1963-02AGREEMENT THIS AGREEMENT, made this 30th day of July ,1963, by and between Jack Sharpe's Inc of Orlando, Florida, Party of the First Part, and the City of Clermont, Florida., a municipal Corporation of. the State of Florida Party of the Second Part. WITNESSETH: That in consideration of the mutual covenants herein con- tained it is agreed as follows 1. That party of the First Part agrees to completely recond- ition Party of the Second Part's two (2) elevated water storage tanks & towers in said City of Clermont as follows; and in accordance With A.W. W.A.. specifications D10l-53 and DI02-55T, or latest revisions thereof. 50,000 Gal. Tank: Repair Replace catwalk support rods with new 1" round iron lugs bolts and nuts, also 3/16" floor plate deck, flush welded to angle stri- ngers Separate roof seams, clean, rebolt and/or weld also cut a- way badly rusted roof eave (approx. 6"). Furnish and install 18" roof vent (replacing present finale ball), and recondition and remodel roof ladder to accommodate aforemen- tioned vent, ,and install securing device. Separate roof ladder from tank ladder and secure same to side wall of tank wt. 6-4" x 5/16" brackets butt welded to ladder runners Repack and adjust expansion joint, replacing section of riser extending througn expansion joint, if condition warrants same. Furnish and install roof angle, replacement of 3/8" x 3" steel plate cut on proper radius and welded continualy to side wall of tank 2" below present deteriorated roof angle, then remove present deteriorated roof angle. Furnish and install 14-:3/8" x 6" gussets welded to aforemen- tioned roof angle replacement and tank wall, equally spaced Furnish and install 3/8" wedge gussets welded to roof angle replacement and roof on approximately 3 ft. centers, to secure roof, re- placing deteriorated and missing holddown.bolts Furnish and install 14 3/4" round iron spider rods threaded one end and spider rod disc of 3/8" plate with 3/8" x 3" flange having 14 7/8" holes equally spaced for receiving spider rods, 14 3/4" nuts for adjusting rods, rods to be lapped 2" on new roof angel wt. 1/2" fillet continuous Cut accessway in eave of roof in line with tank ladder and install 3/4" round iron safety ring Furnish and install complete telltale assembly with cable guides and conical plastic float Furnish and install 4" gate valve in bowl of tank accessible from catwalk, with 4" pipe extending from valve to 3 ft beyond ladder leg Furnish and install standard pressed steel manhole in bowl of tank near riser and accessible from catwalk. Furnish and install inside tank, ladder fabricated of 5/16" x 2" runners, 12" wide wt. 3/4" round iron rungs on 12" center, secured to side wall wt. 6-3/8" x 4" x 6" cleats, welded. Any additional repair, replacements, welding of seams, rivets, or pits necessary to put tank and tower in first class condition so as to warrant the maintenance portion of this Agreement Cleaning & Painting: Interior Sandblast entire interior of tank including all appurtenances to bare grey metal, removing all rust and foreign matter Furnish and apply three (3) coats of Quigley's # 111 to entire interior of tank, including all appurtenances. Exterior Sandblast entire exterior of tank and tower to bare grey metal, removing all rust and foreign matter Furnish and apply one (1) coat of primer and two (2) coats of aluminum to entire exterior of tank and tower. 100,000 Gal Tank: Repair ' Weld column ladder brackets to ladder runners and column, continuously. Furnish and install 4" gate valve in bowl of tank near riser accessible from catwalks with 4" pipe extending from valve to 3 ft be- yond ladder column. Separate roof ladder from tank ladder, install securing de- vice for roof ladder, furnish and install 6 3/8" x 4" x 6" tank ladder securing brackets, welded to tank wall, and butt welded to ladder runners Cleaning & Painting: Interior. . Sandblast entire interior and all appurtenances to bare grey metal, removing all rust, paint and foreign matter. , Furnish ,and apply three (3) coats ot Quigley's # 111 to entire interior, including all appurtenances. Exterior: Sandblast balcony floor and 2 ft. of side wall above balcony floor complete to bare grey metal, .removing all. rust, paint and foreign matter. spot sandblast remainder of tank and tower, removing all rust loose paint and foreign matter. Spot prime all bare metal. Spot paint all primed area with one (1) coat of aluminum and then paint entire exterior of tank and tower Materials: Roylac aluminum # 9421 Royston Vinachrome primer # A-900 Quigley's # 111, Brown & Black Procedure: Sandblasted area to be primed each day while thoroughly clean and dry. All primer and paints to be applied as directed by manufacturer... Current for electric tools, chlorine and water for steriliz- ation in compliance with Florida State Board of Health regulations to be furnished by Party of the Second Part. And to maintain the. interior and exterior of Party of the Second Part's elevated water storage tanks and towers in said City ser- viced as herein outlined, for a period of twelve (12) years, from date of this Agreement 2: Party of the First Part further agrees that he will in- spect said tanks and towers, annually, and will keep the interior of tanks free of excessive foreign matter and properly flushed. 3: That during the period of this Agreement, Party of the Second Part has the responsibility of keeping the telltale devices and expansion joints properly adjusted 4: Party of the First Part hereby agrees to take care of all maintenance of said tanks and towers, including all steel and, other materials necessary for said maintenance, except as herein otherwise provided; and except from damage by Acts of God, Wind, Airplane, Sett- lIng of Foundations, Accident, or Vandalism 5: Party of the First Part agrees to paint said tanks and towers during the fourth, eighth, and twelfth year of this Agreement after removlng any and all rust, priming bare surface, and spot painting primed surface Such painting to cover interior of tanks and exterior of tanks and towers 6 Party of the Second Part hereby agrees to pay Party of the First Part the sum of, one thousand nine hundred five dollars and fifty cent ($1,905.50) upon completion of reconditioning as set forth in para~ graph one, and one thousand nine hundred five dollars and fifty cent ($ l,.905.50) per year for the term of this contract for services and material as herein provided. Said payments. to be made upon receipt.of annual reports, as outlined in paragraph 2 7Party of theFirst Part assumes no responsibility whatever for any damages, either personal injury or property injury sustained by anyone while in, on or around said tanks and towers, other than damages caused by employees of Party of. the First Part, while said employees are actually on the job performing services under this contract, as herein before outlined. While such stated services are being performed Party of the First Part agrees to carry Workmans Compensation, Public Liability & Property Damage Insurance in a minimum amount of fifty and one hundred thousand doll.ar~ ($ 50,000.00 & $100000.00). 8: Party of the First Part agrees to do aforementioned work under the supervisionof Party of the Second Part's authorized inspector, to assure that all work is done in a competent and workmanlike manner and materials are as outlined in this Agreement or approved equal. 9: This contract shall be binding upon the parties hereto and their successors, and assigns., for the terms created hereby, and may not be altered, cancelled, or changed except upon the mutual consent of both parties hereto and evidenced in wrlting. IN WITNESS.. WHEREOF, THE, PAETIES have set their hands. and seam the day and year first above wriltten. Signed Sealed & Delivered. in the presence of