Loading...
Contract 2019-55A CO21Docusign Envelope ID: A72901C9-35B9-42BE-8E01-50473A1D67A0 CHANGE ORDER FORM Contract / P.O. Number: 2019-55 / 20231454 Change Order Number: 21 Project Name: Streetscape Phase 3 Job Location: Not Applicable VENDOR INFORMATION: Company Name: Traverse Group, Inc. Address: P.O. Box 121754 Contact Name: Alicia Roehn Bid Number: RFB 19-051 Change Order Date: Aug 14, 2024 Department: Public Services City, St., Zip: Clermont, FL 34712 Telephone:352-409-6630 DESCRIPTION OF CHANGE: Alteration, deviation, addition, or deletion caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary). Additive change order for allowance due to increase in fuel and concrete costs. ITEM A. ORIGINAL CONTRACT VALUE: B. AMOUNT OF THIS CHANGE ORDER: Must be within the overall scope of services in accordance with contract specifications. C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): D. AMOUNT OF PREVIOUS CHANGE ORDERS: E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 10% Maximum G. NEW CONTRACT VALUE (A+E) This Change Order is not valid without the following signatures: Signed by: 8/14/2024 396EE3AC046D48F... CONTRACTOR Date AMOUNT $ 7,210,249.68 $ 25,265.72 % 0.4% $ 458,529.64 $ 483,795.36 % 6.7% $ 7,694,045.04 PROJECT ARCHITECT / ENGINEER Date DocuSigned by: ir� Signed by: E fbnjV1nw' 8/14/202� ... 8/14/2024 014063B8FF4140FE�8A394C8DEPARTMENT DIRECTOR Date PROCUREMENT DIRECTOR / Date CITY MANAGER Council approval is required if change order(s): 1) exceeds $49,999; 2) exceeds the greater of $100,000 OR 10% of the original contract amount for construction projects; 3) the funds are not available in the approved budget for the department. CITY OF CLERMONT ATTEST: MAYOR Date CITY CLERK Date Rev. 1-1-2021 Docusign Envelope ID: A72901C9-35B9-42BE-8E01-50473A1D67A0 1.8 TEMP CONSTRUCTION FENCING 1 LS $ 2,500.00 $ 2,500.00 1.10 MOT 1 LS $ 3,500.00 $ 3,500.00 1.11 STAKE AND LAYOUT 1 LS $ 3,500.00 $ 3,500.00 1.12 TESTING 1 LS $ 2,500.00 $ 2,500.00 2.7 REMOVE CURB 600 LF $ 13.25 $ 7,950.00 2.11 REMOVE ASPHALT 6000 SF $ 1.55 $ 9,300.00 2.26 REMOVE CONCRETE BASE 6000 SF $ 6.65 $ 39,900.00 3.1 12" SUBGRADE 866 SY $ 3.90 $ 3,377.40 3.3 ROADWAY GRADING 866 SY $ 2.95 $ 2,554.70 3.5 CURB GRADING 200 SY $ 6.30 $ 1,260.00 3.10 EXCAVATE ROADWAY 200 CY $ 7.69 $ 1,538.00 3.17 REMOVAL FILL 200 CY $ 7.95 $ 1,590.00 3.18 FINAL DRESSING 1 LS $ 750.00 $ 750.00 5.1 REMOVE EXISTING manhole 1 EA $ 1,750.00 $ 1,750.00 5.6 REMOVE 15" RCP 300 LF $ 25.00 $ 7,500.00 5.13 18" RCP 300 LF $ 89.95 $ 26,985.00 5.17 STORM DRAIN MANHOLE 2 EA $ 4,665.00 $ 9,330.00 9.2 6" RECYCLED CONCRETE ROAD BASE 700 SY $ 16.65 $ 11,655.00 9.6 1" SP 9.5 ASPHALT BASE COURSE 700 SY $ 10.95 $ 7,665.00 9.6.1 1" SP 9.5 ASPHALT OVERLAY 700 SY $ 8.95 $ 6,265.00 9.7 TACK 700 SY $ 2.00 $ 1,400.00 10.7 F CURB 600 LF $ 36.75 $ 22,050.00 Docusign Envelope ID: A72901C9-35B9-42BE-8E01-50473A1D67A0 10.10 CONCRETE DRIVEWAYS 15.28 SOD 1.2 Payment and Performance Bond - Increase due to additional bondinq charqe(s) 2% 3 EA $ 1,500.00 $ 4,500.00 2400 SF $ 0.45 $ 1,080.00 1 LS $ 3,623.00 TOTAL $ 184,773.10 Docusign Envelope ID: A7290lC9-35B9-42BE-8EO1-50473AlD67AO STREETSCAPE PHASE ESCALATION CLAUSE - QUARTERLY PER CITY REQUEST (2) JAN THROUGH JULY 2024 CONCRETE 3000PSI BID $142.86 TTL YD P/CY +/- DUE BID 2/2024 $ 176.88 112 CY $ 34.02 $ 3,810.24 1/2024 3/2024 $ 176.55 32 CY $ 33.69 $ 1,078.08 2/2024 5/2024 $ 176.55 20 CY $ 33.69 $ 673.80 3/2024 6/2024 $ 176.55 39 CY $ 33.69 $ 1,313.91 4/2024 7/2024 $ 177.10 49 CY $ 34.24 $ 6,063.90 5/2024 6/2024 7/2024 $ 12,939.93 Concrete $ 12,939.93 Fuel Onroad $ 3,103.62 Fuel Offroad $ - Asphalt $ 8,726.76 TOTAL ESCALATION INCREASE $ 24,770.31 FUEL (AVERAGE ON ROAD) $ 3.19 TTL GLN P/GALLON +/- DUE BID $ 3.78 723.18 GA $ 0.59 $ 426.68 $ 4.00 671.81 GA $ 0.81 $ 544.17 $ 3.90 236.25 GA $ 0.71 $ 167.74 $ 3.83 370.87 GA $ 0.64 $ 237.36 $ 3.74 593.63 GA $ 0.55 $ 326.50 $ 3.63 786.66 GA $ 0.44 $ 346.13 $ 4.02 1271.15 GA $ 0.83 $ 1,055.05 $ 3,103.62 FUEL (AVERAGE OFF ROAD) $ 3.19 TTL GLN P/GALLON +/- ASPHALT 9.5 DUE BID $ 62.00 TON P/TON 2/2024 $ 95.17 63.03 TNS 3/2024 $ 99.64 76.58 TNS 5/2024 $ 100.58 10.05 TNS 6.2024 $ 85.20 145.08 TNS +/- DUE $ 33.17 $ 2,090.71 $ 37.64 $ 2,882.47 $ 38.58 $ 387.73 $ 23.20 $ 3,365.86 $ 8,726.76