Contract 2023-028A CO (3)Docusign Envelope ID: 084A8907-402D-41 EE-AFDF-FB8DBCDD603F CHANGE ORDER FORM Contract / P.O. Number: 2023-028 / 20235048 Change Order Number: 8 Project Name: East Side Water Reclamation Facility Job Location: Clermont East WRF VENDOR INFORMATION: Company Name: Vogel Bros. Building, Co. Address: 2720 Drane Field Road Contact Name: Andrew Decker Bid Number: RFB 23-002 Change Order Date: Aug 20, 2024 Department: Public Services City, St., Zip: Lakeland, FL 33811 Telephone:(863) 646-5078 DESCRIPTION OF CHANGE: Alteration, deviation, addition, or deletion caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary). Additive change order in the amount of $12,928.50 to purchase materials to etrofit two gates. Seer attached information. ITEM AMOUNT A. ORIGINAL CONTRACT VALUE: $ 44,300,000 B. AMOUNT OF THIS CHANGE ORDER: $ 12,928.50 Must be within the overall scope of services in accordance with contract specifications. C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): % 0.0% D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 140,318.84 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $ 153,247.34 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 10% Maximum % 0.3% G. NEW CONTRACT VALUE (A+E) $ 44,453,247.34 This Change Order is not valid without the following signatures: EDocuSigned by: DocuSigned by: AwtA& Vbql 8/28/2024 E 4� 6kvu" 8/28/2024 55CD3AA529D0464 CBB944C6F285425 CONTRACTOR Date PROJECT ARCHITECT / ENGINEER Date Es DocuSigned by: DocuSigned by: fbint,y bVWASbV1 8/29/2024 4 a%k" 8/29/2024 014063B8FF4140F... 431F57D413554D6... DEPARTMENT DIRECTOR Date PROCUREMENT DIRECTOR / Date CITY MANAGER Council approval is required if change order(s): 1) exceeds $49,999; 2) exceeds the greater of $100,000 OR 10% of the original contract amount for construction projects; 3) the funds are not available in the approved budget for the department. CITY OF CLERMONT ATTEST: MAYOR Date CITY CLERK Date Rev. 1-1-2021 Docusign Envelope ID: 084A8907-402D-41 EE-AFDF-FB8DBCDD603F 'V'400 Cw" 3ML SROS. 33UILDIMG CO. better people = better builders` August 8, 2024 Kinz Consulting LLC 235 Harbour Cove Way Clermont, FL 34711 Attn: James Kinzler RE: PCO#10 HW Gate Retrofit Modifications Mr. Kinzler, Two gates at the HW (10-WG13,14) required additional materials to provide a retrofit type installation. The costs for these modifications are itemized on the attached and no additional labor has been requested. Vogel Bros. Building Co. is requesting a change order be issued for $12,928.50 for this change and that, at this time, no additional time be added to the contract completion date. The breakdown of these additional costs is attached. Should you have any questions concerning this request, please do not hesitate to contact me. Sincerely, 'VTOQ-: asos. as:naaxa ao. better people =eemra,ieeW08/08/2' Andrew Decker Director of Operations Vogel Bros. Bldg. CC: File CC: Darren Vogel P.E. 2720 Drone Field Road, Lakeland, FL 33811 1 863.646.5078 office I CGC 1509018 An Equal opportunity Employer CD 431- 30 L PCO#10 HW Gate Retrofit Modifications 8I111,O 8. B U I L DI W O Co. PROJECT: Cle rntmt East WRP Proposal # 010 better people =better builders' OWNER: Cit, of Ckrmont DATE: 8/B/2024 ENG: Tetra Tech PREPARED BY: ARD Vogel Brothers will provide all necessary labor, materials, equipment, tools and supervision required to execute the work scope defined herewith, in accordance with this proposal, for the amount listed below. This quotation contains items only as listed herein. Any additional items not listed will be subject to additional compensation. Any additional time required to perform this work is listed herewith. Written confirmation of your acceptance is required before work can commence. Item 1-Addittional Materials to provide retro fit Installation of HW gates at Grit area PROPOSAL BREAKDOWN CREDITS LABOR MATERIAL EQUIPMENT SUBCONTRACT ITEM DESCRIPTION QTY UNITS UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTAL TOTAL. y Retmfft Gate lustallalon 1 Is f $ S S 11050.00 S 11050.00 s $ S $ $ 11,050.00 s s $ $ s $ s s s s $ s $ - 3 - _ S - $ - S - ! $ - $ - 8 - _- P S $ 5 - 8 - $ - S - S $ - S - �$UMMARY: S - S S - S 11,050.00 S $ - $ 11,05wx) Tax re 6 % of Taxable Materials 6.0(P.[ Small Tools (0 4% of Labor 4.00..1.I $ SUBTOTAL DIRECT COST: S 1I,OSO.1M7 Bonds and Insurance u 2%of Dimct Cost $ 221.00 Allowed OH&P on Subcontracted Work 111.OtW.-:j S Allowed OH&P on Direct Coat 15.00'7.I $ 1,657.50 GRAND TOTAL 112,928.5111 VBBC is requesting for the contract completion dates to belInereased-,Been as a result of this Change Proposal. This guoration is valid for M days from this nronosals date. Written Accentance is reuuired for this work to commence V,Wl Urns Building Co Tetra Te Contractor Owner Engineer By By By. aw,-�a�a.�«.� 8120249:30:51 AM -2024 Date: Date: � S Dat 8R05. BUXLDING CO. PROJECT: OWNER Better people = better builders' ENG: Item No. Description MATERIAL RW Gate Expendables EQUIPMENT LABOR Foreman (No Charge) Carpenter (No Charge) SUBCONTRACT W 0- 0 c W c N U O WORK SCOPE BREAKDOWN Clermont East WRF Proposal # 010 0 City of Clermont DATE: 8/8/2024 Tetra Tech PREPARED BY: ARD PCO#10 HW Gate Retrofit Modifications CITY Units Material Equipment Labor Sub U/P Total U/P Total U/P Total U/P Total Subtotal 1 L5 $10,900.00 $10,900.00 1 LS $ 150.00 $ 150.00 8 16 $ 67.95 $ $ 50.59 $ $ 11,050.00 $ $ $ - $ 11,0S0.00 Tax @ 6% of Taxable Material: Small Tools @ 4% of Labor: $ - Subtotal Direct Cost: $ 11,050.00 Bonds and Insurance @ 2% of Direct Cost $ 221.00 Allowed OH &P an Subcontracted Work @10%: $ Allowed OH &P on Direct Cost @15%: $ 1,657.50 Total: $ 12,928.50 n Docusign Envelope ID: 084A8907-402D-41 EE-AFDF-FB8DBCDD603F RW GATE COMPANY 79102"a Street — Suite 100 r� COMPANY TROY, NEW YORK 12180 518-874-4750 518-274-0210 weasME: www.rwgate.com (,QUOTATION August 1, 2024 To: Tammy Saxman @ Vogel Bros. Construction Project: Clermont, FL - East Side WRF Expansion Parts for Existing Weir Gates Dear Tammy: Quotation #QT01024165 Following is our quotation for the two f21 sets of n_ arts for existing weir gates on the referenced project. Our offering is as follows: Item No. 01- Pretreatment - Grit Removal Effluent Channel Qty. - Size: Two (2) set of parts for 60" wide x 54" tall weir gates Design Seating Head / Design Unseating Head (invert to MWL): 4.5' / 4.5' Tag: 10-WG-13,10-WG-14 Dwg No.: see RW Gate Dwg No. 23138-060 Description: Each set of parts will consist of the reinforced 304/304L stainless steel structural member and 316 stainless steel attachment hardware. Mounting Style: The modified guides will be wall surface mounted with 316 stainless steel adhesive anchors and non -shrink grout. Anchor studs, nuts and washers are included. NOTE: Contractor to provide field drilling and assembly of parts as shown on the drawings. If any field welding is performed, passivation and clean-up of welds to provide a uniform finish is required. TOTAL SELLING PRICE: $ 10.900.00 Quotation #QT01024165 Page 1 Docusign Envelope ID: 084A8907-402D-41 EE-AFDF-FB8DBCDD603F GENERAL: Our quotation is based on our best interpretation of the information provided and the description listed herein. Please review the quotation and advise our local representative, Gerald Mendez of TSC-Jacobs North at 813-625-3318, if there are any discrepancies between the details in this quotation and the actual requirements. The pricing and deliveries listed in the body of the quotation will be held for 30 days from the date on Page 1. RW Gate is ISO 9001:2015 certified. RW Gate complies with AIS and Buy American requirements. INCLUDED: Submittal drawings, installation instructions and 0&M manuals. Installation instructions will be forwarded with the equipment. Information will be sent electronically unless otherwise indicated by the customer. EXCLUDED: The following items are specifically excluded; demolition, installation, field measurements, bulkheads, blind flanges, plugs, concrete, grout, gaskets, mastic, lubricants, grating, handrail, cover plates, epoxy for anchors and all taxes including local and state sales tax. PAYMENT: Net 30 days. Please contact RW Gate prior to payment via credit card. An additional charge may be necessary when paying by credit card. FREIGHT: Full freight to the project site is included. Unloading will be the responsibility of others. STANDARD DELIVERY: Submittal drawings will ship within 1-2 weeks of receipt of a purchase order. The parts will ship 10-12 weeks after receipt of approved submittal drawings. Please contact our local representative for expedited or extended delivery dates. FIELD SERVICE: Field service is not included. If field service is required, please contact our local representative for revised pricing. Please provide a 3-week notice for field service. Best Regards, Eva+' Wks' Evan Whipps RW Gate Company ewhipps0rwgatP,.cgM ■ MM4%" www.RWGATE.com Quotation #QT01024165 Page 2