April 3, 1990, and briefly went over the items for which they had requested modifications, which included: (1) Place sidewalks closer to the back of the curb away from the property line. After discussion, it was the consensus of Council that they should be placed at the property line as required by the City Code. (2) Sidewalks, in some instances, be allowed on back property lines instead of on the street side. After discussion, it was the consensus of Council that a condition could be placed in the Conditional Use Permit that would allow the possibility of rear sidewalks, subject to Council approval for design in specific areas. (3) Clarification of the percentage of mix of the various lot sizes. It was the consensus of Council that no more than 30$ of the development be zero lot line plus the cluster home types. (4) Regarding recreation, it was requested that instead of initially deeding the property to the City, the twenty acres would be designated as public park and by the time the building permit for the 251st unit was issued, the required facilities would be constructed and that portion of the acreage deeded to the City at that time. City Manager stated that in this condition, the City needed to add "Following the DRI review, a new schedule of additional park facilities and construction times would be placed as an additional condition on the Conditional Use Permit". It was the consensus of Council that this condition should be added. It was also concluded that a specific description of the twenty acre designated site should be included as part of the PUD and the site would be dedicated on the plan. (5) Mr. Beliveau indicated that a list of private facilities would be supplied to the City for inclusion in the conditions. The discussion then turned to the issue of the size of the sewage treatment plant for the development. Mr. Jesse Graham stated that he was concerned about the difference between the annual operating .. ~ • CITYOF CLERMONT MINUTES WORKSHOP MEETING APRIL 6, 1990 PAGE -2- costs of the 500,000 gallon plant as opposed to the 125,000 gallon plant they wanted to build. It was agreed that for comparison, the Summit's engineers as well as the City Staff should formulate estimated operating costs for each type of plant and then meet in a future workshop to continue the discussion. A workshop was scheduled for Tuesday, April 17, 1990 at 6:00 p.m. in the City Council Chambers. There being no further discussion, the meeting adjourned at 5:45 p.m. Robert A. Pool, May Attest: Jo E. Van Zi City Clerk